Enron email

Algorithmic Indexing

39 messages for from:larry.campbell@enron.com to:butch.russell@enron.com

Newest Oldest

Matching messages by month
Skilling resigns
Q3 loss announced
Bankruptcy filing

from:larry.campbell@enron.com means Larry Campbell (larry.campbell@enron.com).

to:butch.russell@enron.com means Butch Russell (butch.russell@enron.com).

  1. 14 Aug 2001

    Larry Campbell to team.artesia@enron.com, team.big-lake@enron.com, team.carlsbad@enron.com and 54 more

    Southwest Region Environmental Roundtable Oct. 16-18

    The Southwest Region will be hosting its 2001 environmental roundtable in Albuquerque, NM on October 16-17 at the Holiday Inn Crowne Plaza (505) 821-3333. Room rates are …

  2. 4 Apr 2001

    Larry Campbell to Rick Loveless, Mike Riedel, Butch Russell and 2 more

    Weekly Environmental Activity-Roswell Area

    The Title V air permit applications for C/S's 3 and 4 were submitted to Region IX EPA in San Francisco. These were the last two applications to be filed for the Redrock M…

  3. 8 Mar 2001

    Larry Campbell to gary.fuller@enron.com, Rick Loveless, Mike Riedel and 1 more

    weekly environmental activity report-Roswell Area

    A meeting has been scheduled on 3/16 with the California Fish and Game to discuss the following issues: 1)presentaiton of the 1999 and 2000 annual reports which are requi…

  4. 24 Jan 2001

    Larry Campbell to Butch Russell

    EOTT Spreadsheet

    see attached save for thursday

  5. 24 Jan 2001

    Larry Campbell to Team San-Juan-LaPlata and 6 more

    Re: La Plata emissions issues

    Rick, Terry had informed me that Solar had trouble with this unit in making its emissions guarantees, prior to shipping it to La Plata. I was not aware of this when I per…

  6. 24 Jan 2001

    Larry Campbell to John Shafer, Louis Soldano, Cutty Cunningham and 13 more

    Meeting with the Laguna's over the PCB remediation at C/S 6

    I wanted to present this summary of the meeting Transwestern had with representatives of the Laguna Pueblo concerning the status of the PCB remediation activities by TW. …

  7. 10 Jan 2001

    Larry Campbell to William Kendrick, John Shafer, Louis Soldano and 8 more

    Re: Environmental -- NCL

    Bill, Just a short note to let you know whats going on at Bakersfield. I have spoken to the agency inspector about one of the NOV issues and have been told that EOTT will…

  8. 29 Nov 2000

    Larry Campbell to Louis Soldano, John Shafer and 8 more

    EOTT concerns with Fuller's resignation

    I had dinner tonight with a Robert Jacobs EOTT V.P. West Coast and Ed Attanasio EOTT Senior Counsel. This dinner meeting was put together by Gary Fuller. Both Jacobs and …

  9. 6 Nov 2000

    Larry Campbell to Rich Jolly, mike.bonnstetter@enron.com, david.boothe@enron.com and 5 more

    ADEQ Requirement for Notification of Mechanical Activities

    I received a call from a permit engineer with the Arizona Dept. of Environmental Quality (ADEQ) concerning the issue of notification of mechanical activities at C/S 2 Fla…

  10. 11 Aug 2000

    Larry Campbell to Louis Soldano, John Shafer and 14 more

    PCB Study on the SoCal System

    I received a call from Ralph Komai, PCB engineer with SoCal, about a pipeline liquids collection SoCal wants to take at our Needles facility. Ralph said that SoCal will b…

  11. 1 Aug 2000

    Larry Campbell to Rick Cates, Rich Jolly, William Kendrick and 4 more

    Testing at Station 3

    When we do the emissions testing at C/S No. 3, Luepp, we should be aware of the positives and negatives. The positives being the information which Steve and company will …

  12. 5 Jul 2000

    Larry Campbell to Michel Nelson, Rich Jolly, David Roensch and 10 more

    Latest deconning Activity-Topock Lateral

    As a result of the latest meeting with PG&E over the greater than 500 ppm PCB liquids collection at the PGE Topock C/S filter separator (F/S), presented below is a summar…

