to:eric.faucheaux@enron.com means Eric Faucheaux (eric.faucheaux@enron.com).
-
5 Apr 2001
Mansoor Abdmoulaie to Lorraine Lindberg and 30 more
TW-West Texas Expansion Level "A" release cost estimate 4/5/2001
This is in response to your request of 3-26-2001 regarding the expansion of TW pipeline system in West Texas. Current Facility Capacity Summary Compression capacity at WT…
-
3 Apr 2001
Mansoor Abdmoulaie to Kevin Hyatt and 8 more
New Compressor Station in Eddy County, NM.
As I mentioned the other day, one of the possible ways to receive high volume of gas from our customers is to design and construct new compression facilities adjacent to …
-
30 Mar 2001
Jeffery Fawcett to Kirk Ketcherside and 16 more
Big Sandy Project
Kirk, Great to hear that the project is moving forward. I think TW feels it's emotionally vested at this point! I will ask the Facility Planning folks to get started on p…
-
27 Mar 2001
Mansoor Abdmoulaie to Lorraine Lindberg and 6 more
TW/ BP in Eddy County, NM.
This is a level "A" cost estimate (?30%) to tie BP's gas to TW high-pressure line in Eddy County NM. A) 30 mmcf/d case (BP pressure=1000 psig): 13 miles of 10" (OD) pipel…
-
26 Mar 2001
Eugene O'Gorman to Arnold L Eisenstein and 12 more
RE: Nitrogen facility
I quickly reviewed the Engelhard technology. It may have some nice applications. Here are the issues with this nitrogen rejection technology. Adaptation of PSA technology…
-
23 Mar 2001
Kevin Hyatt to Lindy Donoho, Jeffery Fawcett, Lorraine Lindberg and 9 more
FW: Cost Estimate
TEAM- Below is a project request spreadsheet developed by Facility Planning. We will use this form in an attempt to better communicate and track ALL the various cost esti…
-
23 Mar 2001
Donna Martens to Mary Kay Miller, Phil Lowry, Keith Petersen and 27 more
Final Red Rock
Attached is the final document with attachments for the Red Rock filing. Please let me know by 3 P.M. on Friday (3/23) if you have any comments or concerns. Also, please …
-
15 Mar 2001
Arnold Eisenstein to Jerry D. Martin and 30 more
Red Rock Weekly Report
1. ACTIVITIES: A. Discussions with TW on critical items in order to finalize FERC application: Navajo Environmental has requested a Threatened & Endangered Species (T&E) …
-
15 Mar 2001
Kevin Hyatt to Lorraine Lindberg, Eric Faucheaux and 6 more
RE: Cost Estimate
I thought we agreed all project requests would be submitted in writing to Facility Planning on the Project Sheet we developed. The Sheet is important in that it highlight…
-
13 Mar 2001
Perry Frazier to Michelle Lokay and 6 more
P-2 Coolers and recycle line.
I understand this Level A is approved for work order generation. This is the cost from FP for a recyle line and coolers at P-2 to handle NNG Gray flows to Station # 9. Th…
-
13 Mar 2001
Michelle Lokay to Earl Chanley and 12 more
RE: Pogo Interconnect
After many conversations with John Havard at Pogo, it was decided that we will not continue with the Transwestern interconnect in the Pronghorn area. The drilling results…
-
12 Mar 2001
Donna Martens to Arnold L Eisenstein, Earl Chanley, Larry Campbell and 32 more
Red Rock issues
The following issues need to be addressed for the filing: In regard to the trees within the station yard at Station 2 --- are we correct in saying we will be on "previous…
-
12 Mar 2001
Rich Jolly to Mike McCracken and 8 more
Re: Red Cedar La Plata
Thanks Mike let me know what we can do to assist you in this. RJ Mike McCracken 03/09/2001 04:20 PM To: Kevin Hyatt/ET&S/Enron, Lorraine Lindberg/ET&S/Enron, Eric Fauchea…
-
10 Mar 2001
Arnold Eisenstein to Jerry D. Martin and 30 more
Red Rock Weekly Report
1. ACTIVITIES: a. Completed site visit to all stations and evaluation of existing facilities b. Discussions with TW on critical items in order to finalize FERC applicatio…
-
8 Mar 2001
Lorraine Lindberg to Perry Frazier and 18 more
RE: EPFS interconnect
I need as close to the exact cost for both 65,000 and 90,000 MMBtu/d as we can get. EPFS is going to pay for this and I don't want ETS to fund anything so it's important …
-
8 Mar 2001
Perry Frazier to Lorraine Lindberg and 18 more
RE: EPFS interconnect
Let me know if you need a level A or level B, in my book a level B is a "good to go" estimate. The prior scope of 60 MMBtu/d was the max. the tap could handle, any thing …
-
7 Mar 2001
Jeffery Fawcett to Ben Asante, Eric Faucheaux and 6 more
Topock Lateral
Gentlemen, In addition to looking for ways in which Transwestern can improve mainline deliverability, another important criteria is access to markets. With the addition o…
-
7 Mar 2001
Lorraine Lindberg to Perry Frazier, Arnie Bailey and 16 more
RE: EPFS interconnect
I just got off the phone with El Paso Field Services. At this time, I now need 2 cost estimates. One to increase the facilities to be able to handle up to 65,000 MMBtu/d …
-
6 Mar 2001
Mike McCracken to Kevin Hyatt, Michelle Lokay, Jeffery Fawcett and 34 more
Marketing Roundtable Notes
All Thank you very much for the great attendance and participation! Thanks, also, to all those who had to juggle this meeting with others. Attached are the notes from the…
-
5 Mar 2001
Lorraine Lindberg to Eric Faucheaux and 2 more
EPFS interconnect
Eric - Please provide me with a cost estimate to increase the meter facilities from 40,000 MMBtu/d to 60,000 MMBtu/d at the new receipt point with El Paso Field Services …
-
3 Mar 2001
Donna Martens to Rich Jolly, Arnold L Eisenstein, David Roensch and 22 more
Red Rock Expansion
Please review attached redline draft and provide comments and the signed FERC approval form by 2 P.M. on Tuesday, March 6. Questions, let me know. Thanks. Donna
-
2 Mar 2001
Ben Asante to Gary Choquette and 30 more
Re: Needles Pressure Requirement
Great Gary, Can you please do something quick to tell us what the Needles pressure need to be? Thx
-
2 Mar 2001
Gary Choquette to Kenneth Chow, bob.mcchane@enron.com, Kim Kouri and 12 more
Needles Pressure Requirement
I've got a copy of the SoCal contract for Needles. The exact wording for the pressure requirement is: SECTION 5. PRESSURE. Seller shall tender gas to Buyer, at the delive…
-
24 Feb 2001
Donna Martens to Rich Jolly, Arnold L Eisenstein, David Roensch and 24 more
Red Rock Expansion Filing
Attached is a draft copy of Transwestern's application requesting authorization to abandon the existing units at Stations 1, 2, 3 and 4 and install a 38,000 HP unit at ea…
-
23 Feb 2001
Rich Jolly to Mike McCracken and 12 more
Re: Agave & Atoka System
Mike thanks for the information and you're correct in stating that marketing would have to look this over. I'm sure they will want a full scope of work. With your and Ear…