from:larry.campbell@enron.com means Larry Campbell (larry.campbell@enron.com).
to:rich.jolly@enron.com means Rich Jolly (rich.jolly@enron.com).
-
5 May 2000
Larry Campbell to George Robinson, Team Laguna and 4 more
Re: Sta. 6 UST Excavation
George/Norm because there is no immediate concern or liability with the partially filled excavation, I want us wait for the official letter from the tribe before taking i…
-
3 May 2000
Larry Campbell to Team San-Juan-LaPlata and 6 more
Emission Factors for Permit No. 97LP0653
Larry, as per our conversation, presented below are the emissions factors provided by the state of Colorado for the T-7000 Centaur under permit 97LP0653 : PM10 14.000/MMS…
-
25 Apr 2000
Newspaper story in The Monohans News
Rich, this is the public notice for the groundwater remediation at the TW North Crawar facility. Because we are emitting emissions to the air from the contamination in th…
-
28 Mar 2000
Larry Campbell to Michel Nelson and 14 more
Re: Ralph Komai, Training Presentation
Mike, I spoke to Ralph and he gave me an open week of April 17th in San Francisco. He thought that one day would be more that adequate. I need to have somebody contact th…
-
15 Mar 2000
Larry Campbell to Rick Craig, Michel Nelson, Michael Terraso and 8 more
PG&E/Southwest Gas Meeting
On tuesday of this week, Lou Soldano and I attended a meeting between the above referenced parties concerning the issue of PCB's which had migrated into the PG&E system. …
-
13 Mar 2000
Larry Campbell to steve.sanmiguel@enron.com and 36 more
Re: Request
Steve, you have been given all the written permit history and portable analyzer correspondance from myself to and from the State of New Mexico. All of my air permit files…
-
7 Mar 2000
Larry Campbell to team.big-lake@enron.com, Team Eunice-Kermit, team.monahans@enron.com and 13 more
Natrual Gas Release Reporting Requirements for Texas
As a reminder, the state of Texas requires releases of natural gas greater than 119 mscf to the atmosphere (in a 24 hour period), to be reported to the Regional Offices o…
-
6 Mar 2000
Larry Campbell to Michael Adewumi and 10 more
Re: Penn State meetings
Michael, our liquids data collections have been pretty lean. Its only been in the last couple of months where we have actually collected any arsenic data. I will send to …
-
3 Feb 2000
Larry Campbell to Bret Reich and 12 more
Transwestern's Facilities List
Bret, per ;you request, presented below is a list of Priority 1 and 2 sites in Arizona, New Mexico, Colorado and Texas for which we have running horsepower and emit emiss…
-
2 Feb 2000
Larry Campbell to team.artesia@enron.com, team.monahans@enron.com, Team San-Juan and 8 more
Nitrogen and Sulfur reporting and Recordkeeping for Turbines
For those teams that have turbines installed after 1990 and/or for those turbines which have undergone power unit changouts, the following recordkeeping and monitoring co…
-
26 Jan 2000
Larry Campbell to team.artesia@enron.com, steve.sanmiguel@enron.com and 6 more
Maintenance Activities at Atoka No. 3 C/S
I think its time that we did a maintenace spot check on the White units at the above referenced facility, to stay in line with the operating conditions of the facility pe…
-
18 Nov 1999
Larry Campbell to Michael Terraso, Rick Cates, William Kendrick and 6 more
Results of the Environmental Meeting at C/S 6, Laguna
A meeting was held at C/S 6, Laguna on Tuesday November 16th, to reintroduce the pueblo of Laguna to Transwestern's environmental activities at the facility. The Laguna's…
-
12 Nov 1999
Larry Campbell to Michael Terraso, Rich Jolly, Louis Soldano and 9 more
Conference Cal with Adewumi
This is just a short update on the conference call just completed with Michael Adewumi of Penn State, concerning the PCB pipeline modeling project proposed for the Transw…
-
10 Nov 1999
Larry Campbell to William Kendrick and 8 more
Re: LaPlata
Bill, we had an air inspection at the facility a couple of weeks ago and all went well. Prior to the state visit, we went through a "trouble shooting" scenario and found …
-
4 Oct 1999
Larry Campbell to Rich Jolly and 14 more
Re: Penn State Visit
Rich, whats your thoughts on a decent pipeline segment for the modeling study. I kind of like Sta. 4 to Sta. 3. It encompasses alot of the variablity present on the Trans…
-
27 Aug 1999
Larry Campbell to Earl Chanley, William Kendrick, Rich Jolly and 6 more
PG&E PCB Meeting with John Woodyard
In light of the recent PCB issue with PG&E on the Topock Lateral, I have asked Mr. John Woodyard of Roy F. Westin to c ome to Houston and make a presentation on PCB's in …
-
10 Aug 1999
Larry Campbell to David Roensch and 12 more
Re: PG&E
The environmental clearances are still in effect as long as we stay on our right of way and in our measuring station yard. For any construction work at the PG&E station, …
-
23 Jul 1999
Larry Campbell to Michel Nelson, Rich Jolly, David Roensch and 11 more
Recent PCB Results, Topock Lateral
A 2:00 pm central time conference call has been scheduled to discuss the most recent analytical results from the Topock Lateral PCB sampling. Your attendence is requested…
-
23 Jul 1999
Larry Campbell to Michel Nelson, David Roensch, Rich Jolly and 9 more
Recent PCB Analytical Results, Topock Lateral
A 2:00 pm central time conference call has been scheduled to discuss the most recent PCB analytical results for the Topock Lateral. Your attendance is requested. The dial…
-
15 Jul 1999
Larry Campbell to team.monahans@enron.com and 10 more
Groundwater Monitoring to be Discontinued at the Puckett Plant
Approval was received from the Texas Railroad Commission to discontinue groundwater monitoring at the Pucket Plant. As you may remember, Transwestern constructed a permit…
-
22 Jun 1999
Larry Campbell to Team San-Juan-LaPlata and 4 more
Fuel Consumption, La Plata A
Guys, I received Harrell's memo concerning the fuel use for the turbine and the fact that you had to reduce gas producer speeds to comply with the permits fuel use requir…
-
11 Jun 1999
Larry Campbell to Rich Jolly, Michel Nelson, David Roensch and 8 more
Cleaning Postponement of the pipeline between TW PG&E M/S and the Topock C/S
Based upon valving constraints and the innaccessability to the inside of the pipe between our M/S and the Topock C/S, a decision has been made to postpone cleaning of his…
-
2 Jun 1999
Larry Campbell to Louis Soldano, Rich Jolly, David Roensch and 8 more
Additonal Information Concerning PG&E
On a related note, I spoke to Vector concerning the equipment which was suggested for cleaning on the PG&E system. It is as follows: 2 scrubbers, some underground C/S pip…
-
5 May 1999
Larry Campbell to Michel Nelson, Rich Jolly, Louis Soldano and 9 more
Results of the PG&E Filter Separator Cleaning
Just a short message to apprise everyone of the cleaning results performed on the filter separator from the Transwestern M/S. Wipe tests taken of the interrior portions o…