Enron email

Algorithmic Indexing

3,164 messages for mailbox:campbell-l

Newest Oldest

Matching messages by month
Skilling resigns
Q3 loss announced
Bankruptcy filing

2 more fall outside these years.

  1. 9 Aug 1999

    Laura Glenn to Michael Terraso, William Kendrick, joe.kolb@enron.com and 25 more

    Environmental Notices

    Attached are Environmental Notices regarding two new EPA regulations for glycol dehydrators. One is for dehys on the pipeline from the well to the gas processing plant (O…

  2. 26 Jul 1999

    Team San-Juan-LaPlata to Larry Campbell and 2 more

    La Plata Fuel Consumption

    Larry, In the latest conversation with Harold Barth, a field engineer with Solar, we were told that the equipment data received last week was a best case scenario. The fu…

  3. 23 Jul 1999

    Marc Phillips to David Ayers, Kyle Purvis, don.stevens@enron.com and 16 more

    Area Source MACT Regulations

    EPA released their urban strategy for their Air Toxics Program, and they listed reciprocating engines as an area source they plan on regulated under the MACT regulations …

  4. 23 Jul 1999

    Larry Campbell to Michel Nelson, Rich Jolly, David Roensch and 11 more

    Recent PCB Results, Topock Lateral

    A 2:00 pm central time conference call has been scheduled to discuss the most recent analytical results from the Topock Lateral PCB sampling. Your attendence is requested…

  5. 23 Jul 1999

    Larry Campbell to Michel Nelson, David Roensch, Rich Jolly and 9 more

    Recent PCB Analytical Results, Topock Lateral

    A 2:00 pm central time conference call has been scheduled to discuss the most recent PCB analytical results for the Topock Lateral. Your attendance is requested. The dial…

  6. 15 Jul 1999

    Larry Campbell to team.monahans@enron.com and 10 more

    Groundwater Monitoring to be Discontinued at the Puckett Plant

    Approval was received from the Texas Railroad Commission to discontinue groundwater monitoring at the Pucket Plant. As you may remember, Transwestern constructed a permit…

  7. 22 Jun 1999

    Larry Campbell to Team San-Juan-LaPlata and 4 more

    Fuel Consumption, La Plata A

    Guys, I received Harrell's memo concerning the fuel use for the turbine and the fact that you had to reduce gas producer speeds to comply with the permits fuel use requir…

  8. 11 Jun 1999

    Larry Campbell to Rich Jolly, Michel Nelson, David Roensch and 8 more

    Cleaning Postponement of the pipeline between TW PG&E M/S and the Topock C/S

    Based upon valving constraints and the innaccessability to the inside of the pipe between our M/S and the Topock C/S, a decision has been made to postpone cleaning of his…

  9. 11 Jun 1999

    Robert C Iversen AT ENRON_DEVELOPMENT@CCMAIL to Rich Jolly and 8 more

    Topock diesel pigging strategy

    After the Topock line has been cleaned and placed back in service, I recommend immediate flushing with diesel. The existing Selexol tank and injection system can be used …

  10. 4 Jun 1999
  11. 4 Jun 1999

    Louis Soldano to Michel Nelson, Jeffery Fawcett, Steven Harris and 7 more

    PG&E - premeeting discussion with opposing counsel

    I just spent about 40 minutes on the phone with my counterpart discussing the upcoming meeting. The call was cordial. A couple of items that came up worth passing on are …

  12. 2 Jun 1999

    Bryan Nicholson to Larry Campbell and 8 more

    Draft PCB sampling procedure

    <<Topock-PCB atandard>> Larry, Attached is a draft PCB sampling procedure for your review. Your comments would be appreciated. Bryan Nicholson Co. ext 251-5477 outside (9…

  13. 2 Jun 1999

    Louis Soldano to Michel Nelson and 6 more

    Additonal Information Concerning PG&E

    Mike - I'd suggest we move on any decon work for our facilities at the same time..... The find of PCBs in the compressors will undoubtedly be the subject of next week's m…

  14. 2 Jun 1999

    Larry Campbell to Louis Soldano, Rich Jolly, David Roensch and 8 more

    Additonal Information Concerning PG&E

    On a related note, I spoke to Vector concerning the equipment which was suggested for cleaning on the PG&E system. It is as follows: 2 scrubbers, some underground C/S pip…

  15. 2 Jun 1999

    Michel Nelson to Larry Campbell and 16 more

    Re: Issues Pertaining to Meeting with PG&E

    I don't know what the cost is, but it may be a good thing if it were flushed. Mike

  16. 27 May 1999

    Marc Phillips to David Ayers, Ron Beidelman, Ruth Jensen and 22 more

    EPA Rules; Glycol Dehys

    The oil and gas production (O&G) and transmission and storage (T&S) MACT rules have been signed by EPA and should appear in the Federal Register very soon (late May or ea…

  17. 14 May 1999

    Larry Campbell to Team San-Juan

    Re: New Units

    Tracy, thanks for the heads up. Beginning in January of 2000, provide me with the new and old serial numbers for each unit and a closer exchange date, as things (scheduli…

  18. 14 May 1999

    Team San-Juan to Larry Campbell, Butch Russell, Rick Smith and 2 more

    New Units

    The Bloomfield Station will be exchanging three turbines in 2000. The La Plata Station will be exchanging one unit in 2000. Bloomfield #1001 on 03-06-2000 #1002 on 03-08-…

  19. 7 May 1999

    George Robinson to joe.guerra@ns.csite.rrc.state.tx.us and 4 more

    Pecos County # 6 Compressor Station-Northern Natural Gas Company

    Joe, In April last year we submitted a copy of the attached work plan to your office. I believe your office forwarded the plan on to your Austin office for review. The sc…

  20. 6 May 1999

    Mike McCracken to Larry Campbell and 8 more

    Re: recoat job on State of NM

    What Cecil is checking on is for access to the job. To haul equipment into the job, the contractors will have to follow the ROW to the east to a county / private develope…

  21. 5 May 1999

    Larry Campbell to Michel Nelson, Rich Jolly, Louis Soldano and 9 more

    Results of the PG&E Filter Separator Cleaning

    Just a short message to apprise everyone of the cleaning results performed on the filter separator from the Transwestern M/S. Wipe tests taken of the interrior portions o…

  22. 3 May 1999

    Larry Campbell to George Robinson and 2 more

    Re: NNG Gomez Water Disposal

    Go for it! George Robinson 04/27/99 04:14 PM To: Larry Campbell/ET&S/Enron@Enron cc: Butch Russell/ET&S/Enron@Enron Subject: NNG Gomez Water Disposal I began discussions …

  23. 3 May 1999

    Team San-Juan-LaPlata to Larry Campbell and 2 more

    N.O.V.

    The following is a description and explanation of the violation that occurred at the La PLata compressor station.

  24. 3 May 1999

    George Robinson to Larry Campbell

    AFUDC on Remediation Projects

    Larry, this is a potential issue, at least from an accounting perspective. The total dollar amount for 1999 Expense in the ET&S Albuquerque Region is $345,000 (excluding …

  25. 9 Apr 1999

    David Roensch to Rich Jolly and 18 more

    PG&E UPDATE

    Mike We completed the decontamination on both of the filter separators on the discharge of the Solexol Plant. There was a thin film of an oily substance (presumably Solex…