Bloomfield Inlet Air Cooler Project

From
Ron Matthews ron.matthews@enron.com
To
Bill Rapp
Cc
Ben Asante, Dennis Alters, Kimberly Watson, Kelly Allen, Stephen Veatch, Larry Campbell
Bcc
Ben Asante, Dennis Alters, Kimberly Watson, Kelly Allen, Stephen Veatch, Larry Campbell
Date
Wed, 13 Feb 2002 14:02:30 -0800 (PST)
Bill,
 
The following is a brief desciption of the above mentioned project.
 
The Bloomfield air inlet cooler project consist of the installation of evaporative pads around the existing air filters to reduce the ambient air temperature into units 1 & 2 turbines.  This will allow the turbines to run more efficiently and increase the amount of horsepower developed on hot summer days.  The evaporative system will not be operated on non-summer condition days.  The increase in horsepower will be about 350 Hp per unit which will not exceed the current air quality permit.  The permit limitation is in excess of 5800 Hp and the evaporative system will not increase the horespower no more than 5000 Hp on hot summer days.
 
If you need more information of clarification, please call.