-
20 Apr 2001
Stacy Runswick to portland.shift@enron.com
We are shorrt @ PV LLH for 2/21/01
The original schedule was 50 MW's TEP GEN @PV(EPE XCHANGE) - EPMI - SRP-MIRANT-CISO(T)PVD/SP15. Mirant was cut by the CISO 25 mw HE 1-6, 8 mw HE 23, and 25 mw HE 24. Plea…
-
20 Apr 2001
Schedule Crawler to Pete Davis and 26 more
Start Date: 4/20/01; HourAhead hour: 15; <CODESITE>
Start Date: 4/20/01; HourAhead hour: 15; No ancillary schedules awarded. No variances detected. LOG MESSAGES: PARSING FILE -->> O:\Portland\WestDesk\California Scheduling…
-
20 Apr 2001
Bill Williams III to portland.shift@enron.com
Willamette
We are expecting Willamette Industries back tomorrow. Please be in touch with them and Les, and maximize the profit for these guys (last month we made $78,000). Thanks, B…
-
20 Apr 2001
Bill Williams III to portland.shift@enron.com
Length for Monday
We have length on peak Monday, 04-23 in NP-15. The energy is in PGE3, 25 mws are under ST-WBOM and 56 mws are in ST-CALI. We need to sell all 81 mws. In Enpower we buy th…
-
20 Apr 2001
Schedule Crawler to Pete Davis and 26 more
Start Date: 4/20/01; HourAhead hour: 14; <CODESITE>
Start Date: 4/20/01; HourAhead hour: 14; No ancillary schedules awarded. Variances detected. Variances detected in Generation schedule. Variances detected in SC Trades sc…
-
20 Apr 2001
Schedule Crawler to Pete Davis and 26 more
Start Date: 4/20/01; HourAhead hour: 13; <CODESITE>
Start Date: 4/20/01; HourAhead hour: 13; No ancillary schedules awarded. No variances detected. LOG MESSAGES: PARSING FILE -->> O:\Portland\WestDesk\California Scheduling…
-
20 Apr 2001
Bill Williams III to Eric Linder
Pacificorp vs PG&E
Eric, Please check your counterparty entry very carefully. I changed some deals today that were entered as PG&E rather than Pacificorp. These are obviously two distinctly…
-
20 Apr 2001
Schedule Crawler to Pete Davis and 26 more
Start Date: 4/20/01; HourAhead hour: 12; <CODESITE>
Start Date: 4/20/01; HourAhead hour: 12; No ancillary schedules awarded. Variances detected. Variances detected in SC Trades schedule. LOG MESSAGES: PARSING FILE -->> O:\…
-
20 Apr 2001
ISC Hotline to enron.list@enron.com, isc.groups@enron.com, enron.users@enron.com
SAP SYSTEM OUTAGE NOTIFICATIONS
The following servers will be coming down, please see below for more details and scheduled times : ------------------------------------------------------------- SYSTEM OU…
-
20 Apr 2001
Schedule Crawler to Pete Davis and 26 more
Start Date: 4/20/01; HourAhead hour: 11; <CODESITE>
Start Date: 4/20/01; HourAhead hour: 11; No ancillary schedules awarded. Variances detected. Variances detected in SC Trades schedule. LOG MESSAGES: PARSING FILE -->> O:\…
-
20 Apr 2001
Mark Guzman to portland.shift@enron.com
New BPA Account Numbers
I have set up the following BPA account numbers since we have been submitting dec bids at Malin the past few days: CISO to PUGET 882716 CISO to WWP 681713 CISO to SCL 882…
-
20 Apr 2001
Bill Williams III to portland.shift@enron.com
El Paso Model
Group, For the third day in a row (4th time this week) I have received an email or call from Kathy at EPE asking the model to be resent because of simple errors. Typos in…
-
20 Apr 2001
Schedule Crawler to Pete Davis and 26 more
Start Date: 4/20/01; HourAhead hour: 10; <CODESITE>
