Enron email

Algorithmic Indexing

12 Dec 2000, 19:12 UTC

NWP System Notice - 01-188 NWP Short Term Firm Availability

From
Miki Bode miki.bode@williams.com
To
abenton@utilicorp.com, agcdu1@triax.com, agcdu6@triax.com, anita.reubens@swgas.com, bblanar@coral-energy.com, bob.mattice@engageenergy.com, browning@wasatchenergy.com, bruce.langmade@fortjamesmail.com, bymank@wdni.com, cards@wdni.com, ccoyle@americansoda.com, cmcgra@puget.com
and 39 more cridin@puget.com, dave.dungan@weyerhaeuser.com, deborahs@kimballenergy.com, derek.danyliw@husky-oil.com, dlh@nwnatural.com, fermis@enron.com, gacynth_adam@transcanada.com, geek@bp.com, gilesmh@bp.com, janderson@clarkpud.com, jane@itcoworld.com, jennifer_owen@pgn.com, jmmcarthur@duke-energy.com, jsanders@clarkpud.com, kims@kimballenergy.com, klambe@puget.com, kri.pam@pdg.net, llightfoot@coral-energy.com, lmanis@sdge.com, lprior@enron.com, niels_a_vervloet@reliantenergy.com, ramperms@bp.com, rfm@nwnatural.com, robert.harp@engageenergy.com, rony@panalberta.com, Ryan Watt, sbrewer@enron.com, scotts@kimballenergy.com, sghill@bcgas.com, sgwi@dynegy.com, spjutd2@wdni.com, ssouth@enron.com, Stephane Brodeur, tdizona@coral-energy.com, tgilliam@avistaenergy.com, tom.mckay@engageenergy.com, val_yildirok@pgn.com, wharlan@ix.netcom.com, zcourns@national-fuel.com
Date
Tue, 12 Dec 2000 11:12:00 -0800 (PST)
Post Date: December 12, 2000 
Category: SHORT-TERM FIRM CAPACITY 
Subcategory: NWP OFFERS 
Subject: 01-188 NWP Short Term Firm Availability 

Notice Text: 
All Shippers Notification:? 01-188??? Dated : December 12, 2000 

*** REMINDER *** 

NORTHWEST PIPELINE'S 
NOTICE OF AVAILABLE AND POTENTIALLY AVAILABLE FIRM TRANSPORTATION CAPACITY1) 

??????????????????????????????????????????????? Total??? Available 
Pkg? Receipt Point2)????????? Delivery Point2)?????????? Dth/d????????? 
Date3)?? 

A??? Sumas??????????????????? Puget(Canyon)??????????????????? 16,000???????? 
02/01/01 9) 

B??? Sumas??????????????????? Puget(Canyon)????????????????????? 
7,000???????? 01/01/01 9) 

C??? Sumas??????????????????? Puget(Canyon)????????????????????? 
5,000????????? 01/01/01 10) 

D??? Sumas????? ??????????????? Kern River/Muddy Crk.?????? 9,772????????? 
02/01/01 10) 

E??? Sumas(1160)????????? Kemmerer???????????????????????????? 2,750????????? 
01/01/01 9) 
???? Ignacio Plant(1590) 

F??? Sumas(2,390)???????? Monticello(330)????????????????????? 6,016????????? 
01/01/01 9) 
???? Ignacio(3,626)????????? Rio Algom(300) 
?????????????????????????????????????? Moab#2(1,861) 
?????????????????????????????????????? Moab(2,283) 
?????????????????????????????????????? Arches National Park(17) 
?????????????????????????????????????? Vernal(653) 
?????????????????????????????????????? Dutch John(125) 
?????????????????????????????????????? Redwash(447) 

********************************************************************** 
Jackson Prairie Receipt Point Capacity 
Available for TF-1 or TF-2 Service as specified below 

G??? Jackson Prairie??? SIPI????????????????????????????? 47,341?? NOW 5)8) 
???? (55,715)??????????????????? Lynden??????????????????????????? 592????? 
?????????????????????????????????????? Lawrence???????????????????????? 
81?????? 
?????????????????????????????????????? ACME???????????????????????????????? 
68?????? 
?????????????????????????????????????? Mt. Vernon???????????????????? 
115????? 
?????????????????????????????????????? Sedro/Woolley??????????? 3,988??? 
?????????????????????????????????????? LDS Church??????????????????? 133 
?????????????????????????????????????? Granite Falls??????????????? 1,536??? 
?????????????????????????????????????? Machias?????????????????????? 1,840??? 
?????????????????????????????????????? Snohomish????????????????????? 
21?????? 

