Enron email

Algorithmic Indexing

944 messages for mailbox:linder-e

Newest Oldest

Matching messages by month
Skilling resigns
Q3 loss announced
Bankruptcy filing
  1. 20 Apr 2001

    Stacy Runswick to portland.shift@enron.com

    We are shorrt @ PV LLH for 2/21/01

    The original schedule was 50 MW's TEP GEN @PV(EPE XCHANGE) - EPMI - SRP-MIRANT-CISO(T)PVD/SP15. Mirant was cut by the CISO 25 mw HE 1-6, 8 mw HE 23, and 25 mw HE 24. Plea…

  2. 20 Apr 2001

    Schedule Crawler to Pete Davis and 26 more

    Start Date: 4/20/01; HourAhead hour: 15; <CODESITE>

    Start Date: 4/20/01; HourAhead hour: 15; No ancillary schedules awarded. No variances detected. LOG MESSAGES: PARSING FILE -->> O:\Portland\WestDesk\California Scheduling…

  3. 20 Apr 2001

    Bill Williams III to portland.shift@enron.com

    Willamette

    We are expecting Willamette Industries back tomorrow. Please be in touch with them and Les, and maximize the profit for these guys (last month we made $78,000). Thanks, B…

  4. 20 Apr 2001

    Bill Williams III to portland.shift@enron.com

    Length for Monday

    We have length on peak Monday, 04-23 in NP-15. The energy is in PGE3, 25 mws are under ST-WBOM and 56 mws are in ST-CALI. We need to sell all 81 mws. In Enpower we buy th…

  5. 20 Apr 2001

    Schedule Crawler to Pete Davis and 26 more

    Start Date: 4/20/01; HourAhead hour: 14; <CODESITE>

    Start Date: 4/20/01; HourAhead hour: 14; No ancillary schedules awarded. Variances detected. Variances detected in Generation schedule. Variances detected in SC Trades sc…

  6. 20 Apr 2001

    Schedule Crawler to Pete Davis and 26 more

    Start Date: 4/20/01; HourAhead hour: 13; <CODESITE>

    Start Date: 4/20/01; HourAhead hour: 13; No ancillary schedules awarded. No variances detected. LOG MESSAGES: PARSING FILE -->> O:\Portland\WestDesk\California Scheduling…

  7. 20 Apr 2001

    Bill Williams III to Eric Linder

    Pacificorp vs PG&E

    Eric, Please check your counterparty entry very carefully. I changed some deals today that were entered as PG&E rather than Pacificorp. These are obviously two distinctly…

  8. 20 Apr 2001

    Schedule Crawler to Pete Davis and 26 more

    Start Date: 4/20/01; HourAhead hour: 12; <CODESITE>

    Start Date: 4/20/01; HourAhead hour: 12; No ancillary schedules awarded. Variances detected. Variances detected in SC Trades schedule. LOG MESSAGES: PARSING FILE -->> O:\…

  9. 20 Apr 2001

    ISC Hotline to enron.list@enron.com, isc.groups@enron.com, enron.users@enron.com

    SAP SYSTEM OUTAGE NOTIFICATIONS

    The following servers will be coming down, please see below for more details and scheduled times : ------------------------------------------------------------- SYSTEM OU…

  10. 20 Apr 2001

    Schedule Crawler to Pete Davis and 26 more

    Start Date: 4/20/01; HourAhead hour: 11; <CODESITE>

    Start Date: 4/20/01; HourAhead hour: 11; No ancillary schedules awarded. Variances detected. Variances detected in SC Trades schedule. LOG MESSAGES: PARSING FILE -->> O:\…

  11. 20 Apr 2001

    Mark Guzman to portland.shift@enron.com

    New BPA Account Numbers

    I have set up the following BPA account numbers since we have been submitting dec bids at Malin the past few days: CISO to PUGET 882716 CISO to WWP 681713 CISO to SCL 882…

  12. 20 Apr 2001

    Bill Williams III to portland.shift@enron.com

    El Paso Model

    Group, For the third day in a row (4th time this week) I have received an email or call from Kathy at EPE asking the model to be resent because of simple errors. Typos in…

