12 Jun 2001, 19:45 UTC
Conoco/TW at Monument--- level "A" +/- 30% cost estimate
- From
- Mansoor Abdmoulaie mansoor.abdmoulaie@enron.com
- Date
- Tue, 12 Jun 2001 12:45:30 -0700 (PDT)
Design volume=60 mmcf/d at 700 psig The following is a summary of facility requirements and the associated cots to tie Conoco to TW-10" suction side of the Monument Compressor Station. Facilities A-release Costs($) 10X8" Tee & side valve 30,000 EFM, DAS,RTU, Chromatograh 130,000 and H2o Analyzer and buildings. 8"-Ultrasonic measurements 40,000 Flow control valve with pressure override 135,000 and Isolation valve Overhead 15% 50,250 Contingency 10% 33,500 Total $418,750 If you have any questions please call.