Skilling resigns
Q3 loss announced
Bankruptcy filing

with:doug.cebryk@enron.com means Doug Cebryk (doug.cebryk@enron.com).

  1. 28 Sep 2001

    Kevin Hyatt to Dennis Alters, Larry Campbell, Doug Cebryk and 9 more

    No Sun Devil update meeting Monday 10/1

    We expect the cost estimate to be completed 10/2 and will likely begin the weekly meeting Monday 10/8.

  2. 28 Sep 2001

    Larry Campbell to alstad@enron.com, Jon Alstad and 14 more

    RE: Review Draft - Sundevil Fatal Flaw Analysis/Briefing Report

    Jon, I was referring to the actual monument site, not all lands dedicated to the monument by BLM, which occur for several miles on both sides of I-17. I was under the imp…

  3. 27 Sep 2001

    Jon Alstad to John Shafer, Doug Cebryk and 8 more

    Sun Devil Projet - Final Cash Flow Estimate; Alternative Analysis; and Agua Fria National Monument

    I have attached our revised Cash Flow Estimate for the Sun Devil Pipeline Project. I have increased the overall estimate from $5.0 to $7.5 million based on increases to t…

  4. 26 Sep 2001
  5. 26 Sep 2001

    Larry Campbell to patti@enron.com, Scott Patti and 16 more

    RE: Review Draft - Sundevil Fatal Flaw Analysis/Briefing Report

    Scott, I shold probably clearify something. The existing right of way, which we intend on staying in, at least around Cordes Junction is located west of I-17, which will …

  6. 26 Sep 2001

    Larry Campbell to Scott Patti and 16 more

    RE: Review Draft - Sundevil Fatal Flaw Analysis/Briefing Report

    Scott, I shold probably clearify something. The existing right of way, which we intend on staying in, at least around Cordes Junction is located west of I-17, which will …

  7. 26 Sep 2001

    Larry Campbell to Scott Patti and 16 more

    Re: Additional Note

    Thanks Scott, I heard about the same thing, and was checking futrher to see if this was actually the case.... "Patti, Scott" <SPatti@ensr.com> on 09/25/2001 08:35:35 PM T…

  8. 26 Sep 2001

    Scott Patti to John Shafer, Doug Cebryk, Larry Campbell and 12 more

    Additional Note

    By the way, I got a call back from Greg Simmons in the BLM State Office in Arizona - my question to him was whether or not a proposed ROW across the Agua Fria National Mo…

  9. 26 Sep 2001

    Scott Patti to John Shafer, Doug Cebryk, Dave Hubbard and 10 more

    ENSR Cashflow Estimate Through Construction of Project Sundevil

    Lady and Gentlemen, As the Subject line would lead you to believe, I am attaching a further refinement of our cost estimate, spread out over the life of the project. I kn…

  10. 25 Sep 2001

    Scott Patti to John Shafer and 14 more

    RE: Review Draft - Sundevil Fatal Flaw Analysis/Briefing Report

    Gentlemen, Attached is our work to date (minus the telephone call summary sheets and permit requirement summary sheets [Appendix A] you've already received) on the Fatal …

  11. 25 Sep 2001

    Scott Patti to John Shafer and 14 more

    RE: Review Draft - Sundevil Fatal Flaw Analysis/Briefing Report

    Gentlemen, Attached is our work to date (minus the telephone call summary sheets and permit requirement summary sheets [Appendix A] you've already received) on the Fatal …

  12. 25 Sep 2001

    Doug Cebryk to Kevin Hyatt and 2 more

    Sun Devil Estimate

    Kevin Please advise how critical it is that the Cost Estimate be split by project components, specifically: 1. San Juan Lateral - 97 mi. 2. TW Mainline Loop- 225 mi 3. Ph…

  13. 25 Sep 2001

    Scott Patti to John Shafer, Larry Campbell and 12 more

    Fatal Flaw Analysis Status Report

    John and Larry, I have sent a copy of the Fatal Flaw Analysis to Jon Schmidt for review and input. It truly is a "living" document, and can be as complete as you would li…

  14. 24 Sep 2001

    Scott Patti to Doug Cebryk and 12 more

    Cursory Review of Faults and Seismicity Potential - Sundevil

    Doug, I got a call from Don Mohler this morning wanting to know if we had done a cursory check of faults and seismicity in the vicinity of the SunDevil route. He said to …

  15. 24 Sep 2001

    Scott Patti to scott.patti@enron.com, jon.schmidt@enron.com, John Shafer and 6 more

    Navajo ROW costs

    I got a call back from Ed Peck over the weekend. He said that he didn't know where the BLM guy got his numbers, but that $1MM/mile for ROW would be extremely steep. He sa…

  16. 24 Sep 2001
  17. 21 Sep 2001

    Scott Patti to John Shafer, Kevin Hyatt, Eric Gadd and 8 more

    Land Use Categories and Constraints along the proposed Sun Devil Route

    Attached is the land use category and constraint table that Jon Alstad has put together for the currently proposed route. He and I both have been working on the briefing …

  18. 21 Sep 2001

    Doug Cebryk to Eric Gadd, Kevin Hyatt, Jerry D. Martin and 2 more

    Costs/Activities to FERC Filing- Sun Devil

    Gentlemen We have completed the analysis of activities and costs to progress the Sun Devil Project to a FERC Filing by March 30/01 This file details the FERC ACTIVITIES T…

  19. 21 Sep 2001

    Doug Cebryk to scott'.'patti@enron.com, John Shafer, Kevin Hyatt and 11 more

    RE: Agencies and NGOs already contacted for Sun Devil

    To All I have done a cursory review of the requirements of the agencies contacted, and 2 significant itmes leap out. #1 New Mexico BLM Permitting - Cultural Resources Dav…

  20. 21 Sep 2001

    Scott Patti to John Shafer, Kevin Hyatt, Eric Gadd and 8 more

    RE: Additional Agency Correspondence

    Attached are some additional pieces of the puzzle; a supplement to the large set of correspondence/permitting requirements sent earlier. Scott J. Patti Senior Project Man…

  21. 21 Sep 2001

    Scott Patti to John Shafer, Kevin Hyatt, Eric Gadd and 8 more

    Agencies and NGOs already contacted for Sun Devil

    US EPA, Regions VI and IX US Forest Service - Coconino, Kaibab, and Prescott Forests BLM - NM State Office, Farmington Field Office, AZ State Office, Phoenix Field Office…

  22. 20 Sep 2001

    Scott Patti to John Shafer, armando.diaz@enron.com, Doug Cebryk and 6 more

    RE: REVISED Preliminary Cost Estimate for Environmental through Construction Phase - Sun Devil

    Gentlemen, this is the cost estimate I was trying to send you previously. Scott Scott J. Patti Senior Project Manager ENSR International 1601 Prospect Parkway Fort Collin…

  23. 20 Sep 2001

    Ron Matthews to Doug Cebryk, Kevin Hyatt

    RE: Panda Energy Extension

    Doug, You're right!! Pipe size can swing the costs substantially. May be able to go down to a 20" or 24" depending on flow. Once I have a volume, I can size the line in a…

  24. 20 Sep 2001

    John Shafer to Kevin Hyatt, Eric Gadd and 2 more

    RE: Confidentiality of Sun Devil???

    Scott, Please furnish a list of who you will be talking with. (Caveat: Scott, you certainly realize that you must provide the FERC with summary notes of meetings with gro…