from:bruce.golden@enron.com means Bruce Golden (bruce.golden@enron.com).
-
9 May 2000
Bruce Golden to Benjamin Rogers
Re: wps
Ben Question 1 Case 1 at 20F and 60% RH CTG would have net unit output of 46,726 kW at a heat rate of 10,183 Btu/kWhr HHV new & clean Case 2 at 90F and 54% RH CTG would h…
-
4 May 2000
Plano vs Homestead
Ben This is a revised Plano we did late yesterday. It was adjusted from Lowell, Mass Nepco estimate and we changed format to more closely match Homestead form. Biggest di…
-
4 May 2000
Bruce Golden to Benjamin Rogers
Re: MHI 501G
Ben This sure sounds like a deal Len Gunderson was looking at early this year and a large chemical facility. The capacity for the project did not match what equipment it …
-
4 May 2000
Bruce Golden to Benjamin Rogers
Re: MHI 501G
Maybe the message is garbled but 4 7FA's and 2 STG's (probably two 2 X 1 CCGT's) should be nominally $470,000,000 based on the Pittsburg CCGT out in California (but inclu…
-
3 May 2000
MHI 501G
Ben Looks like a 2 X 1 MHI 501G plant would produce about 684MW plant net output at a heat rate of 6684 Btu/kWhr net new&clean. Still looking for capital cost. Bruce
-
26 Apr 2000
7FA Estimates
Ben Attached is a short form estimate I had on Pittsburg which is a 2 X 1 GE7FA plant. Also included is Linden 6 (which is a 7FA with an HRSG supplying steam to an existi…
-
24 Apr 2000
Heat Rates for absorption chillers
Ben Roughly speaking if you use absorption chilling, you would save (at max summer conditions) maybe 1.2 MW per LM or about 2.5% on capacity which would be nominally a 2.…
-
17 Apr 2000
-
17 Apr 2000
Homestead LM6000 CCGT
Ben Attached is nominal performance for 6 LM6000 and 75 MW STG at Homestead. I am getting about 8175 Btu/kWhr HHV net plant heat rate (does include GE/S&S margin) at abou…
-
11 Apr 2000
-
27 Mar 2000
-
8 Mar 2000
EPC Scope Document
---------------------- Forwarded by Bruce Golden/ENRON_DEVELOPMENT on 03/08/2000 12:06 PM --------------------------- Tim.Fagan@UAECorp.COM (Tim Fagan) on 03/07/2000 02:3…
-
1 Mar 2000
Bruce Golden to Reed.Wills@UAECorp.COM (Reed Wills)
Re: LM6000 - Summary of 2/28/00 Discussion with Enron
Reed First of our stuff coming to you. Following attachment is chilling calc for Ft Devens - which was the nearest site we thought might be representative of Lowell. I wi…
-
15 Feb 2000
Bruce Golden to Benjamin Rogers and 2 more
Re:
assumptions based on following with Bruce's notes Development of 1 LM 6000 facility in a urban area for the purposes of supplying the rapid load growth. ENA will contribu…
-
9 Feb 2000
EPC Draw Schedule
To all rough pass at EPC draw schedule in attached Excel for 2,3,4,5 and 6 unit plants - assumes two week spacing on start up - based on normal simple cycle deal. If we n…
-
8 Feb 2000
Bruce Golden to Tracee Bersani
Re: Request for 7FA estimate
Tracee Best data we have for a 7FA simple cycle is the East Coast Power Linden #7 that NEPCO did. EPC cost for single unit was $63,000,000 based on a $34,000,000 7FA cost…
-
8 Feb 2000
Bruce Golden to Benjamin Rogers
Re:
Why??? Not trying to be difficult but really these conceptual numbers should have very limited distribution and use - I will call Scot and see how he can use them. Bruce
-
17 Dec 1999
Bruce Golden to Don Black and 4 more
Delmarva Power Project Due Diligence
Ben/Don Attached is an Excel spreadsheet with a tasking letter, summary estimate of resources/cost, table of contents of deliverable package and the last is a sequence of…