from:stacy.runswick@enron.com means Stacy Runswick (stacy.runswick@enron.com).
-
20 Jun 2001
Stacy Runswick to shift.portland@enron.com
MIDC SCHEDULE GOING REAL-TIME 6/20/01
There is a 25 mw heavy load schedule that BPA is generating (contract# 23299) and PGE sinks at system. The schedule is going real-time because BPA transmission group did …
-
19 Jun 2001
Stacy Runswick to shift.portland@enron.com
MIDC SCHEDULE GOING REAL-TIME 6/20/01
There is a 25 mw heavy load schedule that BPA is generating (contract# 23299) and PGE sinks at system. The schedule is going real-time because BPA transmission group did …
-
19 Jun 2001
Stacy Runswick to shift.portland@enron.com
Another MIDC schedule going real-time
There is a 25 mw heavy load schedule that BPA is generating (contract# 23928) and SPP sinks at Humbolt. The schedule is going real-time because SPP reported the transmiss…
-
19 Jun 2001
Stacy Runswick to shift.portland@enron.com
MID C schedule going real-time
There is a 25 mw light load schedule that Aquila Canada is generating and AVA sinks at there system. The schedule is going real-time because Aquila reported the transmiss…
-
18 Jun 2001
Stacy Runswick to shift.portland@enron.com
Another MIDC schedule going real-time
There is a 25 mw heavy load schedule that BPA is generating (contract# 23928) and SPP sinks at Humbolt. The schedule is going real-time because SPP reported the transmiss…
-
18 Jun 2001
Stacy Runswick to shift.portland@enron.com
MID C schedule going real-time
There is a 25 mw light load schedule that Aquila Canada is generating and AVA sinks at there system. The schedule is going real-time because Aquila reported the transmiss…
-
9 Jun 2001
Stacy Runswick to shift.portland@enron.com
Four Corners schedule for the 11th that needs to be tagged real-time
The following day ahead tag# 24395 for the 11th was denied by WACM because it was submitted after the 3:00pdt tag deadline. Tag# 24365 was the predecessor and was approve…
-
9 Jun 2001
Stacy Runswick to shift.portland@enron.com
Four Corners schedule for the 11th that needs to be tagged real-time
The following day ahead tag# 24395 for the 11th was denied by WACM because it was submitted after the 3:00pdt tag deadline. Tag# 24365 was the predecessor and was approve…
-
2 Jun 2001
Stacy Runswick to shift.portland@enron.com, Cara Semperger
10 MW schedule Heavy Load for the June 2nd at Mead
Please refer to Enron Tag #23876. The path is BHPLGS gen @ BHPLSYSTEM- BHPL (T) BHPL/STGL - BHPLGS - MEAN - LAPT(T)STEGW/DAVEJOHNSTON - MEAN - MIRANT- PPW(T)DAVEJOHNSTON/…
-
2 Jun 2001
Stacy Runswick to shift.portland@enron.com, Cara Semperger
10 MW schedule Heavy Load for the June 2nd at Mead
Please refer to Enron Tag #23876. The path is BHPLGS gen @ BHPLSYSTEM- BHPL (T) BHPL/STGL - BHPLGS - MEAN - LAPT(T)STEGW/DAVEJOHNSTON - MEAN - MIRANT- PPW(T)DAVEJOHNSTON/…