from:mansoor.abdmoulaie@enron.com means Mansoor Abdmoulaie (mansoor.abdmoulaie@enron.com).
-
21 Jun 2001
Mansoor Abdmoulaie to Michelle Lokay and 4 more
TW/ Conoco in Lea County, NM
This is a follow up to our meeting of 6-13-2001 TW/ Conoco project in Lea County, NM. The following is a summary of the facility requirements and a level "A" cost estimat…
-
12 Jun 2001
Mansoor Abdmoulaie to Michelle Lokay and 4 more
Conoco/TW at Monument--- level "A" +/- 30% cost estimate
Design volume=60 mmcf/d at 700 psig The following is a summary of facility requirements and the associated cots to tie Conoco to TW-10" suction side of the Monument Compr…
-
8 Jun 2001
Mansoor Abdmoulaie to Kevin Hyatt and 10 more
RE: ConocoProjReqForm.xls/ Monument System
The existing capacity of this system is 38 mmcf/d. Now that we know where the exactl location of the tie-in is and based on your input I have created two flow modeling op…
-
1 Jun 2001
Mansoor Abdmoulaie to Perry Frazier and 2 more
Keystone capacity
The Keystone capacity at 500 psig suction pressure & 800 psig discharge pressure Summer: 95 mmcf/d Winter 100 mmcf/d Mansoor
-
18 May 2001
Mansoor Abdmoulaie to Michelle Lokay and 6 more
New Supply Opportunity
Michelle I have checked the location of the Wizard#1 well. According to the legal description, the well is located approximately 6 miles north of WT-1. I have listened to…
-
16 May 2001
Mansoor Abdmoulaie to Kevin Hyatt and 2 more
TW/ Questar interconnects in two locations
FYI and also I will get back with you within a week. Mansoor
-
10 May 2001
Mansoor Abdmoulaie to Kevin Hyatt and 4 more
Cost Estimate for MAOP facility requirements
Kevin I have completed the following costs for the MAOP facility requirements project but have not completed yet the cost of 55,90 and 115 mmcf/d alternatives on the San …
-
10 Apr 2001
Mansoor Abdmoulaie to Kevin Hyatt and 8 more
TW/ Agave---Atoka-3 capacity
This is in response to our meeting of April-10-2001 in Midland with Agave. Assuming units #761 and #762 are now assigned to LEC-10" service, the below schematic is showin…
-
5 Apr 2001
Mansoor Abdmoulaie to Lorraine Lindberg and 30 more
TW-West Texas Expansion Level "A" release cost estimate 4/5/2001
This is in response to your request of 3-26-2001 regarding the expansion of TW pipeline system in West Texas. Current Facility Capacity Summary Compression capacity at WT…
-
3 Apr 2001
Mansoor Abdmoulaie to Kevin Hyatt and 8 more
New Compressor Station in Eddy County, NM.
As I mentioned the other day, one of the possible ways to receive high volume of gas from our customers is to design and construct new compression facilities adjacent to …
-
27 Mar 2001
Mansoor Abdmoulaie to Lorraine Lindberg and 6 more
TW/ BP in Eddy County, NM.
This is a level "A" cost estimate (?30%) to tie BP's gas to TW high-pressure line in Eddy County NM. A) 30 mmcf/d case (BP pressure=1000 psig): 13 miles of 10" (OD) pipel…
-
22 Feb 2001
Mansoor Abdmoulaie to Kevin Hyatt and 18 more
TW/ Agave ----meeting of Feb-8-2001
Kevin This is a summary of my response to the meeting of Feb-8-2001 with Agave in Houston. Please, let me know if am missing any thing from that meeting. Also please let …