18 Jan 2001, 08:16 UTC
Real Time Position manager for 1/18
- From
- Cara Semperger cara.semperger@enron.com
- Date
- Thu, 18 Jan 2001 00:16:00 -0800 (PST)
Looking into why we were out, I find the following for the WSCC-S region. Pinnacle to West Wing is now balanced since the transmission is corrected Palo Verde is long and short increments of less than 1 MW, uncorrectable on my end (Mallory? Jeremy? Can you look into this) Mead is now only .40 long on HE 24, We are long at PV, 4 mw HE 23, 9 mw HE 24, our length is EPE and is listed in the EPE schedules. This length will need to be sold, and Bill is aware of it. Thanks, Cara