Another MIDC schedule going real-time

From
Stacy Runswick stacy.runswick@enron.com
To
shift.portland@enron.com
Date
Mon, 18 Jun 2001 19:49:28 -0700 (PDT)
There is a 25 mw heavy load schedule that BPA is generating (contract# 23928) and SPP sinks at Humbolt.   The schedule is going real-time because SPP reported the transmission incorrectly to AVA transmission group.  We bought from BPA Deal # 486140.1 and sold to SPP Deal # 610573.1.  Please refer to SPP tag number #2848.  Be sure to call everyone in the path to check out.  

Thanks,
Stacy
(503)807-7861