H??? Jackson Prairie??? Echo Lake??????????????????????? 33?????? NOW 5)8) 
???? (7,530)????????????????????? Duval/Cottage Lake????? 183???? 
?????????????????????????????????????? Redmond??????????????????? 3,293?? 
?????????????????????????????????????? May Valley????????????????????? 
300???? 
?????????????????????????????????????? Lake Francis?????????????? 2,808?? 
?????????????????????????????????????? Covington????????????????????? 263???? 
?????????????????????????????????????? Black Diamond????????????? 450???? 
?????????????????????????????????????? Enumclaw????????????????????? 200???? 

I??? Jackson Prairie????? Sedro/Woolley?????????? 8,300??? 05/01/01 5)10) 

J?? Jackson Prairie????? South Lake???????????? 35,500?? NOW 6) 
?? 
K?? Jackson Prairie????? Idaho State Pen.?????? 1,735??? NOW 6) 

L?? Jackson Prairie????? Kern River/Muddy Crk.? 98,069?? NOW 6) 

M? Jackson Prairie????? Shute Creek???????????? 7,688??? NOW 6) 

N?? Jackson Prairie????? Pocatello?????????????????? 1,198??? NOW 6) 

O?? Starr Road?????????????? Inland Paper??????????????? 830????? NOW 8) 

P?? Stanfield????????????????? Stanfield??????????????????? 3,681??? 01/01/01 
9) 

Q?? Stanfield????????????????? Stanfield?????????????????? 14,490?? 04/01/02 
10) 

R?? Shute Creek??????????? Ignacio-Bondad (EPNG)? 25,000?? NOW 

S?? Shute Creek??????????? Ignacio-Bondad (EPNG)? 25,000?? 01/01/01 9) 

T?? Shute Creek??????????? Ignacio-Bondad (EPNG)? 10,000?? 01/01/01 10) 

U?? Shute Creek??????????? Ignacio-Bondad (EPNG)? 15,000?? 11/01/01 9) 

V?? Opal Plant??????????????? Western Mkt Center????? 90,000??? 04/01/01 9) 

W?? Painter??????????????????? Muddy Creek (KERN)???????? 8,351??? NOW 8) 

X?? Painter???????????????????? Muddy Creek (KERN)??????? 35,000?? 01/01/01 
9) 

Y??? Western Mkt Center?????? Crossover 16-Questar?? 50,415?? 01/01/01 7) 9) 

Z??? Western Mkt Center?????? Clay Basin?????????????????????????? 4,585??? 
NOW 7) 8) 

AA?? Crossover 16???????????????? Green River-CIG?????????????? 23,152??? NOW 
7) 8) 

BB?? Crossover 16????????????????? Clay Basin????????????????????????? 
10,000?? NOW 7) 9) 

CC?? Crossover 16???????????????? Clay Basin?????????????????????????? 
17,263?? NOW 7) 

DD?? Green Rvr/McKinn-CIG? Clay Basin?????????????????????????? 23,152?? NOW 
7) 8) 

EE?? Clay Basin???????????????????????? Chevron Rangely(6093)???? 7,488??? 
03/01/01 9) 
?????????????????????????????????????????????????? Vernal (1395) 

FF?? Clay Basin???????????????????????? Redwash/Questar???????????? 19,240?? 
03/01/01 7) 9) 

GG?? Clay Basin??????????????????????? 
Rifle?????????????????????????????????????? 7,770??? NOW 7) 8) 

HH?? Clay Basin??????????????????????? 
Rifle??????????????????????????????????????? 1,850??? 01/01/01 7) 10) 

II?? Clay Basin????????????????????????? American Soda Ash???????????? 
1,140??? NOW 7) 8) 

