from:mansoor.abdmoulaie@enron.com means Mansoor Abdmoulaie (mansoor.abdmoulaie@enron.com).
to:perry.frazier@enron.com means Perry Frazier (perry.frazier@enron.com).
-
30 Jan 2002
Mansoor Abdmoulaie to don.stacy@enron.com, Kimberly Watson, Lindy Donoho and 7 more
February -1 Capacity Analysis System ( CAS) meeting
There is a great concern from TW Planning/ Marketing that the existing CAS system is not responding to our expectations. While we have corrected numerous bugs in the prog…
-
28 Jan 2002
Mansoor Abdmoulaie to Kimberly Watson, Michelle Lokay and 8 more
RE: CAS System
It seems like Tuesday Jan-29, 9-10:30 am ( in my office) looks good for Kim and I hope for the rest of us so please let's attend the meeting. Mansoor
-
28 Jan 2002
Mansoor Abdmoulaie to Kimberly Watson, Michelle Lokay and 8 more
CAS System
We in TW- Planning would like to schedule a meeting with you to discuss !): the current CAS operations 2): ways to improve the efficiency/ speed of the system. Please sel…
-
10 Jan 2002
Mansoor Abdmoulaie to Earl Chanley and 18 more
TW/ Questar new interconnect -------Level "B" release cost estimate
Per Kim Watson request of 1-10-2002, please develop a scope and "B" release cost estimate to tie Questar - 12" line to TW-30" - Blanco Hub at suction side of the Bloomfie…
-
23 Jul 2001
Mansoor Abdmoulaie to Kimberly Watson and 8 more
WT-2 capacity
Planning has conducted flow studies to determine the capacity of WT-2 system with respect to receiving volume from NNG at Halley interconnect. The limiting factors in det…
-
8 Jun 2001
Mansoor Abdmoulaie to Kevin Hyatt and 10 more
RE: ConocoProjReqForm.xls/ Monument System
The existing capacity of this system is 38 mmcf/d. Now that we know where the exactl location of the tie-in is and based on your input I have created two flow modeling op…
-
1 Jun 2001
Mansoor Abdmoulaie to Perry Frazier and 2 more
Keystone capacity
The Keystone capacity at 500 psig suction pressure & 800 psig discharge pressure Summer: 95 mmcf/d Winter 100 mmcf/d Mansoor
-
10 Apr 2001
Mansoor Abdmoulaie to Kevin Hyatt and 8 more
TW/ Agave---Atoka-3 capacity
This is in response to our meeting of April-10-2001 in Midland with Agave. Assuming units #761 and #762 are now assigned to LEC-10" service, the below schematic is showin…
-
5 Apr 2001
Mansoor Abdmoulaie to Lorraine Lindberg and 30 more
TW-West Texas Expansion Level "A" release cost estimate 4/5/2001
This is in response to your request of 3-26-2001 regarding the expansion of TW pipeline system in West Texas. Current Facility Capacity Summary Compression capacity at WT…
-
3 Apr 2001
Mansoor Abdmoulaie to Kevin Hyatt and 8 more
New Compressor Station in Eddy County, NM.
As I mentioned the other day, one of the possible ways to receive high volume of gas from our customers is to design and construct new compression facilities adjacent to …
-
22 Feb 2001
Mansoor Abdmoulaie to Kevin Hyatt and 18 more
TW/ Agave ----meeting of Feb-8-2001
Kevin This is a summary of my response to the meeting of Feb-8-2001 with Agave in Houston. Please, let me know if am missing any thing from that meeting. Also please let …