20 Sep 2001, 14:16 UTC
Big Sandy Delivery Point Const and Oper Agreement
- From
- Ron Matthews ron.matthews@enron.com
- Date
- Thu, 20 Sep 2001 07:16:52 -0700 (PDT)
Attached shows a revision on page 2, paragraph 1.7. There are really two (2) 12" taps proposed; one tap on each the main and loop lines. They both swedge up immediately to 16" and from there into the proposed Big Sandy's lateral pipeline. Nothing else stood out. Ron M.