Doug,

You're right!!  Pipe size can swing the costs substantially. May be able to go down to a 20" or 24" depending on flow.  Once I have a volume,  I can size the line in a matter of minutes.  100 vs 450 MMcf/d makes a BIG difference.  I'll leave the guess work of flow up to Kevin.

Ron M.
Quoted or forwarded from earlier messages
-----Original Message-----
From: 	Cebryk, Doug  
Sent:	Thursday, September 20, 2001 2:12 PM
To:	Hyatt, Kevin
Cc:	Matthews, Ron
Subject:	Panda Energy Extension

Kevin
Do you want a cost estimate for the Panda Energy extension for the Cavern to the tie-in point.
It is 35.4 miles long , and we need to rethink/confirm the 36" size based on volume, as every inch in diameter adds substantial cost.