JJ?? Jensen (Ut Gas Svc)????? Green River-CIG?????????????????????? 316??? 
NOW 

KK?? Redwash/Chevron??????? Green River-CIG??????????????????? 1,850??? NOW 
8) 

LL?? Redwash/QPC??????????????? 
Rifle????????????????????????????????????????? 1,050??? NOW 7) 8) 
???? 
MM?? Greasewood??????????????? Clay Basin?????????????????????????????? 
2,765??? NOW 8) 

NN?? Piceance Quick Cycle?? Green River-CIG??????????????????? 1,005??? NOW 

OO?? Barrett???????????????????????????? Kern 
River????????????????????????????? 4,097??? 03/01/01 9) 
? 
PP?? Barrett????????????????????????????? Green River-CIG?????????????????? 
6,460??? NOW 8) 

QQ?? North Douglas??????????????? Green River-CIG?????????????????? 3,178??? 
NOW 

RR?? Sand Springs?????????????????? Ignacio-Bondad (EPNG)???? 23,148??? 
01/01/01- 
??????????????????????????????????????????????????????????????????????????????
????????????????????????????????? 03/31/01 4)

SS?? Sand Springs????????????????? Ignacio-Bondad (EPNG)?????? 23,148?? 
11/01/01 4,10) 

TT?? West Douglas???????????????? Clay Basin?????????????????????????????? 
2,354?? NOW 8) 

UU?? Calf Canyon(410)??????????? Kern River????????????????????????????????? 
703??? 01/01/01 9) 
???? Foundation Crk.(293) 

VV?? Lisbon??????????????????????????? Green River-CIG????????????????????? 
2,600??? NOW 

WW?? Grand Valley??????????????? Green River-CIG????????????????????? 
1,137??? NOW 

XX?? Grand Gas????????????????????? Green River-CIG????????????????????? 
1,000??? NOW 

YY?? Ignacio Plant????????????????? Green River-CIG????????????????????? 
5,000??? 01/01/01 9) 

ZZ?? Ignacio Plant????????????????? Green River-CIG????????????????????? 
1,424??? NOW 8) 

AAA? Ignacio Plant??????????????? Green River-CIG???????????????????? 
11,177?? NOW 

BBB?? Ignacio Plant??????????????? Grand Junction??????????????????????? 
4,000??? 01/01/01 9) 

CCC?? Ignacio Plant?????????????? Grand Junction??????????????????????? 
4,310??? NOW 8) 

DDD?? Ignacio Plant??????????????? Ignacio -Bondad (EPNG)??????? 50,000?? NOW 
8) 

EEE?? Blanco Hub-TW??????????? Green River-CIG????????????????????? 25,000?? 
01/01/01 9) 

FFF?? Blanco Hub-TW??????????? Green River-CIG????????????????????? 15,000?? 
01/01/01 10) 

GGG?? Blanco Hub-TW????????? Green River-CIG????????????????????? 35,563?? 
NOW 


************************************************************************ 

1) This notification supercedes all previous Notices of Available and 
???? Potentially Available Capacity and is subject to change at any time. 

2) Other receipt and delivery points utilizing the described 
??? transportation corridor may be available. 

3)? Potential Availability date for the Capacity. 

4)? Contracts shall include the following subordinate scheduling 
??? provision if the requested term extends into a critical operational 
??? period: 

To the extent Shipper's nominated volumes are not scheduled solely 
due to Shipper's subordinate scheduling priorities set forth below, 
the monthly base reservation charge will be discounted to $0.00 per 
Dth for that quantity only. 

Section 14.1(c)(i) of Northwest's tariff is modified to condition 
Shipper's primary corridor rights through any mainline constraint 
from the Sand Springs receipt point to the Ignacio Bondad (or 
LaPlata-TW) delivery point(s) to have a scheduling priority which 
will be subordinate to the scheduling priority for any firm shipper 
with primary corridor rights that encompass and extend beyond the 
Sand Springs to Ignacio Bondad (or LaPlata-TW) corridor. 

