  1. 13 Feb 2002

    Ron Matthews to Bill Rapp and 12 more

    Bloomfield Inlet Air Cooler Project

    Bill, The following is a brief desciption of the above mentioned project. The Bloomfield air inlet cooler project consist of the installation of evaporative pads around t…

  2. 12 Feb 2002

    Ron Matthews to Michelle Lokay, James Centilli and 4 more

    Bakersfield Power Plants Project

    Attached is an Excel spreadsheet showing the costs to build a 20-mile 20" pipeline from PG&E to Bakersfield. Thereis a sheet for the pipeline and one for the measurement.…

  3. 12 Feb 2002

    Ron Matthews to acook@utilicorp.com and 6 more

    Transwestern Historical Pressures - Kingman

    Alan, Attached is an Excel spreadsheet with historical pressures at two points. The column titled south of Kingman will be the closes point off TW's mainline to the Red L…

  4. 8 Feb 2002

    Ron Matthews to Lindy Donoho and 6 more

    TW History

    This is very lengthy but the best I can do in a rush. Didn't have time to research all of the times and miles of pipe but did the best I could. If we need the details, le…

  5. 29 Jan 2002

    Ron Matthews to Kevin Hyatt, Eric Gadd and 4 more

    Sun Devil Cases

    Attached are the 750 & 1000 MMcf/d cases we discussed earlier. I've copied Doug Cybrek too so he will have the latest. Ron Matthews

  6. 28 Jan 2002

    Ron Matthews to Ben Asante, Dennis Alters, Darrell Schoolcraft and 5 more

    San Juan Lateral 10 MM/d Expansion

    I'm getting old! Wondered why I couldn't find this is my sent folder. Still in my draft folder. Please review ASAP. This will be sent to Steve Harris, Kim Watson, and Lor…

  7. 25 Jan 2002

    Ron Matthews to Morgan Gottsponer, Ben Asante, Dennis Alters and 8 more

    FW: Bloomfield horsepower

    This shows that with a 350 Hp increase per unit, we would still not exceed operational Hp even in the winter. We max out about 4500 Hp in the summer on a good day and thi…

  8. 16 Jan 2002

    Ron Matthews to Steven Harris, Kimberly Watson, Lorraine Lindberg and 7 more

    San Juan Expansion Options - Small Volume

    Marketing requested Planning to review any and all possibilities to achieve small volume expansions through the San Juan lateral. Several facility scenarios were investig…

  9. 11 Jan 2002

    Ron Matthews to Darrell Schoolcraft and 14 more

    Station #4 Overhaul Outage

    Planning and System Optimization have agreed that the effected throughput during the Station #4 overhaul outage should be 150 MMcf/d. This should be posted and the firm t…

  10. 7 Jan 2002

    Ron Matthews to Doug Cebryk, Arnold L. Eisenstein, Dennis Alters and 3 more

    Sun Devil Alterative - Revision #10

    Attached is a revised scope which basically includes the majority of the expansion volume to Phoenix. Only 30 MMcf/d goes west of Station #2 while 500 MMcf/d goes to Phoe…

  11. 12 Dec 2001

    Ron Matthews to Michelle Lokay, Darrell Schoolcraft, Kimberly Watson and 4 more

    Burlington Study - El Paso WIndow Rock I/C

    This is a revised spreadsheet from the one yesterday. Changes made were a result of discussions with Darrell. Still need to stick to our guns and NOT give Burlington any …

  12. 13 Nov 2001

    Ron Matthews to James Centilli, Kevin Hyatt, Morgan Gottsponer and 2 more

    Sun Devil Project - Fuel Study

    Attached is an Excel spreadsheet comparing fuel used between Red Rock and propose Sun Devil projects. The Phoenix delivery of 500 MMcf/d is locked and the Cal. border del…

