6 Mar 2002
Ron Matthews to Kimberly Watson
Blanco Hub Schematic
Kim, Attached is the latest. At a glance I didn't see anything missing. Ron M.
-
13 Feb 2002
Ron Matthews to Bill Rapp and 12 more
Bloomfield Inlet Air Cooler Project
Bill, The following is a brief desciption of the above mentioned project. The Bloomfield air inlet cooler project consist of the installation of evaporative pads around t…
-
29 Jan 2002
Ron Matthews to Kimberly Watson, Mansoor Abdmoulaie
Questar I/C Bloomfield
Kim, Talked to Earl Chanley and he stated that we(TW) would have to get a lease agreement with Questar to install TW facilities on their land. Earl said R-O-W team would …
-
25 Jan 2002
Ron Matthews to Morgan Gottsponer, Ben Asante, Dennis Alters and 8 more
FW: Bloomfield horsepower
This shows that with a 350 Hp increase per unit, we would still not exceed operational Hp even in the winter. We max out about 4500 Hp in the summer on a good day and thi…
-
24 Jan 2002
Ron Matthews to Earl Chanley and 8 more
Bloomfield Units 1 & 2 Inlet Air Coolers
This letter is Planing's request for Engineering to look at the cost and timing to install in let air cooling on units 1 & 2. The summer ambient temperature is 95 F and t…
-
16 Jan 2002
Ron Matthews to Steven Harris, Kimberly Watson, Lorraine Lindberg and 7 more
San Juan Expansion Options - Small Volume
Marketing requested Planning to review any and all possibilities to achieve small volume expansions through the San Juan lateral. Several facility scenarios were investig…
-
11 Jan 2002
Ron Matthews to Darrell Schoolcraft and 14 more
Station #4 Overhaul Outage
Planning and System Optimization have agreed that the effected throughput during the Station #4 overhaul outage should be 150 MMcf/d. This should be posted and the firm t…
-
11 Jan 2002
Ron Matthews to Kimberly Watson
RE: Attachment A - Payment Schedule
For what it's worth, it looks okay to me. Ron Matthews
-
12 Dec 2001
Ron Matthews to Michelle Lokay, Darrell Schoolcraft, Kimberly Watson and 4 more
Burlington Study - El Paso WIndow Rock I/C
This is a revised spreadsheet from the one yesterday. Changes made were a result of discussions with Darrell. Still need to stick to our guns and NOT give Burlington any …
-
11 Dec 2001
Ron Matthews to Kimberly Watson, Michelle Lokay, Darrell Schoolcraft
El Paso/Burlington Window Rock Study Results
Attached is an Excel spreadsheet showing facilities and costs for 24" from Window Rock to Station #4 suction. Ron Matthews
-
26 Nov 2001
Ron Matthews to Kimberly Watson, Mansoor Abdmoulaie
Questar - Blanco Hub Schematic
Attached is a schematic showing the proposed location of the Questar Southern Trails interconnect. Ron Matthews
-
15 Nov 2001
Ron Matthews to Kimberly Watson, Mansoor Abdmoulaie and 2 more
Questar Southern Trails Interconnect - San Juan Co., NM
The legal description for the proposed Southern Trails interconnect north of the Blanco Hub is Sec. 13, T29N, R11W, San Juan County, NM. This is on the old NWPL receipt l…
-
26 Oct 2001
Ron Matthews to Steven Harris, Kimberly Watson, Lorraine Lindberg and 12 more
Mainline Expansion 250 & 300 MMcf/d Scenarios - Revised
The attached reflect Marketing's request to have interest, overheads, and AFUDC split out for all line items. The revision also includes recent additional input by Engine…
-
25 Oct 2001
Ron Matthews to Kimberly Watson
RE: Big Sandy Delivery Point Construction and Operating Agreement - Revised
Kim, I have a 9:00 a.m. meeting (1 hour) and 11:30 a.m. to 1:00 pm. After that I'm out until Monday. Ron M.
-
24 Oct 2001
Ron Matthews to Lorraine Lindberg, Michelle Lokay, Kimberly Watson and 4 more
Mainline Expansion Scenarios
Attached are 250 and 300 MMcf/d cases to expand TW's mainline, Topock, and San Juan lateral. These are + 30% costs but still based on the latest E&C estimate for Sun Devi…
-
19 Oct 2001
Ron Matthews to Dennis Alters, Darrell Schoolcraft and 2 more
Albuquerque Cross Functional Meeting
I made room reservations for the 3 of us on November 5 only at the Sheraton Uptown (505-881-0000). The rooms are not guaranteed past 6:00 pm. Our confirmation numbers are…
-
26 Sep 2001
Ron Matthews to Kimberly Watson and 2 more
Big Sandy Cost Estimate Modified
Attached is an Excel spreadsheet as before with an additional sheet totaling both the tie in and measurement.
-
25 Sep 2001
Ron Matthews to Kimberly Watson, Dennis Alters, Morgan Gottsponer and 2 more
Caithness Big Sandy Project
Kim, The attached file contains a recap of the Timberline program results with a few mods. Basic information covers what Earl and I talked about today. Caithness engineer…
-
20 Sep 2001
Ron Matthews to Kimberly Watson, Lee Huber
Big Sandy Delivery Point Const and Oper Agreement
Attached shows a revision on page 2, paragraph 1.7. There are really two (2) 12" taps proposed; one tap on each the main and loop lines. They both swedge up immediately t…
-
13 Sep 2001
Ron Matthews to Kimberly Watson and 2 more
Caithness - Big Sandy Project
As discussed earlier, the tap size for the above mentioned project is 16" and both main and loop lines would be tapped. The milepost for the tie in is MP116.5 right close…
-
30 Aug 2001
Ron Matthews to Norm Spalding, Morgan Gottsponer, John R. Keller and 7 more
RE: Sun Devil Pipeline Lengths
A preliminary model has been developed based on the limited information Doug, Kevin, and I discussed yesterday. A finished product won't be complete until such time as el…
-
13 Aug 2001
Ron Matthews to ketchek@bp.com and 6 more
Caithness - Big Sandy Project
Attached are the engineering standards you requested on our latest telephone discussion with Kim Watson. Also attached is a cost estimate summary that the numbers were ma…