28 Jan 2002
Ron Matthews to Ben Asante, Dennis Alters, Darrell Schoolcraft and 5 more
San Juan Lateral 10 MM/d Expansion
I'm getting old! Wondered why I couldn't find this is my sent folder. Still in my draft folder. Please review ASAP. This will be sent to Steve Harris, Kim Watson, and Lor…
-
25 Jan 2002
Ron Matthews to Morgan Gottsponer, Ben Asante, Dennis Alters and 8 more
FW: Bloomfield horsepower
This shows that with a 350 Hp increase per unit, we would still not exceed operational Hp even in the winter. We max out about 4500 Hp in the summer on a good day and thi…
-
24 Jan 2002
Ron Matthews to Earl Chanley and 8 more
Bloomfield Units 1 & 2 Inlet Air Coolers
This letter is Planing's request for Engineering to look at the cost and timing to install in let air cooling on units 1 & 2. The summer ambient temperature is 95 F and t…
-
11 Jan 2002
Ron Matthews to Darrell Schoolcraft and 14 more
Station #4 Overhaul Outage
Planning and System Optimization have agreed that the effected throughput during the Station #4 overhaul outage should be 150 MMcf/d. This should be posted and the firm t…
-
7 Jan 2002
Ron Matthews to Doug Cebryk, Arnold L. Eisenstein, Dennis Alters and 3 more
Sun Devil Alterative - Revision #10
Attached is a revised scope which basically includes the majority of the expansion volume to Phoenix. Only 30 MMcf/d goes west of Station #2 while 500 MMcf/d goes to Phoe…
-
12 Dec 2001
Ron Matthews to Michelle Lokay, Darrell Schoolcraft, Kimberly Watson and 4 more
Burlington Study - El Paso WIndow Rock I/C
This is a revised spreadsheet from the one yesterday. Changes made were a result of discussions with Darrell. Still need to stick to our guns and NOT give Burlington any …
-
13 Nov 2001
Ron Matthews to James Centilli, Kevin Hyatt, Morgan Gottsponer and 2 more
Sun Devil Project - Fuel Study
Attached is an Excel spreadsheet comparing fuel used between Red Rock and propose Sun Devil projects. The Phoenix delivery of 500 MMcf/d is locked and the Cal. border del…
-
26 Oct 2001
Ron Matthews to Steven Harris, Kimberly Watson, Lorraine Lindberg and 12 more
Mainline Expansion 250 & 300 MMcf/d Scenarios - Revised
The attached reflect Marketing's request to have interest, overheads, and AFUDC split out for all line items. The revision also includes recent additional input by Engine…
-
24 Oct 2001
Ron Matthews to Lorraine Lindberg, Michelle Lokay, Kimberly Watson and 4 more
Mainline Expansion Scenarios
Attached are 250 and 300 MMcf/d cases to expand TW's mainline, Topock, and San Juan lateral. These are + 30% costs but still based on the latest E&C estimate for Sun Devi…
-
5 Oct 2001
Ron Matthews to Michelle Lokay, Dennis Alters, Morgan Gottsponer
Topock Lateral Expansion - 300 MMcf/d
Attached is a Level A ( + 30%) cost estimate prepared by Planning based on available information. If you have any questions, please call.
-
3 Oct 2001
Ron Matthews to John R. Keller, Jerry D. Martin, Doug Cebryk and 6 more
Sun Devil Cost Reconciliation
Attached is a Powerpoint slide showing the differences between the Planning's Level and Engineering's Level A+. Planning's Level A was update to include the current proje…
-
25 Sep 2001
Ron Matthews to Kimberly Watson, Dennis Alters, Morgan Gottsponer and 2 more
Caithness Big Sandy Project
Kim, The attached file contains a recap of the Timberline program results with a few mods. Basic information covers what Earl and I talked about today. Caithness engineer…
-
7 Sep 2001
Ron Matthews to Kevin Hyatt and 4 more
Ssun Devil Expansion Project - Level A Estimate
Attached is the scope and Level A cost estimate for the above mentioned project. This is the same package given to Engineering for them to prepare their Level B. Ron M.
-
30 Aug 2001
Ron Matthews to Norm Spalding, Morgan Gottsponer, John R. Keller and 7 more
RE: Sun Devil Pipeline Lengths
A preliminary model has been developed based on the limited information Doug, Kevin, and I discussed yesterday. A finished product won't be complete until such time as el…
-
22 Aug 2001
Ron Matthews to Kevin Hyatt, Morgan Gottsponer, Doug Cebryk and 4 more
Sun Devil Project - Level B Request "REVISED"
I found a mistake in the first Excel spreadsheet when discussing with Kim Kouri. Cost Estimate Summary sheet (2nd tab) did not add all of the rows down for the San Juan p…
-
21 Aug 2001
Ron Matthews to Kevin Hyatt, Morgan Gottsponer and 2 more
Sun Devil Project - Level B Request
Attached is a Level B request for the Sun Devil project. Keep in mind that this should include only right of way at this time. Details on the compression will probably ch…
-
20 Aug 2001
Ron Matthews to Kevin Hyatt, Morgan Gottsponer, Eric Faucheaux
Sun Devil Project
Attached is the latest and greatest breakdown of facilities and Level A costs related to Sun Devil. Facilities are not final and will be refined as the project unfolds.
-
13 Aug 2001
Ron Matthews to ketchek@bp.com and 6 more
Caithness - Big Sandy Project
Attached are the engineering standards you requested on our latest telephone discussion with Kim Watson. Also attached is a cost estimate summary that the numbers were ma…