30 Apr 2001, 10:59 UTC
Power World drawing and contingency files
- From
- Lance Cunningham lance.cunningham@enron.com
- Date
- Mon, 30 Apr 2001 03:59:00 -0700 (PDT)
Sevil and others, I have attached a detailed map of the ERCOT system, 69, 138 and 345 KV line and buses (*.pwd). The map is based on the 2001 Summer peak load flow case. (Enron paid about $12,000 for this map so we do not need to disclose it to outside personnel.) I also have a detailed map of the eastern interconnect, I believe it is down to the 138 KV level. I have also attached a 2001 contingency file (*.ctg) for ease of importing a standard list of line contingencies that I obtained from the ISO. I have also attached an ERCOT injection group (*.aux) , which is valuable for the years after 2001 because of one constrol group.