Enron email

Algorithmic Indexing

45 messages for with:kent.shoemaker@ae.ge.com after:2000-12 before:2001-01

Newest Oldest

Matching messages by month
Skilling resigns
Q3 loss announced
Bankruptcy filing

with:kent.shoemaker@ae.ge.com means Shoemaker, Kent (GEAE) (kent.shoemaker@ae.ge.com).

  1. 22 Dec 2000

    Peter J. Thompson to Kay Mann, Suzanne Adams and 10 more

    CA Development Agreements

    Attached please find the latest version of the CA Development I and II Agreements, as well as blaclines (Document Nos. 83699 and 83700) showing the changes to Sections 6.…

  2. 22 Dec 2000

    George Kutzschbach to Shoemaker, Kent (GEAE), Peter J. Thompson, Kay Mann and 3 more

    CA Devel I & II Facilityl Agreements

    Although InterGen has not completed its review of the Facility Agreements, at Kay Mann's suggestion and to expedite matters, I am passing on changes which InterGen requir…

  3. 21 Dec 2000

    Peter J. Thompson to Kay Mann and 8 more

    CA Development Company I and II Agreements

    Attached please find the final versions of the above-referenced documents. You will note that Exhibit H-2 is not included in the electronic copies. It is included, howeve…

  4. 21 Dec 2000

    Peter J. Thompson to Kay Mann and 24 more

    Enron South America Facility Agreement and Exhibits

    Attached please find the final version of the above-referenced document. You will note that Exhibit H-2 is not included in the electronic copy. It is included, however, i…

  5. 21 Dec 2000

    Peter J. Thompson to Kay Mann and 8 more

    CA Development II

    Attached please find the most recent version of the CA Development II Agreement and Exhibits as well as a blackline against the version circulated on December 4. I will b…

  6. 21 Dec 2000

    Peter J. Thompson to Kay Mann and 8 more

    CA Development I

    Attached please find the most recent version of the CA Development I Agreement and Exhibits as well as a blackline against the version circulated on December 4. I will be…

  7. 21 Dec 2000

    lee.johnson@ss.ps.ge.com to Peter J. Thompson, Kay Mann and 24 more

    RE: Enron South America FacilityAgreement and Exhibits

    Here's the H-2 Training insert in pdf format. I don't have a word file. Kay, please copy for insert into the execution copy of the Exhibits. Thanks, Lee

  8. 21 Dec 2000

    Peter J. Thompson to Kay Mann and 24 more

    Enron South America FacilityAgreement and Exhibits

    Attached please find the latest version of the Enron South America Facility Agreement and Exhibits, as well as a blackline showing changes from the last version circulate…

  9. 21 Dec 2000

    stephen.swift@ps.ge.com to Suzanne Adams, Sheila Tweed, Ben Jacoby and 8 more

    RE: REVISED GE CONFERENCE CALL

    Attached is our latest draft of where we left off on LOL and indemnity. The yellow areas are where I think the final agreements need to be reached. Talk to you this after…

  10. 21 Dec 2000

    Peter J. Thompson to lee.johnson@ss.ps.ge.com, Shoemaker, Kent (GEAE) and 2 more

    Comparison of Section 10.8.4.

    <<Comparison of Section 10.8.4.DOC>> Attached please find my proposed change to Section 10.8.4 of the CA Development Agreements to act as a placeholder for the liquid fue…

  11. 18 Dec 2000

    Kay Mann to lee.johnson@ss.ps.ge.com and 14 more

    RE: E-Next Generation CISO1

    Lee, If this will be a dual fuel unit, it seems we should at least have a place holder guarantee, even if the details aren't included. Any problem with that approach? Kay…

  12. 18 Dec 2000

    lee.johnson@ss.ps.ge.com to Peter J. Thompson, Kay Mann and 16 more

    RE: City of Austin Agreement and Exhibits

    I've redlined the address info in the attached for notices to GE. There is no need for Exhibit R, since tests are done and Equipment has shipped.

