from:cara.semperger@enron.com means Cara Semperger (cara.semperger@enron.com).
-
25 Jan 2001
Cara Semperger to Mary Hain and 8 more
Re: FERC and DOE 4th Quarter Reports
I have gotten these documents from Tim, Val, and now you. I have tried to get in touch with Linda Lawrence and Kelly Hutley, no answer from either of them. I don't unders…
-
23 Jan 2001
Cara Semperger to Linda L Lawrence and 4 more
RE: WSPP 4th Quarter 2000 Report
I am looking at my physical volume report, and have a couple questions about the totals If I take the total volume, and multiply that by the total hours, I get a total of…
-
19 Jan 2001
Cara Semperger to portland.shift@enron.com
EPE length at PV for LLH on 1/20
Due to CISO cuts, we have the following length at Palo he 1-6 4 mw he 23-24 10 mw This is lenth from EPE deal # 499974 Thanks, Cara
-
18 Jan 2001
Cara Semperger to portland.shift@enron.com and 8 more
Real Time Position manager for 1/18
Looking into why we were out, I find the following for the WSCC-S region. Pinnacle to West Wing is now balanced since the transmission is corrected Palo Verde is long and…
-
5 Jan 2001
Cara Semperger to portland.shift@enron.com and 6 more
El Paso E-tag Training January 9th
We have folks coming from El Paso Electric to learn OATI, and you are welcome to sit in on the training. This training will be much more slow paced and thourough than the…
-
5 Jan 2001
Cara Semperger to Lisa Gang, Tom Alonso, Mark Fischer and 2 more
Line Derate info will be on our Preschedule Calendar intranet site
Paste this into your browser window and then choose calendar to see it. P:\Scheduling\EnronWestSchedulingWebsite.html c
-
5 Jan 2001
Cara Semperger to Lisa Gang, Tom Alonso, Mark Fischer and 2 more
UPDATE: CHANGED!! Line Derate that will affect our WALC transmisison for 1/9 and 1/10
Chuck called back to tell us the maintenance for the 10th is now going to be done on the 23rd of Jan. So, the 10th we are back to full capacity, and we will go to zero on…
-
4 Jan 2001
Cara Semperger to portland.shift@enron.com and 2 more
A schedule that has to go real time for 1/5
BPA C#23851-BPA(T)SYS/SYS O#95363 HNF-BPA-EPMI-PACW This schedule was originally supposed to go on Pacw transmission, but late in the day they said they never agreed to t…
-
3 Jan 2001
Cara Semperger to portland.shift@enron.com and 2 more
Two MidC Schedules that are going real time for Jan 4
Two heavy load schedules had late afternoon difficulty, and will need to be implemented on real time for Jan 4th HLH. 10 mw - BPA C#23845-EPMI-PGET-PWX-BPA(T)SYS/BCB O#10…
-
2 Jan 2001
Cara Semperger to Duong Luu and 10 more
487392 showing up as Phys when it is a cross-desk
please Check that Deal_Schedule_yn flag to no on this. We need to fix the underlying bug when we get a chance. I think it is more related to the cross desk deals done wit…
-
22 Dec 2000
Cara Semperger to portland.shift@enron.com, Sean Crandall, Donald Robinson and 2 more
LOUISIANA PACIFIC RAMPING DOWN 12/23
Louisiana Pacific, Deal # 421598 is ramping down from 7 mw's to 2 mw's, leaving us 5 long PGE deal # 268656. The start of the ramp down is HE18 pst on 12/23, and will sta…
-
21 Dec 2000
Cara Semperger to portland.shift@enron.com, Kate Symes
Scheduling Intranet Site
Here is the address of our internal intranet site. P:\Scheduling\EnronWestSchedulingWebsite.html
-
20 Dec 2000
-
13 Dec 2000
Cara Semperger to portland.shift@enron.com and 6 more
ATTENTION!!! THERE IS LENGTH AT MONTANA SYSTEM BORDER TO SELL FOR 12/14
We are long 7 mw's from HE 12-HE24 on 12/14, this length is the usual Portland generation, their share at Colstrip. In our system it is shown as Montana System border. Th…
-
13 Dec 2000
Cara Semperger to portland.shift@enron.com, Donald Robinson, Lisa Gang and 18 more
Some new things to make your life easier
We now have a self-calculating cuts template. There are two, one located in P:/RealTime/Cuts_Worksheet and one located in P:/Scheduling/Cuts_Template. These are both writ…
-
12 Dec 2000
Cara Semperger to Kate Symes, Diana Scholtes
Smurfit Deals
I show now two Smurfit Deals, 403522 for 25 flat, at 54.65, and 246859.1 for 15 hlh, AND 25 hlh, and 246859 for 15 llh AND 25 llh. I have zeroed out the 25's from 246859 …
-
11 Dec 2000
We are 511 long for 12/12, and this is accurate
---------------------- Forwarded by Cara Semperger/PDX/ECT on 12/11/2000 04:51 PM --------------------------- Cara Semperger 12/11/2000 03:30 PM To: Portland Shift cc: Su…
-
11 Dec 2000
Cara Semperger to portland.shift@enron.com
We are 511 long for 12/12, and this is accurate
1. There is length at Montana System Border 2 mw HE 7-24. The Smurfit is ramping down, and we will be Long PGE. The deal # 477754. Enpower says Montana System,but it is r…
-
11 Dec 2000
Cara Semperger to portland.shift@enron.com and 8 more
Something new when we get cuts on our Benton, Grays, Richland, and Franklin Transmission
Please do not just change the volume of these transmission deals, the unused portion needs to be kept in scheduling, as MidC to MidC transmission. Please take a moment to…
-
8 Dec 2000
Re: December 8 is balanced now except for Real time changes
Come to me first, and I can help you sort it out from there. The only stuff that I have no clue about is the traders intra-book swaps. c Kate Symes 12/08/2000 11:15 AM To…
-
8 Dec 2000
December 8 is balanced now except for Real time changes
Thanks for the itemization, It just needed some work that I couldn't do last night at 9 pm. c
-
6 Dec 2000
Cara Semperger to portland.shift@enron.com and 2 more
PreSchedule going real time for 12/7 !!! Please call in to our counterparties
There is a 13 MW LLH schedule That was changed at 3:30 and due to its lateness, has to go real time. Here is the path: IPC@ SYS-IPC(T)SYS/LAGRANDE O#82121 hnf- IPC-SNPD(T…
-
6 Dec 2000
Cara Semperger to Mark Fischer, Tom Alonso, Diana Scholtes and 11 more
The April NWPP meeting in Reno
We have been given responsibility for the Etag portion of the agenda, and it is going to be a panel discussion with Q & A, and then an E-tag practice session. I need your…
-
4 Dec 2000
Cara Semperger to portland.shift@enron.com and 8 more
NEW WAY TO SEE THE NOB EXPORTS!!!
The global ID field has been expanded to hold more data, and now you will be able to see who the network trans provider is and the sink. Right now we are only doing this …
-
2 Dec 2000
Cara Semperger to portland.shift@enron.com
You will see Mid Columbia Long 25 HLH
This is fake, there is a problem with a cross-desk transfer, and it is being resolved by our mighty developers in Houston. c