  1. 19 Mar 2002

    Ron Matthews to Denis Tu, Tracy Geaccone, Kevin A. Howard and 3 more

    FW: TW Asset Description

    Denis caught a mistake (or typo) in yesterday's memo. The correction is in RED below. Ron M.

  2. 18 Mar 2002

    Ron Matthews to Denis Tu, Tracy Geaccone, Kevin A. Howard and 3 more

    TW Asset Description

    Asset Base TW's physical assets will include 2,618 miles of pipe ranging from 2 inch to 30 inch diameter and 29 mainline and lateral compressor stations including three e…

  3. 11 Mar 2002

    Ron Matthews to Eric Gadd and 12 more

    RE: Sun Devil Cost Sheet

    No. Because of the problems that occurred with the swing loads, we had to go back to the fully looped line. Running steady state wasn't a problem but trying to meet peaks…

  4. 8 Mar 2002

    Ron Matthews to Arnold L. Eisenstein, Eric Gadd, Kevin Hyatt and 5 more

    RE: Sun Devil Cost Sheet

    Eric, There are a multitude of cases run on this project over time and it's hard for everyone to pick the most current. Please refer any facility questions to Planning an…

  5. 13 Feb 2002

    Ron Matthews to Bill Rapp and 12 more

    Bloomfield Inlet Air Cooler Project

    Bill, The following is a brief desciption of the above mentioned project. The Bloomfield air inlet cooler project consist of the installation of evaporative pads around t…

  6. 12 Feb 2002

    Ron Matthews to Michelle Lokay, James Centilli and 4 more

    Bakersfield Power Plants Project

    Attached is an Excel spreadsheet showing the costs to build a 20-mile 20" pipeline from PG&E to Bakersfield. Thereis a sheet for the pipeline and one for the measurement.…

  7. 12 Feb 2002

    Ron Matthews to acook@utilicorp.com and 6 more

    Transwestern Historical Pressures - Kingman

    Alan, Attached is an Excel spreadsheet with historical pressures at two points. The column titled south of Kingman will be the closes point off TW's mainline to the Red L…

  8. 8 Feb 2002

    Ron Matthews to Lindy Donoho and 6 more

    TW History

    This is very lengthy but the best I can do in a rush. Didn't have time to research all of the times and miles of pipe but did the best I could. If we need the details, le…

  9. 31 Jan 2002

    Ron Matthews to Kevin Hyatt, James Centilli, Ben Asante

    Sun Devil Expansion Options

    The attached 750 & 1000 MMcf/d cases have been reviewed by the team. Both cases include 30 MMcf/d west beyond Phoenix. The expansions assumes all flow is from San Juan to…

  10. 29 Jan 2002

    Ron Matthews to Kevin Hyatt, Eric Gadd and 4 more

    Sun Devil Cases

    Attached are the 750 & 1000 MMcf/d cases we discussed earlier. I've copied Doug Cybrek too so he will have the latest. Ron Matthews

  11. 28 Jan 2002

    Ron Matthews to Ben Asante, Dennis Alters, Darrell Schoolcraft and 5 more

    San Juan Lateral 10 MM/d Expansion

    I'm getting old! Wondered why I couldn't find this is my sent folder. Still in my draft folder. Please review ASAP. This will be sent to Steve Harris, Kim Watson, and Lor…

  12. 25 Jan 2002

    Ron Matthews to Morgan Gottsponer, Ben Asante, Dennis Alters and 8 more

    FW: Bloomfield horsepower

    This shows that with a 350 Hp increase per unit, we would still not exceed operational Hp even in the winter. We max out about 4500 Hp in the summer on a good day and thi…

  13. 24 Jan 2002

    Ron Matthews to Earl Chanley and 8 more

    Bloomfield Units 1 & 2 Inlet Air Coolers

    This letter is Planing's request for Engineering to look at the cost and timing to install in let air cooling on units 1 & 2. The summer ambient temperature is 95 F and t…

  14. 16 Jan 2002

    Ron Matthews to Steven Harris, Kimberly Watson, Lorraine Lindberg and 7 more

    San Juan Expansion Options - Small Volume

    Marketing requested Planning to review any and all possibilities to achieve small volume expansions through the San Juan lateral. Several facility scenarios were investig…

  15. 11 Jan 2002

    Ron Matthews to Darrell Schoolcraft and 14 more

    Station #4 Overhaul Outage

    Planning and System Optimization have agreed that the effected throughput during the Station #4 overhaul outage should be 150 MMcf/d. This should be posted and the firm t…

  16. 8 Nov 2001

    Ron Matthews to Kevin Hyatt, Ben Asante

    RE: Sun Devil delivery pressure

    Kevin, That is the scenario where we installed all 36" pipe and added two new stations (Station #1.5 & Kingman). The pressure to Panda will be greater than 600 psig. The …

  17. 26 Oct 2001

    Ron Matthews to Steven Harris, Kimberly Watson, Lorraine Lindberg and 12 more

    Mainline Expansion 250 & 300 MMcf/d Scenarios - Revised

    The attached reflect Marketing's request to have interest, overheads, and AFUDC split out for all line items. The revision also includes recent additional input by Engine…

  18. 30 Aug 2001

    Ron Matthews to Norm Spalding, Morgan Gottsponer, John R. Keller and 7 more

    RE: Sun Devil Pipeline Lengths

    A preliminary model has been developed based on the limited information Doug, Kevin, and I discussed yesterday. A finished product won't be complete until such time as el…