30 Jul 2001
Darrell Schoolcraft to David Roensch, Jerry Graves and 14 more
RE: TW Outages 2002
I will be here Tuesday only this week. Tuesday works for me. ds
-
23 Jul 2001
Mansoor Abdmoulaie to Kimberly Watson and 8 more
WT-2 capacity
Planning has conducted flow studies to determine the capacity of WT-2 system with respect to receiving volume from NNG at Halley interconnect. The limiting factors in det…
-
19 Jul 2001
Ronald Matthews to James Centilli, Morgan Gottsponer, Eric Faucheaux and 4 more
Sun Devil Pipeline Project
Attached is the latest summary of the Sun Devil options. New scenarios reflect not replacing existing pipe but loop and add compression. The scenarios include mainline op…
-
18 Jul 2001
Ronald Matthews to James Centilli, Kevin Hyatt and 4 more
Sun Devil Project
Okay guys!! What's going on with the emails. I just corrected the Excel file and the old one showed up again per James. If it doesn't work this time, I'll hand work copie…
-
12 Jul 2001
Josie Call to Nancy Bagot, Mike Barry, vicki.berg@enron.com and 100 more
Certificate Status Report
Please see attached.
-
11 Jul 2001
Rich Jolly to Arnie Bailey, Rick Smith, David Roensch and 89 more
San Juan Team Advisor
Effective July 2nd David (Tiny) Roensch) accepted the responsibilities of being the Advisor for the San Juan Team. He will be the Advisor for the Kingman, Flagstaff and S…
-
6 Jul 2001
Kevin Hyatt to Eric Faucheaux, gale.ramsaran@enron.com and 4 more
RE: Citizens Flagstaff Interconnect / EES generation
I have reviewed the interconnect (K#7033) and transport agreements (K#20822) with Citizens Utility. Under the interconnect agreement, Citizens has to be able to take a mi…
-
29 Jun 2001
Darrell Schoolcraft to Morgan Gottsponer, Eric Faucheaux, Kimberly Watson and 1 more
RE: P-3 and Halley
I'm free at 2:00 today. Let me know ds
-
27 Jun 2001
Darrell Schoolcraft to Connie Hook, TK Lohman, Eric Faucheaux and 1 more
RE: Firm Transport @ Halley
I had to wait to get back to you this morning, sorry I will not be able to be there. I need to leave at 2:00 pm today to take my daughter to the dentist.
-
19 Jun 2001
Darrell Schoolcraft to Gary Maestas, Gary Choquette, Steven January and 5 more
RE: TW 1090 Effort
Gary Spraggins, Steve January or myself will not be able to participate on the call. We have a presentation to give to Stan Horton from 9:00 to 11:00. DS and GS
-
18 Jun 2001
Omaha Helpdesk to adam.dushinske@enron.com, albert.hernandez@enron.com, Alice Johnson and 273 more
ETS - Omaha Organizational Accouncement
From the desk of Chuck Wilkinson: I am pleased to announce that Tom Halpin has accepted the position of Account Director for the North Power and Business Development Depa…
-
7 Jun 2001
Phil Lowry to Stanley Horton, Danny McCarty, Steven Harris and 22 more
Project Red Rock Update and Alternatives
Per discussions with Steve Harris we have re-estimated volumes and costs for a smaller version of Project Red Rock. We have studied two scenarios and the results are as f…
-
18 May 2001
Mansoor Abdmoulaie to Michelle Lokay and 6 more
New Supply Opportunity
Michelle I have checked the location of the Wizard#1 well. According to the legal description, the well is located approximately 6 miles north of WT-1. I have listened to…
-
15 May 2001
Perry Frazier to Mansoor Abdmoulaie, Lorraine Lindberg, Morgan Gottsponer and 4 more
RE: WT-1 to Sta-9 Capacity
Thanks for verifying the flow conditions out of WT-1, it appears we might have 35 mmcfd extra capacity above the 550 mmcfd WT-1 discharge capacity, using your assumptions…
-
10 May 2001
Ray Smith to Jerry D. Martin and 34 more
Red Rock Weekly Report
1. ACTIVITIES: a. Successful visit to Nuovo Pignone in Italy this week by a team consisting of representatives from E&C, GE and the engineering contractor, UEI. Most of t…
-
10 May 2001
Mansoor Abdmoulaie to Kevin Hyatt and 4 more
Cost Estimate for MAOP facility requirements
Kevin I have completed the following costs for the MAOP facility requirements project but have not completed yet the cost of 55,90 and 115 mmcf/d alternatives on the San …
-
8 May 2001
Omaha Helpdesk to adam.dushinske@enron.com, albert.hernandez@enron.com, Alice Johnson and 616 more
Organization Announcement
Organization Announcement from Steve Harris: Effective immediately, Kevin Hyatt, Director of the Transwestern Commercial Group, will be joining Eric Gadd of the Asset Dev…
-
8 May 2001
Omaha Helpdesk to allen.cohrs@enron.com, andrea.woody@enron.com, andrew.williams@enron.com and 446 more
Organization Announcement
From the desk of Susan Neville I am very pleased to announce that effective May 16, Steve Thomas will transfer to Storage Services as Storage Capacity Manager reporting t…
-
1 May 2001
Jeffery Fawcett to Kirk Ketcherside and 14 more
Big Sandy Project pressure information
Kirk, This is really dangerous... having a marketing guy talk to you about engineering matters. However, since we've recently worked with our other power plants to get th…
-
26 Apr 2001
Jeffery Fawcett to Danny McCarty, Steven Harris, Kevin Hyatt and 12 more
Enron - Kinder Morgan Hueco Pipeline Project
Rod Hayslett and I met with Kinder Morgan on 4/25 to discuss the possible commercial structures under which Enron and Kinder could jointly develop, construct and operate …
-
22 Apr 2001
Arnold Eisenstein to Jerry D. Martin and 32 more
Red Rock Weekly Report
1. ACTIVITIES: a. Video conference held with GE/NP to refine turbine SOW b. Marketing held a "bid" last week ending on Friday; results are encourging as multible bids wer…
-
19 Apr 2001
Stanley Horton to Phil Lowry and 12 more
Re: TW Mainline Capacity & Station 8
I agree. There have been way too many surprises from this group lately.
-
18 Apr 2001
Lindy Donoho to Jeffery Fawcett and 16 more
RE: Ameramex - Bloomfield Energy Farm Project - Trigon-Sheehan Information Request
Will this interconnect actually be with the jointly-owned Blanco Hub facilities (or just in the area of the Blanco Hub)? If we are connecting with the Blanco Hub, we need…
-
16 Apr 2001
Stu Asselin" @ENRON to Jeffery Fawcett and 18 more
RE: Ameramex - Bloomfield Energy Farm Project - Trigon-Sheehan Information Request
Thanks Jeff - we would definitely like to meet with your team or representatives on site as soon as possible. I'd like to put you in touch with Brett Hurlbut, our Senior …
-
6 Apr 2001
Arnold Eisenstein to d.martin@enron.com and 32 more
Red Rock Weekly Report
1. ACTIVITIES: a. FERC Certificate is filed. No questions have been received to date. b Turbine Compressor Letter of Intent was issued to GE/NP for 4 PGT25+ for the Red R…