23 Feb 2001, 14:30 UTC
Red Rock Expansion Project
- From
- Ronald Matthews ronald.matthews@enron.com
- Date
- Fri, 23 Feb 2001 06:30:13 -0800 (PST)
The attached Excel spreadsheet has operating conditions for the various ranges requested by Engineering. Each station was shut down to show the impact and low flow conditions simulated to determine required horsepower. Note that the discharge temperatures shown in the spreadsheet indicate calculated temperatures before gas cooling. If you have an questions, please call.