  13. 15 Dec 2000

    Peter J. Thompson to Kay Mann and 8 more

    E-Next Generation CISO1

    Attached please find a clean copy of the latest draft of the E-Next Generation CISO1 Agreement and Exhibits, as well as blacklines showing changes made to each from the p…

  14. 15 Dec 2000

    Peter J. Thompson to lee.johnson@ss.ps.ge.com, Shoemaker, Kent (GEAE) and 2 more

    FW: E-Next Generation CISO2

    Lee and Kent, I apologize for forgetting to cc you on the draft that just went out.

  15. 14 Dec 2000

    Peter J. Thompson to Kay Mann and 16 more

    City of Austin Agreement and Exhibits

    Attached please find clean copies of the most recent versions of the City of Austin Agreement and Exhibits, as well as blacklines showing changes from the last version ci…

  16. 14 Dec 2000

    Peter J. Thompson to Kay Mann and 24 more

    Exhibits to Enron South America Gas Turbine Purchase Agreement

    <<Exhibits to Gas Turbine Purchase Agreement - without notations.DOC>> <<Comparison of Exhibits to Gas Purchase Agreement.doc>> Attached please find a clean copy of the e…

  17. 14 Dec 2000

    Peter J. Thompson to Kay Mann and 24 more

    Enron South America Agreement

    Attached please find a clean copy of the latest version of the Enron South America Agreement, as well as a blackline showing changes from the version circulated on 12/11.…

  18. 14 Dec 2000

    Kay Mann to Kay Mann and 6 more

    Re: Winston & Strawn Comment: Consents to Assignment

    I've redlined the document against the previous version, but I don't think I picked up all the changes. In addition to the marked changes, there are these changes: D. thi…

  19. 11 Dec 2000

    lee.johnson@ss.ps.ge.com to Kay Mann, lee.johnson@ss.ps.ge.com and 22 more

    RE: Exhibits to Enron South America Gas Turbine Purchase Agreemen t

    Kay, I had a copy of the last redline for Exhibit B-1. Don't have execution copy. On Exhibit h-2, Training -- I'll look for it, but think Kathy had it last to identify it…

  20. 11 Dec 2000

    Kay Mann to lee.johnson@ss.ps.ge.com and 24 more

    RE: Exhibits to Enron South America Gas Turbine Purchase Agreemen t

    Lee (and others), Exhibit B is the EECC spec, right? I do not know if I have an electronic version. If locating it is a problem, we can copy what we have unless there is …

  21. 9 Dec 2000

    lee.johnson@ss.ps.ge.com to Peter J. Thompson, Kay Mann, john.r.ayres@enron.com and 18 more

    RE: Exhibits to Enron South America Gas Turbine Purchase Agreemen t

    Kay, I edited the Termination Schedule replacing the term Purchase Amount per unit to Unit Liability Amount for consistency with the new structure. Lee

  22. 9 Dec 2000

    lee.johnson@ss.ps.ge.com to Peter J. Thompson, Kay Mann, john.r.ayres@enron.com and 18 more

    RE: Enron South America Break-Out Agreement

    Peter/Kay, Attached is revised ESA Facility Agreement. This includes the Optional Electric Output Guarantee for the Brazil site conditions. Since the spread between the 8…

  23. 8 Dec 2000

    Kay Mann to Shoemaker, Kent (GEAE), Peter J. Thompson, ccobb@akllp.com and 1 more

    Break out contract form

    There may be a possible bust in 17.4.. Specifically please look at how the math works on the refund due to termination. I think that the baseline should be the maximum li…

  24. 8 Dec 2000
  25. 8 Dec 2000

    Peter J. Thompson to Kay Mann and 18 more

    Exhibits to Enron South America Gas Turbine Purchase Agreement

    <<Exhibits to Gas Turbine Purchase Agreement - without notations.DOC>> This is the most recent draft of the exhibits. The following items need to be added to complete the…