Enron email

Algorithmic Indexing

15 messages for from:larry.campbell@enron.com to:michel.nelson@enron.com

Newest Oldest

Matching messages by month
Skilling resigns
Q3 loss announced
Bankruptcy filing

from:larry.campbell@enron.com means Larry Campbell (larry.campbell@enron.com).

to:michel.nelson@enron.com means Michel Nelson (michel.nelson@enron.com).

  1. 11 Aug 2000

    Larry Campbell to Louis Soldano, John Shafer and 14 more

    PCB Study on the SoCal System

    I received a call from Ralph Komai, PCB engineer with SoCal, about a pipeline liquids collection SoCal wants to take at our Needles facility. Ralph said that SoCal will b…

  2. 5 Jul 2000

    Larry Campbell to Michel Nelson, Rich Jolly, David Roensch and 10 more

    Latest deconning Activity-Topock Lateral

    As a result of the latest meeting with PG&E over the greater than 500 ppm PCB liquids collection at the PGE Topock C/S filter separator (F/S), presented below is a summar…

  3. 12 Jun 2000

    Larry Campbell to Michel Nelson, John Shafer, Rich Jolly and 11 more

    Additonal PCB Sampling on the SoCal System

    During the quarterly conference call with SoCal in which we discuss PCB costs on the SoCal system, for which Transwesten is 86% responsible, Ralph Komai, SoCal's PCB pers…

  4. 15 May 2000

    Larry Campbell to Michel Nelson, Rich Jolly, Earl Chanley and 5 more

    May PCB Meeting Notes ET&S and PG&E

    1. Status of Mainline Filter Separator Project. Earl Chanley has indicated that the June 1 target date for in service is on schedule. There will be 2 mainline separators …

  5. 28 Mar 2000

    Larry Campbell to Michel Nelson and 14 more

    Re: Ralph Komai, Training Presentation

    Mike, I spoke to Ralph and he gave me an open week of April 17th in San Francisco. He thought that one day would be more that adequate. I need to have somebody contact th…

  6. 15 Mar 2000

    Larry Campbell to Rick Craig, Michel Nelson, Michael Terraso and 8 more

    PG&E/Southwest Gas Meeting

    On tuesday of this week, Lou Soldano and I attended a meeting between the above referenced parties concerning the issue of PCB's which had migrated into the PG&E system. …

  7. 13 Mar 2000

    Larry Campbell to Rick Craig, William Kendrick, Rick Cates and 5 more

    Media Statement

    Just a short note to let you know that I received a call from Rod Bosche of PG&E apprising me of a meeting PG&E will be having with SW Gas this tuesday. They will be disc…

  8. 12 Nov 1999

    Larry Campbell to Michael Terraso, Rich Jolly, Louis Soldano and 9 more

    Conference Cal with Adewumi

    This is just a short update on the conference call just completed with Michael Adewumi of Penn State, concerning the PCB pipeline modeling project proposed for the Transw…

  9. 4 Oct 1999

    Larry Campbell to Rich Jolly and 14 more

    Re: Penn State Visit

    Rich, whats your thoughts on a decent pipeline segment for the modeling study. I kind of like Sta. 4 to Sta. 3. It encompasses alot of the variablity present on the Trans…

  10. 27 Aug 1999

    Larry Campbell to Earl Chanley, William Kendrick, Rich Jolly and 6 more

    PG&E PCB Meeting with John Woodyard

    In light of the recent PCB issue with PG&E on the Topock Lateral, I have asked Mr. John Woodyard of Roy F. Westin to c ome to Houston and make a presentation on PCB's in …

  11. 10 Aug 1999

    Larry Campbell to David Roensch and 12 more

    Re: PG&E

    The environmental clearances are still in effect as long as we stay on our right of way and in our measuring station yard. For any construction work at the PG&E station, …

  12. 23 Jul 1999

    Larry Campbell to Michel Nelson, Rich Jolly, David Roensch and 11 more

    Recent PCB Results, Topock Lateral

    A 2:00 pm central time conference call has been scheduled to discuss the most recent analytical results from the Topock Lateral PCB sampling. Your attendence is requested…

  13. 23 Jul 1999

    Larry Campbell to Michel Nelson, David Roensch, Rich Jolly and 9 more

    Recent PCB Analytical Results, Topock Lateral

    A 2:00 pm central time conference call has been scheduled to discuss the most recent PCB analytical results for the Topock Lateral. Your attendance is requested. The dial…

  14. 11 Jun 1999

    Larry Campbell to Rich Jolly, Michel Nelson, David Roensch and 8 more

    Cleaning Postponement of the pipeline between TW PG&E M/S and the Topock C/S

    Based upon valving constraints and the innaccessability to the inside of the pipe between our M/S and the Topock C/S, a decision has been made to postpone cleaning of his…

  15. 5 May 1999

    Larry Campbell to Michel Nelson, Rich Jolly, Louis Soldano and 9 more

    Results of the PG&E Filter Separator Cleaning

    Just a short message to apprise everyone of the cleaning results performed on the filter separator from the Transwestern M/S. Wipe tests taken of the interrior portions o…