5) Available for TF-1 or TF-2 transportation service.? TF-2 service 
will not be discounted below Northwest's current Tariff filed rate 
for TF-2 service.? Additionally, TF2 service must be linked to requester's 
designated storage contract or storage ownership right. TF-2 service shall 
include the following subordinate scheduling priority language: 

Section 14.1(d)(i) of Northwest's tariff is modified to condition 
Shipper's primary corridor rights from the Jackson Prairie receipt 
point to the _____________ delivery point to have a scheduling 
priority at any northflow constraint point in that corridor that is 
subordinate to the scheduling priority for any firm service with 
unconditioned primary corridor rights through such constraint point. 

6) Available for TF-2 transportation service only. TF-2 service will 
not be discounted below Northwest's current Tariff filed rate for??? TF-2 
service.? Additionally, TF2 service must be linked to requester's 
designated storage contract or storage ownership right.? TF-2 service 
shall include the following subordinate scheduling priority language: 

Section 14.1(d)(i) of Northwest's tariff is modified to condition 
Shipper's primary corridor rights from the Jackson Prairie receipt 
point to the _____________ delivery point to have a scheduling 
priority at any southflow constraint point in that corridor that is 
subordinate to the scheduling priority for any firm service with 
unconditioned primary corridor rights through such constraint point. 

7) Capacity is not to exceed a one month primary term with evergreen 
language.? Any offers with terms greater than one month will need to be 
evaluated for possible seasonal flow conditions that may restrict the 
available capacity beyond a one month term. 

8) This capacity is currently under contract with an evergreen clause. 
This capacity can be made available by providing one business day??? written 
termination notification to the current holder of the??????? capacity. 

9) This capacity is currently under contract with an evergreen clause. 
This capacity can be made available by providing ten business days 
written termination notification to the current holder of the capacity. 

10) This capacity is currently under contract and does not contain an 
evergreen clause. 

11) This capacity is "mitigated" capacity and will not contain an 
evergreen clause. 

12) This capacity is available only for the term offered.? No evergreen 
clause available.? 

PROCEDURE FOR REQUESTING AVAILABLE AND 
POTENTIALLY AVAILABLE 
TRANSPORTATION CAPACITY 

To request Potentially Available Transportation Capacity available on the 
first 
day of January 2001, Shipper must submit a Prearranged Offer in the form of 
the 
Letter Agreement provided below.? This Letter Agreement must be received by 
Northwest no later than 2:00 pm Central Time on December 13, 2000.? Northwest 
will accept or reject the Prearranged Offer by no later than the end of of 
the 
gas day on December 14, 2000. If the Prearranged Offer is acceptable, 
Northwest 
will provide a 10-day termination notice to the current holder of the 
Capacity, 
post the Prearranged Offer for bid, and Award the capacity no later than two 
business days after the Bid Close Date.? Unless otherwise specified in this 
posting, bids will be evaluated and awarded pursuant to the procedure set 
forth 
in Northwest's tariff. 

To request the Potentially Available Transportation Capacity with the? one 
business day termination provisions as indicated by footnote "8)",? Shipper 
must 
submit a Prearranged Offer in the form of the Letter Agreement provided 
below. 
Upon receipt of this Letter Agreement Northwest will either accept or reject 
the 
Prearranged Offer within 24-hours. If the Prearranged Offer is acceptable, 
Northwest will provide the one business day termination notice to the current 
holder of the Capacity, post the Prearranged Offer for bid, and Award the 
capacity no later than two business days after the Bid Close Date.? Unless 
otherwise specified in this posting, bids will be evaluated and awarded 
pursuant 
to the procedure set forth in Northwest's tariff. 

To request Available Transportation Capacity, Shipper must immediately submit 
a 
Prearranged Offer in the form of the Letter Agreement provided below.? 
Northwest 
will accept or reject the Prearranged Offer within two (2) business days of 
receipt of the prearranged offer.? If the Prearranged Offer is acceptable, 
Northwest will post the Prearranged Offer for bid, and Award the capacity no 
later than two business days after the Bid Close Date.? Unless otherwise 
specified in this posting, bids will be evaluated and awarded pursuant to the 
procedure set forth in Northwest's tariff. Northwest has the right to re-post 
Available capacity for bid ith or without prearranged offers. 


