from:larry.campbell@enron.com means Larry Campbell (larry.campbell@enron.com).
to:david.roensch@enron.com means David Roensch (david.roensch@enron.com).
-
1 Jun 2000
Larry Campbell to Gallup-Sta4, Team, Team Gallup and 6 more
Title V Permit for C/S No. 4, Klagetoh
The Title V air permit for C/S No. 4 has been issued. There are some requirements and conditions under this permit that the team should be aware of and will be required t…
-
6 Mar 2000
Larry Campbell to Michael Adewumi and 10 more
Re: Penn State meetings
Michael, our liquids data collections have been pretty lean. Its only been in the last couple of months where we have actually collected any arsenic data. I will send to …
-
12 Nov 1999
Larry Campbell to Michael Terraso, Rich Jolly, Louis Soldano and 9 more
Conference Cal with Adewumi
This is just a short update on the conference call just completed with Michael Adewumi of Penn State, concerning the PCB pipeline modeling project proposed for the Transw…
-
5 Nov 1999
Larry Campbell to Michael Terraso, David Roensch, Louis Soldano and 4 more
Re: The Draft of the PCB Cleanup Proposal
Mike, I reveiwed the proposal by Adewumi and it is correct and fairly accurate, for the purposes of a historic account and and in as far as what was provided to him in th…
-
4 Oct 1999
Larry Campbell to Rich Jolly and 14 more
Re: Penn State Visit
Rich, whats your thoughts on a decent pipeline segment for the modeling study. I kind of like Sta. 4 to Sta. 3. It encompasses alot of the variablity present on the Trans…
-
27 Aug 1999
Larry Campbell to Earl Chanley, William Kendrick, Rich Jolly and 6 more
PG&E PCB Meeting with John Woodyard
In light of the recent PCB issue with PG&E on the Topock Lateral, I have asked Mr. John Woodyard of Roy F. Westin to c ome to Houston and make a presentation on PCB's in …
-
10 Aug 1999
Larry Campbell to David Roensch and 12 more
Re: PG&E
The environmental clearances are still in effect as long as we stay on our right of way and in our measuring station yard. For any construction work at the PG&E station, …
-
23 Jul 1999
Larry Campbell to Michel Nelson, Rich Jolly, David Roensch and 11 more
Recent PCB Results, Topock Lateral
A 2:00 pm central time conference call has been scheduled to discuss the most recent analytical results from the Topock Lateral PCB sampling. Your attendence is requested…
-
23 Jul 1999
Larry Campbell to Michel Nelson, David Roensch, Rich Jolly and 9 more
Recent PCB Analytical Results, Topock Lateral
A 2:00 pm central time conference call has been scheduled to discuss the most recent PCB analytical results for the Topock Lateral. Your attendance is requested. The dial…
-
11 Jun 1999
Larry Campbell to Rich Jolly, Michel Nelson, David Roensch and 8 more
Cleaning Postponement of the pipeline between TW PG&E M/S and the Topock C/S
Based upon valving constraints and the innaccessability to the inside of the pipe between our M/S and the Topock C/S, a decision has been made to postpone cleaning of his…
-
2 Jun 1999
Larry Campbell to Louis Soldano, Rich Jolly, David Roensch and 8 more
Additonal Information Concerning PG&E
On a related note, I spoke to Vector concerning the equipment which was suggested for cleaning on the PG&E system. It is as follows: 2 scrubbers, some underground C/S pip…
-
5 May 1999
Larry Campbell to Michel Nelson, Rich Jolly, Louis Soldano and 9 more
Results of the PG&E Filter Separator Cleaning
Just a short message to apprise everyone of the cleaning results performed on the filter separator from the Transwestern M/S. Wipe tests taken of the interrior portions o…