Another MIDC schedule going real-time
- From
- Stacy Runswick stacy.runswick@enron.com
- Date
- Mon, 18 Jun 2001 19:49:28 -0700 (PDT)
There is a 25 mw heavy load schedule that BPA is generating (contract# 23928) and SPP sinks at Humbolt. The schedule is going real-time because SPP reported the transmission incorrectly to AVA transmission group. We bought from BPA Deal # 486140.1 and sold to SPP Deal # 610573.1. Please refer to SPP tag number #2848. Be sure to call everyone in the path to check out. Thanks, Stacy (503)807-7861