??????? _________________(Date) 


____________________________ (Company Name) 
____________________________ (Company Address) 
____________________________ (City, State, Zip) 

VIA FACSIMILE - (801) 584-7076 

Northwest Pipeline Corporation 
c/o Williams Gas Pipelines - West 
Attn: Candace C.? Karpakis 
295 Chipeta Way 
Salt Lake City, UT 84158 

Re:???? Prearranged Offer for Available or Potentially Available 
Transportation 
Capacity on Williams' Northwest Pipeline Transmission System 

Dear Candace: 

_______________________ ("Shipper") submits the following bid for available 
or 
potentially available transportation capacity ("Capacity") designated as 
package 
_____ on Northwest Pipeline Corporation's ("Northwest") "Notice of Available 
or 
Potentially Available Firm Transportation Capacity" dated December 12, 2000. 
Shipper recognizes and agrees that the Capacity will be subject to the 
Special 
Conditions set forth in this posting.? Shipper's request? is?? or?? is not 
(circle one) contingent upon confirmation that its offered discount rate 
provides use of receipt/delivery points outside the receipt/delivery point 
corridor specified in the package.? If maximum rate is offered, this 
provision 
does not apply.? Shipper understands that its prearranged offer is subject to 
the Special Conditions described below. 

Shipper understands that Northwest will post the prearranged details of this 
offer for such Capacity for bidding and Shipper will have the right to match 
the 
highest bid value upon close of the bid process.? Northwest will not disclose 
the identity of the prearranged bidder in such posting. 

Service Type:?????????? TF-1 Large Customer 

Contract Demand(Dth/d): ____________________ 

Receipt Point(s)(if other than those posted for the designated package of 
capacity)????????????????????????? ____________________ 
Delivery Point(s)(if other than those posted for the designated package of 
capacity)??????????????????????????????? ____________________ 
Daily Reservation Rate: $_______/Dth? (applicable surcharges, volumetric 
charge 
& fuel are additive) 

Term:______________________________to___________________________________ 

Evergreen Requested (circle one):?????? Yes?? or???? No 

Identity of any affiliate of Northwest involved in Shipper's transaction: 
Indicate "None" or "Name the Affiliate": 
_________________________________________________ 

Northwest's acceptance of Shipper's prearranged offer for the Capacity will 
constitute a binding agreement between Northwest and Shipper.? Shipper shall 
be 
awarded the Capacity at the terms agreed upon in this Letter Agreement if no 
bids are received with a greater economic value for such Capacity during the 
bid 
process. If Shipper elects to match a bid with a greater economic value, it 
shall be awarded the Capacity according to the terms of the matched bid. 
Shipper 
agrees to electronically execute a service agreement on Northwest's 
Electronic 
Bulletin Board which confirms the terms of the final accepted transaction. 

If you have questions or comments regarding the above referenced information, 
please contact __________________________ at ______________________ 
Phone Number) ______________________(Fax Number). 

Sincerely, 

______________________________???????????????? (Name) 
______________________________???????????????? (Title) 

(Accepted? /? Rejected) by Northwest: 

Date: _______________?? Name: ________________________________ 

SPECIAL CONDITIONS 
(For Prearranged Offer Agreement) 

If the prearranged offer for the Capacity is accepted at a discount rate 
which 
provides for the use of receipt/delivery points outside the specified 
receipt/delivery point corridor for the Capacity, the accepted prearranged 
offered discount rate shall apply no matter which receipt and delivery points 
are utilized by Shipper, or any temporary replacement Shipper, under capacity 
release transactions, including segmented releases.? If the accepted 
prearranged 
offered discount rate for the Capacity does not provide for use of 
eceipt/delivery points outside the specified receipt/delivery point corridor 
for 
the Capacity, the accepted prearranged offered discount rate shall apply to 
Shipper, or any temporary replacement Shipper, only to the extent that both 
Shipper and any temporary replacement Shipper utilize receipt points within 
their respective primary firm receipt/delivery point to primary firm delivery 
point corridors, otherwise, Shipper will be liable for Northwest's maximum 
tariff rates. 

If you are interested in discussing any of the Available or Potentially 
Available Capacity, please call Candace Karpakis at (801) 584-6996 (work) or 
at 
(801) 971-5983 (cellular). 

Word:? F:\NWP Capacity Postings\2000 All Shipper Notices\01-188 12-12-2000??