Enron email

Algorithmic Indexing

12 messages for from:stacy.runswick@enron.com to:shift.portland@enron.com

Newest Oldest

Matching messages by month
Skilling resigns
Q3 loss announced
Bankruptcy filing

from:stacy.runswick@enron.com means Stacy Runswick (stacy.runswick@enron.com).

to:shift.portland@enron.com means shift.portland@enron.com.

  1. 20 Jul 2001

    Stacy Runswick to shift.portland@enron.com and 8 more

    Length at PV heavy for the 20th

    We are 25 mws long HE 7-22 at palo verde in the real-time position manager. I printed a forward obligation report for the 20th and that report does not reflect this lengt…

  2. 19 Jul 2001

    Stacy Runswick to mgmt.dl-portland@enron.com and 8 more

    Liquidated Damages that need to be passed on to Mirant

    Per several conversations with Mirant (our upstream) and Pinwest (our downstream) the following situation occurred on July 19th between 2:30 p.m. and 4:00 p.m. Deal #6943…

  3. 20 Jun 2001

    Stacy Runswick to shift.portland@enron.com

    MIDC SCHEDULE GOING REAL-TIME 6/20/01

    There is a 25 mw heavy load schedule that BPA is generating (contract# 23299) and PGE sinks at system. The schedule is going real-time because BPA transmission group did …

  4. 19 Jun 2001

    Stacy Runswick to shift.portland@enron.com

    MIDC SCHEDULE GOING REAL-TIME 6/20/01

    There is a 25 mw heavy load schedule that BPA is generating (contract# 23299) and PGE sinks at system. The schedule is going real-time because BPA transmission group did …

  5. 19 Jun 2001

    Stacy Runswick to shift.portland@enron.com

    Another MIDC schedule going real-time

    There is a 25 mw heavy load schedule that BPA is generating (contract# 23928) and SPP sinks at Humbolt. The schedule is going real-time because SPP reported the transmiss…

  6. 19 Jun 2001

    Stacy Runswick to shift.portland@enron.com

    MID C schedule going real-time

    There is a 25 mw light load schedule that Aquila Canada is generating and AVA sinks at there system. The schedule is going real-time because Aquila reported the transmiss…

  7. 18 Jun 2001

    Stacy Runswick to shift.portland@enron.com

    Another MIDC schedule going real-time

    There is a 25 mw heavy load schedule that BPA is generating (contract# 23928) and SPP sinks at Humbolt. The schedule is going real-time because SPP reported the transmiss…

  8. 18 Jun 2001

    Stacy Runswick to shift.portland@enron.com

    MID C schedule going real-time

    There is a 25 mw light load schedule that Aquila Canada is generating and AVA sinks at there system. The schedule is going real-time because Aquila reported the transmiss…

  9. 9 Jun 2001

    Stacy Runswick to shift.portland@enron.com

    Four Corners schedule for the 11th that needs to be tagged real-time

    The following day ahead tag# 24395 for the 11th was denied by WACM because it was submitted after the 3:00pdt tag deadline. Tag# 24365 was the predecessor and was approve…

  10. 9 Jun 2001

    Stacy Runswick to shift.portland@enron.com

    Four Corners schedule for the 11th that needs to be tagged real-time

    The following day ahead tag# 24395 for the 11th was denied by WACM because it was submitted after the 3:00pdt tag deadline. Tag# 24365 was the predecessor and was approve…

  11. 2 Jun 2001

    Stacy Runswick to shift.portland@enron.com, Cara Semperger

    10 MW schedule Heavy Load for the June 2nd at Mead

    Please refer to Enron Tag #23876. The path is BHPLGS gen @ BHPLSYSTEM- BHPL (T) BHPL/STGL - BHPLGS - MEAN - LAPT(T)STEGW/DAVEJOHNSTON - MEAN - MIRANT- PPW(T)DAVEJOHNSTON/…

  12. 2 Jun 2001

    Stacy Runswick to shift.portland@enron.com, Cara Semperger

    10 MW schedule Heavy Load for the June 2nd at Mead

    Please refer to Enron Tag #23876. The path is BHPLGS gen @ BHPLSYSTEM- BHPL (T) BHPL/STGL - BHPLGS - MEAN - LAPT(T)STEGW/DAVEJOHNSTON - MEAN - MIRANT- PPW(T)DAVEJOHNSTON/…