  1. 25 Aug 1999

    George Robinson to William Kendrick and 6 more

    Roswell Station - Phase V Soil and Groundwater Assessment Plan

    Bill Olson (OCD) has issued a letter, dated 8/19/99, approving TW's modified Groundwater Monitoring Plan and proposed Phase V Soil and Groundwater Assessment Plan. The mo…

  2. 19 Aug 1999
  3. 10 Aug 1999

    Larry Campbell to David Roensch and 12 more

    Re: PG&E

    The environmental clearances are still in effect as long as we stay on our right of way and in our measuring station yard. For any construction work at the PG&E station, …

  4. 9 Aug 1999

    Laura Glenn to Michael Terraso, William Kendrick, joe.kolb@enron.com and 25 more

    Environmental Notices

    Attached are Environmental Notices regarding two new EPA regulations for glycol dehydrators. One is for dehys on the pipeline from the well to the gas processing plant (O…

  5. 23 Jul 1999

    Larry Campbell to Michel Nelson, Rich Jolly, David Roensch and 11 more

    Recent PCB Results, Topock Lateral

    A 2:00 pm central time conference call has been scheduled to discuss the most recent analytical results from the Topock Lateral PCB sampling. Your attendence is requested…

  6. 23 Jul 1999

    Larry Campbell to Michel Nelson, David Roensch, Rich Jolly and 9 more

    Recent PCB Analytical Results, Topock Lateral

    A 2:00 pm central time conference call has been scheduled to discuss the most recent PCB analytical results for the Topock Lateral. Your attendance is requested. The dial…

  7. 10 Jul 1999

    Richard B Sanders to Eileen Kisluk and 8 more

    Re: Frazier

    I am OK (but reluctantly) with the settlement.

  8. 11 Jun 1999

    Larry Campbell to Rich Jolly, Michel Nelson, David Roensch and 8 more

    Cleaning Postponement of the pipeline between TW PG&E M/S and the Topock C/S

    Based upon valving constraints and the innaccessability to the inside of the pipe between our M/S and the Topock C/S, a decision has been made to postpone cleaning of his…

  9. 11 Jun 1999

    Robert C Iversen AT ENRON_DEVELOPMENT@CCMAIL to Rich Jolly and 8 more

    Topock diesel pigging strategy

    After the Topock line has been cleaned and placed back in service, I recommend immediate flushing with diesel. The existing Selexol tank and injection system can be used …

  10. 4 Jun 1999
  11. 2 Jun 1999

    Larry Campbell to Louis Soldano, Rich Jolly, David Roensch and 8 more

    Additonal Information Concerning PG&E

    On a related note, I spoke to Vector concerning the equipment which was suggested for cleaning on the PG&E system. It is as follows: 2 scrubbers, some underground C/S pip…

  12. 2 Jun 1999

    Michel Nelson to Larry Campbell and 16 more

    Re: Issues Pertaining to Meeting with PG&E

    I don't know what the cost is, but it may be a good thing if it were flushed. Mike

  13. 5 May 1999

    Larry Campbell to Michel Nelson, Rich Jolly, Louis Soldano and 9 more

    Results of the PG&E Filter Separator Cleaning

    Just a short message to apprise everyone of the cleaning results performed on the filter separator from the Transwestern M/S. Wipe tests taken of the interrior portions o…

  14. 9 Apr 1999

    David Roensch to Rich Jolly and 18 more

    PG&E UPDATE

    Mike We completed the decontamination on both of the filter separators on the discharge of the Solexol Plant. There was a thin film of an oily substance (presumably Solex…

  15. 9 Apr 1999

    Rich Jolly

    PG&E UPDATE

    Mike We completed decontamination of the inlet filter at the selexol plant today. It was dirty but no liquid. There was some dried sludge in the bottom of the vessel and …

  16. 8 Apr 1999

    Team Kingman-Needles to Rich Jolly, Larry Campbell, Jeffery Fawcett and 3 more

    Needles PG&E Weekly Report

    Attached please see last weeks (4/1/99) sample run results. This weeks sample run will not take place on Thursday due to PG&E's request and will be performed on Friday th…

  17. 7 Apr 1999

    Jeffery Fawcett

    Status of issues re: PG&E Interconnect

    I spoke at length today with Rod Boschee at PG&E. The main focus of our discussion was logistics/planning for the upcoming 4/13/99 meeting between TW and PG&E representat…

  18. Undated

    Larry Campbell to John Shafer and 12 more

    RE: Red Rock Air Permits Heads up!

    From: John Shafer/ENRON@enronXgate on 09/16/2001 09:07 PM CDT To: Phil Lowry/ENRON@enronXgate, Jerry D Martin/ENRON@enronXgate cc: Louis Soldano/ENRON@enronXgate, William…