10 Apr 2001, 17:02 UTC

WP-02 Data Response

From
Sarah Westenberg sawestenberg@bpa.gov
To
abuckley@wutc.wa.gov, alan@epud.org, ali.rodol@ci.seattle.wa.us, archive-power-ratecase@bpa.gov, aw_turner@pgn.com, bassl@sce.com, bessex@cowlitzpud.org, Bill Ferranti, bpadiscovery@merkellaw.com, ccopatrny@e-z.net, crow@millernash.com, cub@teleport.com
and 93 more cwagers@dcpud.org, dan.meek@usa.net, Norville, darkills@popud.com, dbkinnard@pplmt.com, dfaulk@puget.com, discoveryparalegal@bpa.gov, dldorrell@stoel.com, dmacgregor@morganlewis.com, doney@doneylaw.com, doug_brawley@pngc.com, dparrish@prmllp.com, dws@keywaycorp.com, eauverde@hotmail.com, eboyd@ppcpdx.org, efinklea@energyadvocates.com, elisackf@aol.com, energlaw@aol.com, eric.larson@oremetwahchang.com, erick_johnson@pngc.com, ghuhta@cowlitzpud.org, huse@eesconsulting.com, ias@dvclaw.com, jack.speer@alcoa.com, jacksonc@ida.net, janet.prewitt@state.or.us, Jim Deason, NELSON Jeff, jhartso@enron.com, jlh@mc-power.com, johk@critfc.org, john.yanov@eweb.eugene.or.us, John Cameron, jolynnr@mresearch.com, Williams, John P. (JPW), jrb_ora@televar.com, jsaven@pacifier.com, jschlect@avistacorp.com, Kevin Clark, kknitte@gcpud.org, kmoxness@cencoast.com, kpom@mail.pacifier.com, kyle@ppcpdx.org, lawyer@teleport.com, lhamilton@avistaenergy.com, Lon L. Peters, Lincoln Wolverton, lyn_williams@pgn.com, HELLMAN Marc, Steve Marshall, matts1@atg.wa.gov, mershanlaw@aol.com, mhain@ect.enron.com, michaelearly@earthlink.net, mike.macdougall@powerex.com, mmetzler@ci.tacoma.wa.us, mschaff@worldnet.att.net, mthomas@mtpower.com, paul@kinergyllc.com, pete.forsyth@kaiseral.com, pete@ashland.or.us, Peter Richardson, pfox@bracepatt.com, Pamela Jacklin, pmurphy@mbllp.com, pnichols@idahopower.com, pobenchain@idahopower.com, pspi@dynegy.com, pvickery@tpud.org, rachel@rnp.org, ratecase@pngc.com, rates@ppcpdx.org, rbstrong@painehamblen.com, rdb@keywaycorp.com, rfoiani@gcpud.org, rkindley@schwabe.com, rle@givenspursley.com, rpierce@avistaenergy.com, scott.brattebo@pacificorp.com, seligman@teleport.com, simonf@atg.wa.gov, sjohnsto@wutc.wa.gov, skaravit@ci.tacoma.wa.us, stephens@eslerstephens.com, steve@nwenergy.org, Thomas DeBoer, Terry Mundorf, tgrim@chbh.com, townsend@chbh.com, tracigrundon@dwt.com, tstevenson@ci.burbank.ca.us, weavertr@yakima-wa.com, wmgt3@montana.com
Date
Tue, 10 Apr 2001 10:02:00 -0700 (PDT)
request_number:  PG-BPA: 134
firstname:  Sarah
lastname:  Westenberg
e-mail:  sawestenberg@bpa.gov
exhibit_wp-02-e-:  BPA-77
page_numbers:  Attachment A, pages 14-15
request_text:  Please state and explain the rationale for the proposal to use 
revenues to effectively allocate net augmentation costs between Slice and 
non-Slice rates, rather than (a) the approach used to reflect other BPA costs 
in the calculation of the Slice Rate, which was determined in BPA's Record of 
Decision published in May 2000, or (b) the approach to this issue proposed by 
BPA in the December 2000 Amended Proposal."



