  1. 16 Jan 2002

    Ron Matthews to Steven Harris, Kimberly Watson, Lorraine Lindberg and 7 more

    San Juan Expansion Options - Small Volume

    Marketing requested Planning to review any and all possibilities to achieve small volume expansions through the San Juan lateral. Several facility scenarios were investig…

  2. 11 Jan 2002

    Ron Matthews to Darrell Schoolcraft and 14 more

    Station #4 Overhaul Outage

    Planning and System Optimization have agreed that the effected throughput during the Station #4 overhaul outage should be 150 MMcf/d. This should be posted and the firm t…

  3. 11 Jan 2002

    Ron Matthews to Kimberly Watson

    RE: Attachment A - Payment Schedule

    For what it's worth, it looks okay to me. Ron Matthews

  4. 11 Jan 2002

    Ron Matthews to Darrell Schoolcraft

    FW: ETS Optimization - Weekly Report (10 Jan)

    Steve January got a copy but check out La Plata comments. An outage during tariff months??? Ron Matthews

  5. 7 Jan 2002

    Ron Matthews to marcello.minotti@enron.com, Arnold L. Eisenstein, Doug Cebryk and 2 more

    Sun Devil Design Conditions

    Sorry I left the above out of the first email. Attached is the latest and greatest taken from Winflow. There is a possibility of elimianting Bloomfield unit #5 but don't …

  6. 7 Jan 2002

    Ron Matthews to Doug Cebryk, Arnold L. Eisenstein, Dennis Alters and 3 more

    Sun Devil Alterative - Revision #10

    Attached is a revised scope which basically includes the majority of the expansion volume to Phoenix. Only 30 MMcf/d goes west of Station #2 while 500 MMcf/d goes to Phoe…

  7. 13 Dec 2001
  8. 12 Dec 2001

    Ron Matthews to Michelle Lokay, Darrell Schoolcraft, Kimberly Watson and 4 more

    Burlington Study - El Paso WIndow Rock I/C

    This is a revised spreadsheet from the one yesterday. Changes made were a result of discussions with Darrell. Still need to stick to our guns and NOT give Burlington any …

  9. 11 Dec 2001

    Ron Matthews to Kimberly Watson, Michelle Lokay, Darrell Schoolcraft

    El Paso/Burlington Window Rock Study Results

    Attached is an Excel spreadsheet showing facilities and costs for 24" from Window Rock to Station #4 suction. Ron Matthews

  10. 26 Nov 2001

    Ron Matthews to Kimberly Watson, Mansoor Abdmoulaie

    Questar - Blanco Hub Schematic

    Attached is a schematic showing the proposed location of the Questar Southern Trails interconnect. Ron Matthews

  11. 15 Nov 2001

    Ron Matthews to Kimberly Watson, Mansoor Abdmoulaie and 2 more

    Questar Southern Trails Interconnect - San Juan Co., NM

    The legal description for the proposed Southern Trails interconnect north of the Blanco Hub is Sec. 13, T29N, R11W, San Juan County, NM. This is on the old NWPL receipt l…

  12. 13 Nov 2001

    Ron Matthews to James Centilli, Kevin Hyatt, Morgan Gottsponer and 2 more

    Sun Devil Project - Fuel Study

    Attached is an Excel spreadsheet comparing fuel used between Red Rock and propose Sun Devil projects. The Phoenix delivery of 500 MMcf/d is locked and the Cal. border del…

  13. 8 Nov 2001

    Ron Matthews to Kevin Hyatt, Ben Asante

    RE: Sun Devil delivery pressure

    Kevin, That is the scenario where we installed all 36" pipe and added two new stations (Station #1.5 & Kingman). The pressure to Panda will be greater than 600 psig. The …

  14. 26 Oct 2001

    Ron Matthews to Steven Harris, Kimberly Watson, Lorraine Lindberg and 12 more

    Mainline Expansion 250 & 300 MMcf/d Scenarios - Revised

    The attached reflect Marketing's request to have interest, overheads, and AFUDC split out for all line items. The revision also includes recent additional input by Engine…

  15. 25 Oct 2001

    Ron Matthews to Kimberly Watson

    RE: Big Sandy Delivery Point Construction and Operating Agreement - Revised

    Kim, I have a 9:00 a.m. meeting (1 hour) and 11:30 a.m. to 1:00 pm. After that I'm out until Monday. Ron M.

  16. 24 Oct 2001

    Ron Matthews to Lorraine Lindberg, Michelle Lokay, Kimberly Watson and 4 more

    Mainline Expansion Scenarios

    Attached are 250 and 300 MMcf/d cases to expand TW's mainline, Topock, and San Juan lateral. These are + 30% costs but still based on the latest E&C estimate for Sun Devi…

  17. 23 Oct 2001

    Ron Matthews to Madeleine Cardoso @ENRON and 4 more

    RE: REVIEW AND APPROVE RONALD MATTHEWS ITINERARY FOR 05 NOV. TRAVEL

    Arrangements okay with me. The others should respond ASAP directly to you. Thanks! Ron M.

  18. 23 Oct 2001

    Ron Matthews to Dennis Alters, Darrell Schoolcraft

    FW: REVIEW AND APPROVE RONALD MATTHEWS ITINERARY FOR 05 NOV. TRAVEL

    Let Madeleine know ASAP about the arrangements. We have a real cheap rate. Let's not lose it. I've talked to Rich J. and it's okay to start the PNM. meeting later. They w…

  19. 19 Oct 2001

    Ron Matthews to Dennis Alters, Darrell Schoolcraft and 2 more

    Albuquerque Cross Functional Meeting

    I made room reservations for the 3 of us on November 5 only at the Sheraton Uptown (505-881-0000). The rooms are not guaranteed past 6:00 pm. Our confirmation numbers are…

  20. 17 Oct 2001

    Ron Matthews to Darrell Schoolcraft

    FW: TW's West Texas Leg & NNG's Southend Strategy Meeting

    -----Original Message----- From: Robertson, Audrey Sent: Tuesday, October 09, 2001 2:35 PM To: McConnell, Mark; Watson, Kimberly; Gottsponer, Morgan; Abdmoulaie, Mansoor;…

  21. 5 Oct 2001

    Ron Matthews to Michelle Lokay, Dennis Alters, Morgan Gottsponer

    Topock Lateral Expansion - 300 MMcf/d

    Attached is a Level A ( + 30%) cost estimate prepared by Planning based on available information. If you have any questions, please call.

  22. 3 Oct 2001

    Ron Matthews to John R. Keller, Jerry D. Martin, Doug Cebryk and 6 more

    Sun Devil Cost Reconciliation

    Attached is a Powerpoint slide showing the differences between the Planning's Level and Engineering's Level A+. Planning's Level A was update to include the current proje…

  23. 26 Sep 2001

    Ron Matthews to Michelle Lokay, Dennis Alters

    Sun DEvil Expansion Project

    Attached is a spreadsheet showing capacities and costs by segments. The Phoenix lateral length has changed in scope and is a little longer. All of this will be included i…

  24. 26 Sep 2001

    Ron Matthews to Kimberly Watson and 2 more

    Big Sandy Cost Estimate Modified

    Attached is an Excel spreadsheet as before with an additional sheet totaling both the tie in and measurement.

  25. 25 Sep 2001

    Ron Matthews to Kimberly Watson, Dennis Alters, Morgan Gottsponer and 2 more

    Caithness Big Sandy Project

    Kim, The attached file contains a recap of the Timberline program results with a few mods. Basic information covers what Earl and I talked about today. Caithness engineer…