20 Apr 2001, 15:34 UTC
We are shorrt @ PV LLH for 2/21/01
- From
- Stacy Runswick stacy.runswick@enron.com
- Date
- Fri, 20 Apr 2001 08:34:00 -0700 (PDT)
The original schedule was 50 MW's TEP GEN @PV(EPE XCHANGE) - EPMI - SRP-MIRANT-CISO(T)PVD/SP15. Mirant was cut by the CISO 25 mw HE 1-6, 8 mw HE 23, and 25 mw HE 24. Please refer to Mirant tag #3316 for this revised schedule. Mirant owes us a sink for 25mw HE 1-6, 8mw HE 23, and 25mw HE 24 and has decided to provide the sink on a real-time basis. Please check with Mirant to assure they have a sink for these hours. Please check out with TEP when you are aware of the new sink. Thanks Stacy