  13. 20 Apr 2001

    Schedule Crawler to Pete Davis and 26 more

    Start Date: 4/20/01; HourAhead hour: 10; <CODESITE>

    Start Date: 4/20/01; HourAhead hour: 10; No ancillary schedules awarded. No variances detected. LOG MESSAGES: PARSING FILE -->> O:\Portland\WestDesk\California Scheduling…

  14. 20 Apr 2001

    Schedule Crawler to Pete Davis and 26 more

    Start Date: 4/20/01; HourAhead hour: 9; <CODESITE>

    Start Date: 4/20/01; HourAhead hour: 9; No ancillary schedules awarded. No variances detected. LOG MESSAGES: PARSING FILE -->> O:\Portland\WestDesk\California Scheduling\…

  15. 20 Apr 2001

    Schedule Crawler to Pete Davis and 26 more

    Start Date: 4/20/01; HourAhead hour: 8; <CODESITE>

    Start Date: 4/20/01; HourAhead hour: 8; No ancillary schedules awarded. No variances detected. LOG MESSAGES: PARSING FILE -->> O:\Portland\WestDesk\California Scheduling\…

  16. 20 Apr 2001

    Schedule Crawler to Pete Davis and 26 more

    Start Date: 4/20/01; HourAhead hour: 7; <CODESITE>

    Start Date: 4/20/01; HourAhead hour: 7; No ancillary schedules awarded. No variances detected. LOG MESSAGES: PARSING FILE -->> O:\Portland\WestDesk\California Scheduling\…

  17. 20 Apr 2001

    Schedule Crawler to Pete Davis and 26 more

    Start Date: 4/20/01; HourAhead hour: 6; <CODESITE>

    Start Date: 4/20/01; HourAhead hour: 6; No ancillary schedules awarded. Variances detected. Variances detected in Load schedule. LOG MESSAGES: PARSING FILE -->> O:\Portla…

  18. 20 Apr 2001

    Schedule Crawler to Pete Davis and 26 more

    Start Date: 4/20/01; HourAhead hour: 5; <CODESITE>

    Start Date: 4/20/01; HourAhead hour: 5; No ancillary schedules awarded. No variances detected. LOG MESSAGES: PARSING FILE -->> O:\Portland\WestDesk\California Scheduling\…

  19. 20 Apr 2001

    Schedule Crawler to Pete Davis and 26 more

    Start Date: 4/20/01; HourAhead hour: 4; <CODESITE>

    Start Date: 4/20/01; HourAhead hour: 4; No ancillary schedules awarded. No variances detected. LOG MESSAGES: PARSING FILE -->> O:\Portland\WestDesk\California Scheduling\…

  20. 20 Apr 2001

    Schedule Crawler to Pete Davis and 26 more

    Schedule Crawler: HourAhead Failure <CODESITE>

    Start Date: 4/20/01; HourAhead hour: 3; HourAhead schedule download failed. Manual intervention required.

  21. 20 Apr 2001

    Eric Linder to Bill Williams III

    WESTPOWER Login

    Just a reminder... I'm not able to login to westpower.

  22. 20 Apr 2001

    Schedule Crawler to Pete Davis and 26 more

    Start Date: 4/20/01; HourAhead hour: 2; <CODESITE>

    Start Date: 4/20/01; HourAhead hour: 2; No ancillary schedules awarded. No variances detected. LOG MESSAGES: PARSING FILE -->> O:\Portland\WestDesk\California Scheduling\…

  23. 19 Apr 2001

    Schedule Crawler to Pete Davis and 26 more

    Schedule Crawler: HourAhead Failure <CODESITE>

    Start Date: 4/19/01; HourAhead hour: 23; HourAhead schedule download failed. Manual intervention required. LOG MESSAGES: PARSING FILE -->> O:\Portland\WestDesk\California…

  24. 19 Apr 2001

    Schedule Crawler to Pete Davis and 26 more

    Start Date: 4/19/01; HourAhead hour: 22; <CODESITE>

    Start Date: 4/19/01; HourAhead hour: 22; No ancillary schedules awarded. Variances detected. Variances detected in SC Trades schedule. Variances detected in Load schedule…

  25. 19 Apr 2001

    Schedule Crawler to Pete Davis and 26 more

    Start Date: 4/19/01; HourAhead hour: 21; <CODESITE>

    Start Date: 4/19/01; HourAhead hour: 21; No ancillary schedules awarded. Variances detected. Variances detected in Energy Import/Export schedule. Variances detected in SC…