27 Mar 2001, 19:37 UTC
TW/ BP in Eddy County, NM.
- From
- Mansoor Abdmoulaie mansoor.abdmoulaie@enron.com
- Date
- Tue, 27 Mar 2001 11:37:16 -0800 (PST)
This is a level "A" cost estimate (?30%) to tie BP's gas to TW high-pressure line in Eddy County NM.
A) 30 mmcf/d case (BP pressure=1000 psig):
13 miles of 10" (OD) pipeline and interconnect facilities at an estimated cost of $3,600,000.
B) 75 mmcf/d case (BP pressure =1000 psig):
Option-1): 13 miles of 16"(OD) and interconnect facilities at an estimated cost of $6,000,000.
Option-2): 13 miles of 10", interconnect facilities and a 600-hp unit at an estimated cost of
$4,700,000.
If you have any questions please call me.