to:arnie.bailey@enron.com means Arnie Bailey (arnie.bailey@enron.com).
-
15 May 2001
Peter R. Stark to Max Brown, John Keller, Morgan Gottsponer and 13 more
RE: Rough Estimate of Costs For Possible TW MAOP Upgrade - 30" Mainline & Loop Lines Sta 5 to Colorado River
Max, As an alternative to replacing pipe can we consider applying Armour Plate wrap? Peter. Eur Ing Peter R. Stark CEng BSc, BA, MSc, MIM, SenMWeldI, MIMarE. MICorr. Tel:…
-
7 May 2001
Max Brown to John Keller, Morgan Gottsponer, Kevin Hyatt and 13 more
Rough Estimate of Costs For Possible TW MAOP Upgrade - 30" Mainline & Loop Lines Sta 5 to Colorado River
As I will be out of town at Gallup NM this week for the excavations planned for TW L-154 line, I will will miss the the meeting on the 10th. I have begun preparation of a…
-
10 Apr 2001
Mansoor Abdmoulaie to Kevin Hyatt and 8 more
TW/ Agave---Atoka-3 capacity
This is in response to our meeting of April-10-2001 in Midland with Agave. Assuming units #761 and #762 are now assigned to LEC-10" service, the below schematic is showin…
-
4 Apr 2001
Eric Faucheaux to Lorraine Lindberg, Bob Burleson and 18 more
EPFS Cost Estimate
With reference to our meeting that we had on Monday morning (4/2) regarding competing suppliers for capacity on the Crawford Lateral (Duke and EPFS), Planning has determi…
-
13 Mar 2001
Michelle Lokay to Earl Chanley and 12 more
RE: Pogo Interconnect
After many conversations with John Havard at Pogo, it was decided that we will not continue with the Transwestern interconnect in the Pronghorn area. The drilling results…
-
8 Mar 2001
Lorraine Lindberg to Perry Frazier and 18 more
RE: EPFS interconnect
I need as close to the exact cost for both 65,000 and 90,000 MMBtu/d as we can get. EPFS is going to pay for this and I don't want ETS to fund anything so it's important …
-
8 Mar 2001
Perry Frazier to Lorraine Lindberg and 18 more
RE: EPFS interconnect
Let me know if you need a level A or level B, in my book a level B is a "good to go" estimate. The prior scope of 60 MMBtu/d was the max. the tap could handle, any thing …
-
7 Mar 2001
Lorraine Lindberg to Perry Frazier, Arnie Bailey and 16 more
RE: EPFS interconnect
I just got off the phone with El Paso Field Services. At this time, I now need 2 cost estimates. One to increase the facilities to be able to handle up to 65,000 MMBtu/d …
-
6 Mar 2001
Mike McCracken to Kevin Hyatt, Michelle Lokay, Jeffery Fawcett and 34 more
Marketing Roundtable Notes
All Thank you very much for the great attendance and participation! Thanks, also, to all those who had to juggle this meeting with others. Attached are the notes from the…
-
23 Feb 2001
Rich Jolly to Mike McCracken and 12 more
Re: Agave & Atoka System
Mike thanks for the information and you're correct in stating that marketing would have to look this over. I'm sure they will want a full scope of work. With your and Ear…
-
20 Feb 2001
Mike McCracken to Kevin Hyatt, Michelle Lokay, TK Lohman and 30 more
Marketing Roundtable Meeting
All, The agenda for next Monday's meeting is attached. The meeting will be held in the 6th floor lunchroom at 3 Allen Center. See everyone there, Mike McCracken 505-625-8…
-
20 Feb 2001
Mike McCracken to Kevin Hyatt, Michelle Lokay, TK Lohman and 30 more
Marketing Roundtable Meeting
All, The agenda for next Monday's meeting is attached. The meeting will be held in the 6th floor lunchroom at 3 Allen Center. See everyone there, Mike McCracken 505-625-8…
-
31 Jan 2001
Michelle Lokay to Earl Chanley and 12 more
Re: Pogo Interconnect
Just to summarize and bring everyone up to speed...I spoke to John Havard with Pogo again. He would like us to continue with drawings, engineering, etc. using his prepaym…
-
31 Jan 2001
Michelle Lokay to Earl Chanley and 12 more
Re: Pogo Interconnect
Just to summarize and bring everyone up to speed...I spoke to John Havard with Pogo again. He would like us to continue with drawings, engineering, etc. using his prepaym…
-
29 Jan 2001
Rich Jolly to John Keller, Randy Rice, Gary Maestas and 2 more
FW: Atoka Equipment Enhancement Analysis by ACTT - ACTT Quote 089100077
John I have a quote from Randy on looking at our Atoka system in Artesia, New Mexico. At this time we'removng 160 mmbtu but I believe there's an opportunity to do better.…
-
14 Nov 2000
Mike McCracken to Earl Chanley and 16 more
Re: EOG Pronghorn Location
I talked to the Carlsbad team yesterday, they are planning to relocate the equipment beginning today. Possible we will utilize space on EOG's antenna tower for solar pane…
-
13 Nov 2000
Earl Chanley to Bob Burleson and 16 more
Re: EOG Pronghorn Location
To aggressive. Will get to I/C when people are avib. Wil try but only can do so much Earl Chanley
-
13 Nov 2000
Bob Burleson to Mike McCracken and 14 more
Re: EOG Pronghorn Location
Mike, Boy, the more things change, the more they stay the same.... You are correct that EOG does not give us the OK to "go ahead". EOG has agreed to wire funds to TW toda…
-
13 Nov 2000
Mike McCracken to Bob Burleson and 14 more
Re: EOG Pronghorn Location
Bob Dirk Ellison with EOG has contacted me twice this morning about the EFM at the location. He told me they planned to come on Tuesday evening. I have told him both time…
-
3 Oct 2000
Timothy Jones to Larry Campbell and 4 more
Re: Environmental Assessment invoice for OPS Risk Based Pipeline Study
Larry, Coding String as Follows: GL Company: 0060 GL Account: 52507500 WBS Element: X.000564.113285300035 Material No: 9000100 Any questions/concerns, call me. tj
-
2 Oct 2000
Mike Riedel to Randy Rice, Dave Odneal, ken.earl@enron.com and 32 more
Environmental Services
Gentlemen, With the company moving forward as Enron Transportation Services and the Southwest Operations Area in place. The Southwest Environmental Team wants to let you …
-
28 Sep 2000
Ronald Matthews to Mansoor Abdmoulaie, mark.adelmann@enron.com, Stephen Allen and 90 more
Weekly Report - Sept. 25-29, 2000
Optimization/ Facility Planning Team Weekly Report Week of September 25 - 29, 2000 ET&S Outages (Outages: Jerry Graves 713/345-8923) System Optimization Team (Team Leader…
-
22 Aug 2000
Lisa Costello to jerome.hickl@enron.com, kenneth.l.kimbro@enron.com, gary.carroll@enron.com and 301 more
Memo to GPG Management -- Leadership Development
Please see the attached memo from Roger Sumlin.
-
13 Mar 2000
Larry Campbell to steve.sanmiguel@enron.com and 36 more
Re: Request
Steve, you have been given all the written permit history and portable analyzer correspondance from myself to and from the State of New Mexico. All of my air permit files…
-
7 Mar 2000
Larry Campbell to team.big-lake@enron.com, Team Eunice-Kermit, team.monahans@enron.com and 13 more
Natrual Gas Release Reporting Requirements for Texas
As a reminder, the state of Texas requires releases of natural gas greater than 119 mscf to the atmosphere (in a 24 hour period), to be reported to the Regional Offices o…