response_text:  First, regarding the specific requests contained in this data 
request, neither the ROD in May 2000 nor the December 2000 Amended Proposal 
contained a methodology to adjust both Slice and non-Slice power rates 
multiple times each year during the rate period for changes in BPA,s 
augmentation costs. In fact, the issue now is not a Slice vs. non-Slice 
issue.  Rather, it is an issue of which power products subject to LB CRAC 
recover what amount of the additional net augmentation costs.

The approaches to recovering net augmentation costs in May ROD and December 
2000 Amended Proposal are different than that proposed in the Supplemental 
Proposal.  It simply is not possible to explain some distinction that is 
alleged to be introduced in this Supplemental Proposal when neither the May 
2000 or December 2000 proposals contained no method for calculating and then 
apportioning these costs in one way between individual power products.  No 
such segmentation was required in either of those two prior proposals.

In the May ROD, there was only one CRAC, which allocated the amount of 
revenues to be raised by non-Slicer power products  based on revenues 
(WP-02-FS-BPA-02A, p. 283).  However, that one CRAC did not attempt to 
collect BPA,s net augmentation costs as the currently proposed LB CRAC 
attempted to do.

In the December Amended Proposal, BPA proposed two very different methods for 
collecting net augmentation costs from customers.  Slice share of 
augmentation costs was determined based on share of the FBS.  Non-Slice power 
products, share of net augmentation costs was determined using loads.  
Together, these two approaches collected more than 100% of BPA,s net 
augmentation costs.
So, the Supplemental Proposal contains a new methodology to recover net 
augmentation costs using twice-annual rate adjustments to all power products 
subject to LB CRAC.  This new approach required a new methodology, and, as a 
result, this new methodology cannot be directly compared to methodologies in 
the earlier proposals.

Second, turning to the broader question of the justification for using 
revenues, there are several reasons why BPA considers this to be the correct 
approach.

The first policy objective driving the Amended Proposal and Supplemental 
Proposal is that &It should be as simple as possible.8 (WP-02-E-BPA-70, pg. 
6, line 4).  One principle underlying settlement discussions was that the LB 
CRAC method ought to assure that each power product subject to the LB CRAC is 
charged with recovering the same percentage increase in revenue.

The approach to determining the equal percentage increases in revenue 
required from each power product subject to LB CRAC is to use revenues in the 
determination of the LB CRAC%.  In this calculation, net augmentation cost 
are spread across the sum of all expected revenues from all power products 
subject to LB CRAC for the entire 6-month duration of the LB CRAC.  The 
resulting percentage, referred to as LB CRAC%, is then applied equally to 
each power product subject to the LB CRAC.  This approach assures that each 
separate power product, subject to the LB CRAC, will then have a revised rate 
that is determined using the same percentage increase in required revenue.

Additionally, the problem BPA is grappling with is one of sufficient 
revenues.  Net augmentation costs are expressed in dollars.  Revenues from 
power products without the LB CRAC is expressed in dollars. By spreading the 
former dollars over the latter dollars, and applying the resulting percentage 
to revenues without the LB CRAC, results in incremental dollars required from 
each separate power product that is subject to the LB CRAC.   This appears to 
BPA to be a very fair and equitable approach to recover net augmentation 
costs.


The following information is from the web server:
1.  Logon: IUSR_GRANITE
2.  Remote Host:  53.180.74.220
3.  Remote IP Address:  53.180.74.220
4.  Form URL:  
http://www.bpa.gov/power/secure/psp/ratecase/discovery/wp_02_response.html
5.  Browser Client:  Mozilla/4.0 (compatible; MSIE 5.01; Windows NT; BPA 4.01 
SP2; BPA 5.01 SP1)