  13. 12 Jun 2000

    Larry Campbell to Michel Nelson, John Shafer, Rich Jolly and 11 more

    Additonal PCB Sampling on the SoCal System

    During the quarterly conference call with SoCal in which we discuss PCB costs on the SoCal system, for which Transwesten is 86% responsible, Ralph Komai, SoCal's PCB pers…

  14. 1 Jun 2000

    Larry Campbell to Gallup-Sta4, Team, Team Gallup and 6 more

    Title V Permit for C/S No. 4, Klagetoh

    The Title V air permit for C/S No. 4 has been issued. There are some requirements and conditions under this permit that the team should be aware of and will be required t…

  15. 26 May 2000

    Larry Campbell to George Robinson and 4 more

    Re: TW Laguna Station Remediation

    Thanx George for the update. Norm would you mind visiting with Ms. Bernacik and explaining to her the difference between the excavation area where the underground tanks w…

  16. 5 May 2000

    Larry Campbell to George Robinson, Team Laguna and 4 more

    Re: Sta. 6 UST Excavation

    George/Norm because there is no immediate concern or liability with the partially filled excavation, I want us wait for the official letter from the tribe before taking i…

  17. 3 May 2000

    Larry Campbell to Team San-Juan-LaPlata and 6 more

    Emission Factors for Permit No. 97LP0653

    Larry, as per our conversation, presented below are the emissions factors provided by the state of Colorado for the T-7000 Centaur under permit 97LP0653 : PM10 14.000/MMS…

  18. 28 Mar 2000

    Larry Campbell to Michel Nelson and 14 more

    Re: Ralph Komai, Training Presentation

    Mike, I spoke to Ralph and he gave me an open week of April 17th in San Francisco. He thought that one day would be more that adequate. I need to have somebody contact th…

  19. 15 Mar 2000

    Larry Campbell to Rick Craig, Michel Nelson, Michael Terraso and 8 more

    PG&E/Southwest Gas Meeting

    On tuesday of this week, Lou Soldano and I attended a meeting between the above referenced parties concerning the issue of PCB's which had migrated into the PG&E system. …

  20. 2 Mar 2000

    Larry Campbell to Michael Terraso, William Kendrick, Rick Cates and 2 more

    (no subject)

    Mike I wanted to give a short update on the latest events related to the PCB issue with PG&E. Transwestern met with PG&E this last Wednesday with an agenda that included …

  21. 2 Mar 2000

    Larry Campbell to Michael Terraso, William Kendrick, Rick Cates and 2 more

    (no subject)

    Mike I wanted to give a short update on the latest events related to the PCB issue with PG&E. Transwestern met with PG&E this last Wednesday with an agenda that included …

  22. 3 Feb 2000

    Larry Campbell to Bret Reich and 12 more

    Transwestern's Facilities List

    Bret, per ;you request, presented below is a list of Priority 1 and 2 sites in Arizona, New Mexico, Colorado and Texas for which we have running horsepower and emit emiss…

  23. 2 Feb 2000

    Larry Campbell to team.artesia@enron.com, team.monahans@enron.com, Team San-Juan and 8 more

    Nitrogen and Sulfur reporting and Recordkeeping for Turbines

    For those teams that have turbines installed after 1990 and/or for those turbines which have undergone power unit changouts, the following recordkeeping and monitoring co…

  24. 26 Jan 2000

    Larry Campbell to team.artesia@enron.com, steve.sanmiguel@enron.com and 6 more

    Maintenance Activities at Atoka No. 3 C/S

    I think its time that we did a maintenace spot check on the White units at the above referenced facility, to stay in line with the operating conditions of the facility pe…

  25. 18 Nov 1999

    Larry Campbell to Michael Terraso, Rick Cates, William Kendrick and 6 more

    Results of the Environmental Meeting at C/S 6, Laguna

    A meeting was held at C/S 6, Laguna on Tuesday November 16th, to reintroduce the pueblo of Laguna to Transwestern's environmental activities at the facility. The Laguna's…