from:gary.spraggins@enron.com means Gary Spraggins (gary.spraggins@enron.com).
-
25 Mar 2002
Gary Spraggins to controllers.dl-ets@enron.com
NBPL Tuesday, March 26th
We will be taking an additional 30,000 from NBPL Tuesday, 26th. It will not be in the schedule. Gary
-
25 Mar 2002
Gary Spraggins to controllers.dl-ets@enron.com and 2 more
RE: Dumas Plant - POI 18058
-----Original Message----- From: Janzen, Randy Sent: Monday, March 25, 2002 1:23 PM To: Spearman, Team; Sunray-Compressor, Team; Sunray-Field, Team; Blair, Lynn; Vaughan,…
-
21 Mar 2002
Gary Spraggins to controllers.dl-ets@enron.com
GPM Dumas
GPM Dumas will be shutting their process plant down in the morning Friday, March 22, through Tuesday, March 26th. During this time Sunray will switch them from the C-line…
-
21 Mar 2002
Gary Spraggins to controllers.dl-ets@enron.com
Linam Ranch
If GPM Linam Ranch wants to come on this afternoon without a nom let them come on. They owe us 17,000 for the month. I will check with you before intra day 2 nom to see i…
-
21 Mar 2002
Gary Spraggins to controllers.dl-ets@enron.com
FW: NBPL gas 3-22
FYI- Plan to get additional 30,000 from NBPL Friday. This will not be reflected in the schedule. Gary
-
21 Mar 2002
Gary Spraggins to Randy LeBeau, team.sunray-compressor@enron.com, controllers.dl-ets@enron.com and 2 more
FW: GPM/Duke Dumas Plant Update
FYI Well it looks like they have change their mind again. As of now we don't know when they will be shuting their plant down. Gary
-
18 Mar 2002
Gary Spraggins to controllers.dl-ets@enron.com
Jal Compressor
Jal will be unavailble 8 hours to check relief valves and change out a 12" valve. Gary
-
14 Mar 2002
Gary Spraggins to controllers.dl-ets@enron.com
FW: Amarillo Region Weekly Report
-----Original Message----- From: Lebeau, Randy Sent: Thursday, March 14, 2002 9:52 AM To: Adamson, Alvin; Barbee, Roger; Beaver-Mach-Shop, Team; Beaver-Plant, Team; Blair…
-
13 Mar 2002
Gary Spraggins to Gary Spraggins, controllers.dl-ets@enron.com and 4 more
RE: Trailblazer Outage April
Update from NGPL : April 8th through the 11th compressor station 602 will down to rewheel compressor. NGPL will be able to free flow 520,000 mmbtu/d on their line while s…
-
25 Feb 2002
Gary Spraggins to controllers.dl-ets@enron.com
Hugoton Outage Reporting & Communications
Last week we had our annual Links meeting in Liberal to go over upcoming outages this summer and coordinate them with Mobile & OXY (well testing) and Oneok ( field compre…
-
25 Feb 2002
Gary Spraggins to controllers.dl-ets@enron.com and 2 more
Trailblazer Outage April
It was reported in the morning meeting today that NGPL Trailblazer will be having an outage April 9,10&11, at which time there will be no gas available to flow at the tra…
-
22 Feb 2002
Gary Spraggins to controllers.dl-ets@enron.com, team.ogden-field@enron.com, John Sturn
Ogden Operations conf.call
The Ogden Operations conf. call has been scheduled for 10:30 A.M. today. The number is 1-877-795-3687 code 527126. Thanks Gary
-
22 Feb 2002
Gary Spraggins to Jerry Graves, Team Bushton-Maintenance, team.bushton-operations@enron.com and 4 more
RE: Bushton Unit 31 Outage
Currently the Northend temperatures show to drop from mid 30's Saturday to 19 degrees Sunday and 10 degrees for system weighted temperature for Monday and start back up i…
-
21 Feb 2002
-
14 Feb 2002
Gary Spraggins to controllers.dl-ets@enron.com
POI- 17378 NNG/KN Burdett PDC
Larry Bertholf at Holcomb called today saying that this point was running 22# of water at about 1,000 mmbtu/d flow rate. He has notified the contract pumper that it will …
-
14 Feb 2002
Gary Spraggins to controllers.dl-ets@enron.com
FW: Amarillo Weekly Report
-----Original Message----- From: Lebeau, Randy Sent: Thursday, February 14, 2002 10:52 AM To: Adamson, Alvin; Barbee, Roger; Beaver-Mach-Shop, Team; Beaver-Plant, Team; B…
-
14 Feb 2002
Gary Spraggins to controllers.dl-ets@enron.com
FW: Midland Weekly Report
-----Original Message----- From: Robinson, Adel Sent: Thursday, February 14, 2002 10:56 AM To: Allen, Steve; Anderson, Paul; Andrews Plains Team; Andrews Plainview Team; …
-
14 Feb 2002
Gary Spraggins to controllers.dl-ets@enron.com
FW: Liberal Region Weekly Report
-----Original Message----- From: Miller, Dave Sent: Thursday, February 14, 2002 2:12 PM To: Jerry Harkreader/ET&S/Enron@Enron; Lebeau, Randy; Lynch, Jim; Graham, Charlie;…
-
4 Feb 2002
Gary Spraggins to controllers.dl-ets@enron.com, team.beatrice-m&o@enron.com and 2 more
Trailblazer Outage Station. 6
Trailblazer will have an outage starting Tuesday, Feb. 5th. for 4 to 8 days. They are only going to schedule firm on their side during this time which is 522,000 mmbtu/d.…
-
4 Feb 2002
Gary Spraggins to controllers.dl-ets@enron.com
SOL -NNG
A SOL is in affect for ALL Market Area Zones for Sunday Feb.3rd. and Monday Feb. 4th. Gary
-
1 Feb 2002
Gary Spraggins to John Sturn and 6 more
Tekas Bradshaw
John Starting Feb. 1 the GPM Tekas Bradshaw volumes (15,000 mmbtu/d) have gone away. I understand that GPM is trying to reroute this gas to another plant. So at this poin…
-
30 Jan 2002
Gary Spraggins to controllers.dl-ets@enron.com and 4 more
USGT after hours gas flow
Since NNG is allocating storage you may get a call from USGT wanting to bring gas into NNG from Transok or Oasis going to TW. If they do they will get all parties on the …
-
29 Jan 2002
Gary Spraggins to controllers.dl-ets@enron.com, Team Canadian-North and 6 more
Hemphill Co. #3
I received a call from Randy Lebeau about hearing that Hemp. 3 volumes were going away Feb. 1st. I have since found out that it is true from Jerry knight with Oneok. They…
-
29 Jan 2002
Gary Spraggins to controllers.dl-ets@enron.com
FW: POI 269 Aquila Beckham Co. BTU
-----Original Message----- From: Benningfield, Robert Sent: Monday, January 28, 2002 5:47 PM To: Spraggins, Gary; Floyd, Jodie Cc: Adams, Jean; Benningfield, Robert; Forb…
-
28 Jan 2002
Gary Spraggins to controllers.dl-ets@enron.com
SOL ALL MARKET AREA ZONES- TUESDAY
SOL is in affect for ALL MARKET AREA ZONES for Tuesday, January 29th.