Enron email

Algorithmic Indexing

63 messages for from:caroline.emmert@enron.com

Newest Oldest

Matching messages by month
Skilling resigns
Q3 loss announced
Bankruptcy filing

from:caroline.emmert@enron.com means Caroline Emmert (caroline.emmert@enron.com).

  1. 10 May 2001

    Caroline Emmert to Murray P. O'Neil, Amy Fitzpatrick, Chris Stokley

    Suggested Reviewers

    FYI. Amy has the list and has noted them. TJ Butler Anna Docwra Donna Sheidun Virginia Thompson Les Rawson Bill Williams III John Malowney CME

  2. 9 May 2001

    Caroline Emmert to Chris Stokley and 4 more

    FW: Status of Actualizations - October Deviation Preliminaries and Finals, and 'Other' Finals

    I am on the very last piece of the actualization for October. TJ and I went through the code for the dollar match-up for the 407 and figured out why it was creating such …

  3. 4 May 2001

    Caroline Emmert to Chris H. Foster and 4 more

    RE:

    Chris, We will be happy to provide those details to Tom. Kit Blair of our Staff is working on creating those files right now, and we should have them out to Tom shortly. …

  4. 4 May 2001

    Caroline Emmert to Chris Stokley and 4 more

    FW: Status of Actualizations - October Deviation Preliminaries and Finals, and 'Other' Finals

    I spent several hours with TJ shadowing and we tested the 402 code while I examined results. As each error or incorrect result was noted, we went to the code and walked t…

  5. 3 May 2001

    Caroline Emmert to Chris Stokley and 4 more

    FW: Status of Actualizations - October Deviation Preliminaries and Finals, and 'Other' Finals

    Anna and I worked through the coding for 403 and she made some changes to the method for finding percent usage. I reran the tool and looked at the results and we still do…

  6. 2 May 2001

    Caroline Emmert to Chris Stokley, Donna Johnson

    Status of Actualizations - October Deviation Preliminaries and Finals, and 'Other' Finals

    Exception handling coding changes are nearly complete. TJ had to weave through the code for 402 all the way, as well as add 3 new function points: EPMI exceptions, ISO ex…

  7. 1 May 2001

    Caroline Emmert to Chris Stokley, Donna Johnson

    Status of Actualizations - October Deviation Preliminaries and 'Other' Finals

    Exception handling in 402 and 405 not coded properly. Tj working on enhancing the codes to handle them correctly, and anticipates being done with 402 by tomorrow afternoo…

  8. 30 Apr 2001

    Caroline Emmert to godfrey.hyde@enron.com and 10 more

    Revision - Snohomish Final Actualization - September 2000 ISO

    Godfrey, I have revised the Snohomish number, as we had a counter party called SNO that actually belongs to Snohomish. I am inserting a new table with the corrected amoun…

  9. 28 Apr 2001

    Caroline Emmert to Chris Stokley, johnson.donna@enron.com

    Status of Deviation Actualizations - October Preliminaries

    I have started the actualization process with 403 Load Deviation, and need to work closely with TJ on Monday to find out why the allocations don't match the variances. I …

  10. 28 Apr 2001

    Caroline Emmert to godfrey.hyde@enron.com and 10 more

    Final Actualization - September 2000 ISO

    Godfrey, The final actualizations for Preliminary and Final Settlements are available and can be found in the following Flash file: M:\Electric\CALISO ACTUALIZATION\Actua…

  11. 27 Apr 2001

    Caroline Emmert to volume_management_portland@enron.com

    Details for Changes to Settle15 and SettleSupplemental

    Details of Changes: The changes to SettleSupp were in the rate formula. The original formula said, :"=IF(AK4>0,Curves!i49,Curves!I42), which means that if the volume in A…

  12. 27 Apr 2001

    Caroline Emmert to volume_management_portland@enron.com

    Changes to Settle15 and SettleSupplemental

    There were changes on made on 4/24 to both Settle15 and SettleSupplemental related to the rate calc. The old versions have been copied off into the Backup directory with …

  13. 25 Apr 2001

    Caroline Emmert to Chris Stokley and 2 more

    Deviation Actualization Update

    I analyzed the results of last nights Settle15 run for Load Deviation and discovered that the change made did not solve the rate problem. I then analyzed all of the formu…

  14. 24 Apr 2001
  15. 24 Apr 2001

    Caroline Emmert to steve.lewis@ci.seattle.wa.us and 4 more

    Final Actualization for September

    Steve, Attached is our Final report for September detailing all charges and payments associated with your ISO transactions for September. Please feel free to call either …

  16. 20 Apr 2001

    Caroline.Emmert@enron.com to xiaoming.ding@razorfish.com and 2 more

    Re: Status of 4/19

    All, Clarification on new findings statements below: trading minute and trade interval are the same thing. So, -- If an exception occurs at trading minute level, the volu…

  17. 20 Apr 2001
  18. 19 Apr 2001

    Caroline Emmert to volume_management_portland@enron.com

    Change to SettleSupplemental

    Anna made a change to SettleSupplemental today to accurately reflect the sign convention for dollar amounts for Import Deviation. The tool was calculating payments where …

  19. 19 Apr 2001

    Caroline Emmert to Chris Stokley

    Question about Instructed/Uninstructed Energy Data Usage

    ---------------------- Forwarded by Caroline Emmert/HOU/ECT on 04/18/2001 04:13 PM --------------------------- Caroline Emmert 04/18/2001 03:56 PM To: kalmeida@caiso.com …

  20. 18 Apr 2001

    Caroline Emmert to steve.lewis@ci.seattle.wa.us and 2 more

    Actualization Details - Import Deviation

    Steve, Attached are the details of the results of our actualization, estimates compared to ISO actuals, for the Import Deviation assessed against SCL schedules in Septemb…

  21. 18 Apr 2001

    Caroline Emmert to Chris Stokley and 2 more

    Deviation Actualization Update 041701

    We have all but the last of the exceptions actualized for 405. TJ is writing code to take the customer search up to the day level and automatically allocate these records…

  22. 14 Apr 2001

    Caroline Emmert to Chris Stokley and 2 more

    Deviation Actualization Update

    Charge types 402, 403 and 404 have been fully re-allocated and are set to A. Finals for the regular stuff have been completed; incomplete actualization found for 9/5 and …

  23. 13 Apr 2001

    Caroline Emmert to Chris Stokley and 2 more

    Deviation Actualization Update

    We have transferred new allocations for Gen and Export Dev based on the changes to the formula that I gave to TJ. Tomorrow we will work on redoing Load Dev using the same…

  24. 12 Apr 2001

    Caroline Emmert to Chris Stokley

    Deviation Actualization Update

    TJ looking into the formulas, with Anna's assistance as best she can by telephone and IM. We had to dump the existing export deviation records and re-do the manuals that …

  25. 11 Apr 2001

    Caroline Emmert to Chris Stokley

    Deviation Actualization Update

    Continue to have difficulties matching up volumes for Import Deviation, caused by an internal database functionality problem. Have analyzed the Instructed/Uninstructed se…