Enron email

Algorithmic Indexing

8 messages for mailbox:saibi-e after:2001-04 before:2001-05

Newest Oldest

Matching messages by month
Skilling resigns
Q3 loss announced
Bankruptcy filing
  1. 30 Apr 2001

    Lance Cunningham to Sevil Yaman, Martin Lin, Sandeep Kohli and 10 more

    Power World drawing and contingency files

    Sevil and others, I have attached a detailed map of the ERCOT system, 69, 138 and 345 KV line and buses (*.pwd). The map is based on the 2001 Summer peak load flow case. …

  2. 30 Apr 2001

    Lance Cunningham to Sevil Yaman, Martin Lin, Sandeep Kohli and 10 more

    Power World drawing and contingency files

    Sevil and others, I have attached a detailed map of the ERCOT system, 69, 138 and 345 KV line and buses (*.pwd). The map is based on the 2001 Summer peak load flow case. …

  3. 27 Apr 2001

    Savita Puthigai to eol.traders@enron.com and 10 more

    VERY IMPORTANT ENRONONLINE STACK MANAGER CHANGES

    We will be releasing new version of the Stack Manager and the EnronOnline website tonight . The following are the changes 1. Changes to Stack Manager: 1.1 Changes to tool…

  4. 20 Apr 2001

    Rika Imai to Ramanarao Tamma, Madhup Kumar, Paul Schiavone and 11 more

    Invitation - IIR Paul Copello (23 Apr 02:00 PM CDT)

    Meeting to discuss the current information that we receive as well as the NEW Generation Database The meeting will take place in 3125B

  5. 11 Apr 2001

    Thane Twiggs to Doug Gilbert-smith, Clint Dean, Smith L Day and 8 more

    ERCOT Ancillary Services Methodology

    There are several items worth noting regarding the ERCOT's methodology: Regulation Reserve Requirements (RGRS). ERCOT has determined that 600 MW of Reg up and down will b…

  6. 10 Apr 2001

    Thane Twiggs to Doug Gilbert-smith, Clint Dean, Smith L Day and 8 more

    ERCOT Ancillary Services Methodology

    The attached file was large so I will provide the link to the ERCOT website. If you cannot down load and would like a hard copy, let me know. http://www.ercot.com/current…

  7. 10 Apr 2001

    Kevin Cline to Eric Saibi, Doug Gilbert-smith

    ERCOT load growth: Q12000 to Q12001

    The actual mwh growth from Q12000 to Q1 2001 was 3.56% (59,426,845 mwh to 61,543,268 mwh). Through my calculations, which I will describe below, I arrived at a weather-no…

  8. 10 Apr 2001

    Lance Cunningham to Doug Gilbert-smith, Clint Dean, Smith L Day and 8 more

    Paris-Anna 345 kV Line ERCOT Constraint Relief Project

    FYI, Line route and discussion at tomorrow's meeting. LBC