TW/ Questar new interconnect -------Level "B" release cost estimate
- From
- Mansoor Abdmoulaie mansoor.abdmoulaie@enron.com
- To
- Earl Chanley
- Cc
- Kimberly Watson, Ron Matthews, Dennis Alters, Perry Frazier, Morgan Gottsponer, Darrell Schoolcraft, Rich Jolly, David Roensch, Norm Spalding
- Bcc
- Kimberly Watson, Ron Matthews, Dennis Alters, Perry Frazier, Morgan Gottsponer, Darrell Schoolcraft, Rich Jolly, David Roensch, Norm Spalding
- Date
- Thu, 10 Jan 2002 12:57:11 -0800 (PST)
Per Kim Watson request of 1-10-2002, please develop a scope and "B" release cost estimate to tie Questar - 12" line to TW-30" - Blanco Hub at suction side of the Bloomfield Compressor Station in San Juan County, New Mexico as shown in the attached station- schematic. Volume design: 80-120 mmcf/ d Pressure: 870-920 psig Gas Quality: Blanco Hub gas Specific Gravity: 0.60 Line segment No: Call you tomorrow on this. Facility requirements as discussed with Questar in November-2001: Tap& Valve Meter run H2o monitor Chromatograph Pressure/ Flow Control-valves Positive shut-in EFM DAS GFC