  1. 11 Mar 2002

    Ron Matthews to Eric Gadd and 12 more

    RE: Sun Devil Cost Sheet

    No. Because of the problems that occurred with the swing loads, we had to go back to the fully looped line. Running steady state wasn't a problem but trying to meet peaks…

  2. 8 Mar 2002

    Ron Matthews to Arnold L. Eisenstein, Eric Gadd, Kevin Hyatt and 5 more

    RE: Sun Devil Cost Sheet

    Eric, There are a multitude of cases run on this project over time and it's hard for everyone to pick the most current. Please refer any facility questions to Planning an…

  3. 16 Jan 2002

    Ron Matthews to Steven Harris, Kimberly Watson, Lorraine Lindberg and 7 more

    San Juan Expansion Options - Small Volume

    Marketing requested Planning to review any and all possibilities to achieve small volume expansions through the San Juan lateral. Several facility scenarios were investig…

  4. 7 Jan 2002

    Ron Matthews to marcello.minotti@enron.com, Arnold L. Eisenstein, Doug Cebryk and 2 more

    Sun Devil Design Conditions

    Sorry I left the above out of the first email. Attached is the latest and greatest taken from Winflow. There is a possibility of elimianting Bloomfield unit #5 but don't …

  5. 7 Jan 2002

    Ron Matthews to Doug Cebryk, Arnold L. Eisenstein, Dennis Alters and 3 more

    Sun Devil Alterative - Revision #10

    Attached is a revised scope which basically includes the majority of the expansion volume to Phoenix. Only 30 MMcf/d goes west of Station #2 while 500 MMcf/d goes to Phoe…

  6. 26 Oct 2001

    Ron Matthews to Steven Harris, Kimberly Watson, Lorraine Lindberg and 12 more

    Mainline Expansion 250 & 300 MMcf/d Scenarios - Revised

    The attached reflect Marketing's request to have interest, overheads, and AFUDC split out for all line items. The revision also includes recent additional input by Engine…

  7. 3 Oct 2001

    Ron Matthews to John R. Keller, Jerry D. Martin, Doug Cebryk and 6 more

    Sun Devil Cost Reconciliation

    Attached is a Powerpoint slide showing the differences between the Planning's Level and Engineering's Level A+. Planning's Level A was update to include the current proje…

  8. 22 Aug 2001

    Ron Matthews to Kevin Hyatt, Morgan Gottsponer, Doug Cebryk and 4 more

    Sun Devil Project - Level B Request "REVISED"

    I found a mistake in the first Excel spreadsheet when discussing with Kim Kouri. Cost Estimate Summary sheet (2nd tab) did not add all of the rows down for the San Juan p…

  9. 21 Aug 2001

    Ron Matthews to Kevin Hyatt, Morgan Gottsponer and 2 more

    Sun Devil Project - Level B Request

    Attached is a Level B request for the Sun Devil project. Keep in mind that this should include only right of way at this time. Details on the compression will probably ch…