Enron email

Algorithmic Indexing

11 messages for to:perry.frazier@enron.com from:mansoor.abdmoulaie@enron.com

Newest Oldest

Matching messages by month
Skilling resigns
Q3 loss announced
Bankruptcy filing

from:mansoor.abdmoulaie@enron.com means Mansoor Abdmoulaie (mansoor.abdmoulaie@enron.com).

to:perry.frazier@enron.com means Perry Frazier (perry.frazier@enron.com).

  1. 30 Jan 2002

    Mansoor Abdmoulaie to don.stacy@enron.com, Kimberly Watson, Lindy Donoho and 7 more

    February -1 Capacity Analysis System ( CAS) meeting

    There is a great concern from TW Planning/ Marketing that the existing CAS system is not responding to our expectations. While we have corrected numerous bugs in the prog…

  2. 28 Jan 2002

    Mansoor Abdmoulaie to Kimberly Watson, Michelle Lokay and 8 more

    RE: CAS System

    It seems like Tuesday Jan-29, 9-10:30 am ( in my office) looks good for Kim and I hope for the rest of us so please let's attend the meeting. Mansoor

  3. 28 Jan 2002

    Mansoor Abdmoulaie to Kimberly Watson, Michelle Lokay and 8 more

    CAS System

    We in TW- Planning would like to schedule a meeting with you to discuss !): the current CAS operations 2): ways to improve the efficiency/ speed of the system. Please sel…

  4. 10 Jan 2002

    Mansoor Abdmoulaie to Earl Chanley and 18 more

    TW/ Questar new interconnect -------Level "B" release cost estimate

    Per Kim Watson request of 1-10-2002, please develop a scope and "B" release cost estimate to tie Questar - 12" line to TW-30" - Blanco Hub at suction side of the Bloomfie…

  5. 23 Jul 2001

    Mansoor Abdmoulaie to Kimberly Watson and 8 more

    WT-2 capacity

    Planning has conducted flow studies to determine the capacity of WT-2 system with respect to receiving volume from NNG at Halley interconnect. The limiting factors in det…

  6. 8 Jun 2001

    Mansoor Abdmoulaie to Kevin Hyatt and 10 more

    RE: ConocoProjReqForm.xls/ Monument System

    The existing capacity of this system is 38 mmcf/d. Now that we know where the exactl location of the tie-in is and based on your input I have created two flow modeling op…

  7. 1 Jun 2001

    Mansoor Abdmoulaie to Perry Frazier and 2 more

    Keystone capacity

    The Keystone capacity at 500 psig suction pressure & 800 psig discharge pressure Summer: 95 mmcf/d Winter 100 mmcf/d Mansoor

  8. 10 Apr 2001

    Mansoor Abdmoulaie to Kevin Hyatt and 8 more

    TW/ Agave---Atoka-3 capacity

    This is in response to our meeting of April-10-2001 in Midland with Agave. Assuming units #761 and #762 are now assigned to LEC-10" service, the below schematic is showin…

  9. 5 Apr 2001

    Mansoor Abdmoulaie to Lorraine Lindberg and 30 more

    TW-West Texas Expansion Level "A" release cost estimate 4/5/2001

    This is in response to your request of 3-26-2001 regarding the expansion of TW pipeline system in West Texas. Current Facility Capacity Summary Compression capacity at WT…

  10. 3 Apr 2001

    Mansoor Abdmoulaie to Kevin Hyatt and 8 more

    New Compressor Station in Eddy County, NM.

    As I mentioned the other day, one of the possible ways to receive high volume of gas from our customers is to design and construct new compression facilities adjacent to …

  11. 22 Feb 2001

    Mansoor Abdmoulaie to Kevin Hyatt and 18 more

    TW/ Agave ----meeting of Feb-8-2001

    Kevin This is a summary of my response to the meeting of Feb-8-2001 with Agave in Houston. Please, let me know if am missing any thing from that meeting. Also please let …