Start Date: 4/20/01; HourAhead hour: 10; No ancillary schedules awarded. No variances detected. LOG MESSAGES: PARSING FILE -->> O:\Portland\WestDesk\California Scheduling…
-
20 Apr 2001
Schedule Crawler to Pete Davis and 26 more
Start Date: 4/20/01; HourAhead hour: 9; <CODESITE>
Start Date: 4/20/01; HourAhead hour: 9; No ancillary schedules awarded. No variances detected. LOG MESSAGES: PARSING FILE -->> O:\Portland\WestDesk\California Scheduling\…
-
20 Apr 2001
Schedule Crawler to Pete Davis and 26 more
Start Date: 4/20/01; HourAhead hour: 8; <CODESITE>
Start Date: 4/20/01; HourAhead hour: 8; No ancillary schedules awarded. No variances detected. LOG MESSAGES: PARSING FILE -->> O:\Portland\WestDesk\California Scheduling\…
-
20 Apr 2001
Schedule Crawler to Pete Davis and 26 more
Start Date: 4/20/01; HourAhead hour: 7; <CODESITE>
Start Date: 4/20/01; HourAhead hour: 7; No ancillary schedules awarded. No variances detected. LOG MESSAGES: PARSING FILE -->> O:\Portland\WestDesk\California Scheduling\…
-
20 Apr 2001
Schedule Crawler to Pete Davis and 26 more
Start Date: 4/20/01; HourAhead hour: 6; <CODESITE>
Start Date: 4/20/01; HourAhead hour: 6; No ancillary schedules awarded. Variances detected. Variances detected in Load schedule. LOG MESSAGES: PARSING FILE -->> O:\Portla…
-
20 Apr 2001
Schedule Crawler to Pete Davis and 26 more
Start Date: 4/20/01; HourAhead hour: 5; <CODESITE>
Start Date: 4/20/01; HourAhead hour: 5; No ancillary schedules awarded. No variances detected. LOG MESSAGES: PARSING FILE -->> O:\Portland\WestDesk\California Scheduling\…
-
20 Apr 2001
Schedule Crawler to Pete Davis and 26 more
Start Date: 4/20/01; HourAhead hour: 4; <CODESITE>
Start Date: 4/20/01; HourAhead hour: 4; No ancillary schedules awarded. No variances detected. LOG MESSAGES: PARSING FILE -->> O:\Portland\WestDesk\California Scheduling\…
-
20 Apr 2001
Schedule Crawler to Pete Davis and 26 more
Schedule Crawler: HourAhead Failure <CODESITE>
Start Date: 4/20/01; HourAhead hour: 3; HourAhead schedule download failed. Manual intervention required.
-
20 Apr 2001
Eric Linder to Bill Williams III
WESTPOWER Login
Just a reminder... I'm not able to login to westpower.
-
20 Apr 2001
Schedule Crawler to Pete Davis and 26 more
Start Date: 4/20/01; HourAhead hour: 2; <CODESITE>
Start Date: 4/20/01; HourAhead hour: 2; No ancillary schedules awarded. No variances detected. LOG MESSAGES: PARSING FILE -->> O:\Portland\WestDesk\California Scheduling\…
-
19 Apr 2001
Schedule Crawler to Pete Davis and 26 more
Schedule Crawler: HourAhead Failure <CODESITE>
Start Date: 4/19/01; HourAhead hour: 23; HourAhead schedule download failed. Manual intervention required. LOG MESSAGES: PARSING FILE -->> O:\Portland\WestDesk\California…
-
19 Apr 2001
Schedule Crawler to Pete Davis and 26 more
Start Date: 4/19/01; HourAhead hour: 22; <CODESITE>
Start Date: 4/19/01; HourAhead hour: 22; No ancillary schedules awarded. Variances detected. Variances detected in SC Trades schedule. Variances detected in Load schedule…
-
19 Apr 2001
Schedule Crawler to Pete Davis and 26 more
Start Date: 4/19/01; HourAhead hour: 21; <CODESITE>
Start Date: 4/19/01; HourAhead hour: 21; No ancillary schedules awarded. Variances detected. Variances detected in Energy Import/Export schedule. Variances detected in SC…