  1. 28 Jan 2002

    Ron Matthews to Ben Asante, Dennis Alters, Darrell Schoolcraft and 5 more

    San Juan Lateral 10 MM/d Expansion

    I'm getting old! Wondered why I couldn't find this is my sent folder. Still in my draft folder. Please review ASAP. This will be sent to Steve Harris, Kim Watson, and Lor…

  2. 25 Jan 2002

    Ron Matthews to Morgan Gottsponer, Ben Asante, Dennis Alters and 8 more

    FW: Bloomfield horsepower

    This shows that with a 350 Hp increase per unit, we would still not exceed operational Hp even in the winter. We max out about 4500 Hp in the summer on a good day and thi…

  3. 24 Jan 2002

    Ron Matthews to Earl Chanley and 8 more

    Bloomfield Units 1 & 2 Inlet Air Coolers

    This letter is Planing's request for Engineering to look at the cost and timing to install in let air cooling on units 1 & 2. The summer ambient temperature is 95 F and t…

  4. 11 Jan 2002

    Ron Matthews to Darrell Schoolcraft and 14 more

    Station #4 Overhaul Outage

    Planning and System Optimization have agreed that the effected throughput during the Station #4 overhaul outage should be 150 MMcf/d. This should be posted and the firm t…

  5. 7 Jan 2002

    Ron Matthews to Doug Cebryk, Arnold L. Eisenstein, Dennis Alters and 3 more

    Sun Devil Alterative - Revision #10

    Attached is a revised scope which basically includes the majority of the expansion volume to Phoenix. Only 30 MMcf/d goes west of Station #2 while 500 MMcf/d goes to Phoe…

  6. 12 Dec 2001

    Ron Matthews to Michelle Lokay, Darrell Schoolcraft, Kimberly Watson and 4 more

    Burlington Study - El Paso WIndow Rock I/C

    This is a revised spreadsheet from the one yesterday. Changes made were a result of discussions with Darrell. Still need to stick to our guns and NOT give Burlington any …

  7. 13 Nov 2001

    Ron Matthews to James Centilli, Kevin Hyatt, Morgan Gottsponer and 2 more

    Sun Devil Project - Fuel Study

    Attached is an Excel spreadsheet comparing fuel used between Red Rock and propose Sun Devil projects. The Phoenix delivery of 500 MMcf/d is locked and the Cal. border del…

  8. 26 Oct 2001

    Ron Matthews to Steven Harris, Kimberly Watson, Lorraine Lindberg and 12 more

    Mainline Expansion 250 & 300 MMcf/d Scenarios - Revised

    The attached reflect Marketing's request to have interest, overheads, and AFUDC split out for all line items. The revision also includes recent additional input by Engine…

  9. 24 Oct 2001

    Ron Matthews to Lorraine Lindberg, Michelle Lokay, Kimberly Watson and 4 more

    Mainline Expansion Scenarios

    Attached are 250 and 300 MMcf/d cases to expand TW's mainline, Topock, and San Juan lateral. These are + 30% costs but still based on the latest E&C estimate for Sun Devi…

  10. 5 Oct 2001

    Ron Matthews to Michelle Lokay, Dennis Alters, Morgan Gottsponer

    Topock Lateral Expansion - 300 MMcf/d

    Attached is a Level A ( + 30%) cost estimate prepared by Planning based on available information. If you have any questions, please call.

  11. 3 Oct 2001

    Ron Matthews to John R. Keller, Jerry D. Martin, Doug Cebryk and 6 more

    Sun Devil Cost Reconciliation

    Attached is a Powerpoint slide showing the differences between the Planning's Level and Engineering's Level A+. Planning's Level A was update to include the current proje…

  12. 25 Sep 2001

    Ron Matthews to Kimberly Watson, Dennis Alters, Morgan Gottsponer and 2 more

    Caithness Big Sandy Project

    Kim, The attached file contains a recap of the Timberline program results with a few mods. Basic information covers what Earl and I talked about today. Caithness engineer…

  13. 7 Sep 2001

    Ron Matthews to Kevin Hyatt and 4 more

    Ssun Devil Expansion Project - Level A Estimate

    Attached is the scope and Level A cost estimate for the above mentioned project. This is the same package given to Engineering for them to prepare their Level B. Ron M.

  14. 30 Aug 2001

    Ron Matthews to Norm Spalding, Morgan Gottsponer, John R. Keller and 7 more

    RE: Sun Devil Pipeline Lengths

    A preliminary model has been developed based on the limited information Doug, Kevin, and I discussed yesterday. A finished product won't be complete until such time as el…

  15. 22 Aug 2001

    Ron Matthews to Kevin Hyatt, Morgan Gottsponer, Doug Cebryk and 4 more

    Sun Devil Project - Level B Request "REVISED"

    I found a mistake in the first Excel spreadsheet when discussing with Kim Kouri. Cost Estimate Summary sheet (2nd tab) did not add all of the rows down for the San Juan p…

  16. 21 Aug 2001

    Ron Matthews to Kevin Hyatt, Morgan Gottsponer and 2 more

    Sun Devil Project - Level B Request

    Attached is a Level B request for the Sun Devil project. Keep in mind that this should include only right of way at this time. Details on the compression will probably ch…

  17. 20 Aug 2001

    Ron Matthews to Kevin Hyatt, Morgan Gottsponer, Eric Faucheaux

    Sun Devil Project

    Attached is the latest and greatest breakdown of facilities and Level A costs related to Sun Devil. Facilities are not final and will be refined as the project unfolds.

  18. 13 Aug 2001

    Ron Matthews to ketchek@bp.com and 6 more

    Caithness - Big Sandy Project

    Attached are the engineering standards you requested on our latest telephone discussion with Kim Watson. Also attached is a cost estimate summary that the numbers were ma…