Jeff, Here was my "bullet" to Steve for Horton's staff meeting. Call if you want and I'll give you the full poop. SoCalGas Capacity Forum- On March 8, SoCalGas convened an industry-wide meeting in Los Angles to discuss the adequacy of existing LDC infrastructure in Southern California. SoCalGas,s position is that, at least in the near term (1- 5 yrs.), they have adequate transmission and storage assets to meet demand, including load growth from electric generators. However, they did agree to file with the CPUC for a small (200 MMcf/d) expansion of takeaway capacity at 4 pipeline interconnects at a total cost of $14MM. One of the proposed sites was Transwestern,s N. Needles. Through the addition of 1,000 HP of compression, SoCal Gas proposes to add 50 MMcf/d capacity to N. Needles at a cost of $2MM. Transwestern and SoCal Gas will conduct a follow-up meeting on March 22.