to:arnold.eisenstein@enron.com means Arnold L Eisenstein (arnold.eisenstein@enron.com).
-
9 Mar 2001
Larry Campbell to Terry Hackett and 6 more
Re: Station 2 Concerns
Terry, the entire facility has not been disturbed. Only most of it. Id say approx 70%. The other 30% has been impacted but not tot the point of disturbing all the vegetat…
-
8 Mar 2001
Larry Campbell to Byron Rance, Arnold L Eisenstein, Earl Chanley
emissions levels for the auxillary units 1-4
Byron as per the Red Rock expansion conference call today presented below are the emissions estimates for the auxillary engines at sta. 1-4. Understand these are not actu…
-
6 Mar 2001
Larry Campbell to Arnold L Eisenstein, Earl Chanley, Donna Martens and 8 more
Re: TRANSWESTERN RB211
Arnold, I think I will pass on the meeting. Please apprise me of anything I may need to know from the meeting. To bring you up to date on the environmental events of the …
-
3 Mar 2001
Donna Martens to Rich Jolly, Arnold L Eisenstein, David Roensch and 22 more
Red Rock Expansion
Please review attached redline draft and provide comments and the signed FERC approval form by 2 P.M. on Tuesday, March 6. Questions, let me know. Thanks. Donna
-
24 Feb 2001
Donna Martens to Rich Jolly, Arnold L Eisenstein, David Roensch and 24 more
Red Rock Expansion Filing
Attached is a draft copy of Transwestern's application requesting authorization to abandon the existing units at Stations 1, 2, 3 and 4 and install a 38,000 HP unit at ea…
-
23 Feb 2001
Ronald Matthews to Arnold L Eisenstein, Eric Faucheaux, Ben Asante and 6 more
Red Rock Expansion Project
The attached Excel spreadsheet has operating conditions for the various ranges requested by Engineering. Each station was shut down to show the impact and low flow condit…
-
21 Feb 2001
Larry Campbell to Arnold L Eisenstein, Earl Chanley, Donna Martens and 10 more
Arizona Mainline Expansion
This is a gentle reminder, and Im sure that most are aware, but under no circumstances is there to be any construction activiy initiated for the turbine installation at t…
-
21 Feb 2001
Larry Campbell to William Kendrick and 8 more
RE: TW Expansion Project
Bill, the baseline noise surveys, which have been completed, were performed by Hoover and Keith out of Houston, Tx. I have a meeting scheduled with the permit engineers f…
-
6 Feb 2001
Ben Asante to terry.galassini@enron.com and 40 more
Re: Transwestern Update Meeting
Atached is the updated expansion option summary sheet we will use at the 1:00 PM meeting. Ben Asante From: Terry Galassini 02/05/2001 04:26 PM Sent by: Candace Williams T…
-
31 Jan 2001
James Centilli to Steven Harris, Lorraine Lindberg, Kevin Hyatt and 16 more
TW Mainline Expansion
The attached files are the analysis of Option 1 and Option 2 for the TW Expansion. The analysis for Option 2 was not adjusted for the lost revenue, but the attached file …
-
22 Jan 2001
Rich Jolly to Eugene O'Gorman and 22 more
Re: Bakerfield alternative fuel project, Status
Eugene thanks for taking a look at this. For now let's put a hold on this project since we're looking at doing something else at the location. Bob Burleson has been asked…
-
13 Dec 2000
Sharon Solon to Maria Pavlou, Dorothy McCoppin, Kevin Hyatt and 16 more
Gallup Expansion
Another conference call is scheduled for tomorrow, Thursday, December 14th at 10:00 a.m. CST, to again discuss Gallup Expansion. Omaha participants, please meet in Rm 723…
-
12 Dec 2000
David Roensch to Sharon Solon and 30 more
Re: Gallup Expansion
Unfortunately, I was traveling today and did not get this message until after the call took place..... Sharon Solon 12/12/2000 09:56 AM To: David Roensch/ET&S/Enron@ENRON…
-
12 Dec 2000
Donna Martens to Sharon Solon and 32 more
Re: Gallup Expansion
Attached is the listing of Exhibits and additional information required for the draft application we'll be discussing in the conference call. Omaha folks, meet in Bill's …
-
12 Dec 2000
Sharon Solon to David Roensch, Rich Jolly, Maria Pavlou and 15 more
Gallup Expansion
Following is the dial-in number and passcode for this conference call TODAY AT 1:00 P.M. CST. DIAL-IN NUMBER: 1-877-795-3687 PASSCODE: 485174
-
12 Dec 2000
Sharon Solon to David Roensch, Rich Jolly, Maria Pavlou and 15 more
Gallup Expansion
Donna Martens is scheduling a conference call today at 1:00 p.m. CST to discuss the above subject. The call is scheduled to last l hour. As soon as I have a dial-in numbe…
-
28 Nov 2000
Donna Martens to Earl Chanley, james.moore@enron.com, Mike McCracken and 12 more
Regulatory Matrix -Gallup Expansion
Attached is a revised regulatory matrix for the Gallup Expansion reflecting Transwestern's request for a waiver of the 6 month requirement and a request for an extension …
-
27 Nov 2000
Jerry D Martin to Phil Lowry, Rod Hayslett, Michael Moran and 2 more
Trailblazer slides attached
Phil, Rod & Mike -- please find attached a set of slides which will look very familiar to you. They are the same format as the GTB slides we recently discussed, but are f…
-
24 Jul 2000
Chris Bailey to Tom Gilbert and 14 more
Hubbard A-B drive
Attached is a short report on the findings during the drive component test at Cambridge, Can on the 22nd of July. Witnessed by Chris Bailey, and Dale Korver. Will set up …
-
28 Jun 2000
Katherine Crosswhite to Mark Courtney, Carol Carter, Norm Spalding and 16 more
Hubbard Conference Call
A conference call has been scheduled for Friday, June 30th from 9:00am - 10:00am (Central time) and 10:00am - 11:00am (Eastern time). The dial in number is referenced bel…
-
19 Jun 2000
Drew Fossum to Stephen Thome and 14 more
Re: Pueblo
Thanks for the extremely helpful analysis Steve and John. I'm getting a pretty clear sense that this project isn't going anywhere as it is currently configured. Just to s…
-
7 Jun 2000
Lee Wright to Margaret Daffin, katy.dahlman@enron.com, Pamela Daily and 490 more
Body Shop Pillar Construction Starts - June 10th
Body Shop Members: On Saturday, June 10th, portions of the Body Shop will be closed for approximately 90 days to build the pillar supports for the Enron Center Sky Bridge…
-
24 Mar 2000
Gerald Nemec to Arnold L Eisenstein
Re: Equipment list for Gallup Power Train
Thanks, That does the trick.
-
20 Mar 2000
Gerald Nemec to david.bargainer@enron.com and 4 more
Gallup Construction
Got the redline to work. Attached is the redlined version of the construction agreement.
-
20 Mar 2000
Gerald Nemec to david.bargainer@enron.com and 4 more
Construction Gallup
David, Attached is the agreement with the revisions we discussed. Please review. I tried to redline againt the previous version, but any section that I modified displayed…