  13. 26 Oct 2001

    Ron Matthews to Steven Harris, Kimberly Watson, Lorraine Lindberg and 12 more

    Mainline Expansion 250 & 300 MMcf/d Scenarios - Revised

    The attached reflect Marketing's request to have interest, overheads, and AFUDC split out for all line items. The revision also includes recent additional input by Engine…

  14. 24 Oct 2001

    Ron Matthews to Lorraine Lindberg, Michelle Lokay, Kimberly Watson and 4 more

    Mainline Expansion Scenarios

    Attached are 250 and 300 MMcf/d cases to expand TW's mainline, Topock, and San Juan lateral. These are + 30% costs but still based on the latest E&C estimate for Sun Devi…

  15. 23 Oct 2001

    Ron Matthews to Madeleine Cardoso @ENRON and 4 more

    RE: REVIEW AND APPROVE RONALD MATTHEWS ITINERARY FOR 05 NOV. TRAVEL

    Arrangements okay with me. The others should respond ASAP directly to you. Thanks! Ron M.

  16. 23 Oct 2001

    Ron Matthews to Dennis Alters, Darrell Schoolcraft

    FW: REVIEW AND APPROVE RONALD MATTHEWS ITINERARY FOR 05 NOV. TRAVEL

    Let Madeleine know ASAP about the arrangements. We have a real cheap rate. Let's not lose it. I've talked to Rich J. and it's okay to start the PNM. meeting later. They w…

  17. 19 Oct 2001

    Ron Matthews to Dennis Alters, Darrell Schoolcraft and 2 more

    Albuquerque Cross Functional Meeting

    I made room reservations for the 3 of us on November 5 only at the Sheraton Uptown (505-881-0000). The rooms are not guaranteed past 6:00 pm. Our confirmation numbers are…

  18. 5 Oct 2001

    Ron Matthews to Michelle Lokay, Dennis Alters, Morgan Gottsponer

    Topock Lateral Expansion - 300 MMcf/d

    Attached is a Level A ( + 30%) cost estimate prepared by Planning based on available information. If you have any questions, please call.

  19. 3 Oct 2001

    Ron Matthews to John R. Keller, Jerry D. Martin, Doug Cebryk and 6 more

    Sun Devil Cost Reconciliation

    Attached is a Powerpoint slide showing the differences between the Planning's Level and Engineering's Level A+. Planning's Level A was update to include the current proje…

  20. 26 Sep 2001

    Ron Matthews to Michelle Lokay, Dennis Alters

    Sun DEvil Expansion Project

    Attached is a spreadsheet showing capacities and costs by segments. The Phoenix lateral length has changed in scope and is a little longer. All of this will be included i…

  21. 26 Sep 2001

    Ron Matthews to Kimberly Watson and 2 more

    Big Sandy Cost Estimate Modified

    Attached is an Excel spreadsheet as before with an additional sheet totaling both the tie in and measurement.

  22. 25 Sep 2001

    Ron Matthews to Kimberly Watson, Dennis Alters, Morgan Gottsponer and 2 more

    Caithness Big Sandy Project

    Kim, The attached file contains a recap of the Timberline program results with a few mods. Basic information covers what Earl and I talked about today. Caithness engineer…

  23. 13 Sep 2001

    Ron Matthews to Kimberly Watson and 2 more

    Caithness - Big Sandy Project

    As discussed earlier, the tap size for the above mentioned project is 16" and both main and loop lines would be tapped. The milepost for the tie in is MP116.5 right close…

  24. 7 Sep 2001

    Ron Matthews to Kevin Hyatt and 4 more

    Ssun Devil Expansion Project - Level A Estimate

    Attached is the scope and Level A cost estimate for the above mentioned project. This is the same package given to Engineering for them to prepare their Level B. Ron M.

  25. 30 Aug 2001

    Ron Matthews to Norm Spalding, Morgan Gottsponer, John R. Keller and 7 more

    RE: Sun Devil Pipeline Lengths

    A preliminary model has been developed based on the limited information Doug, Kevin, and I discussed yesterday. A finished product won't be complete until such time as el…