13 Aug 2001, 18:59 UTC
Congestion/Enpower to CAPS variance
- From
- Bill Williams III bill.williams@enron.com
- Cc
- Kate Symes
- Bcc
- Kate Symes
- Date
- Mon, 13 Aug 2001 11:59:02 -0700 (PDT)
Jim and Darren, We relieved Path 15 congestion for HE 7 on Saturday morning. We flowed 10 mws from Malin to FC345. This resulted in the 10 mw "variance" in the report. I have added deals to Enpower to flatten the report, these deals are only necessary for the sake of the report. The identical variance in the north and south indicates a wheel or load shift. I prefer to not enter these extra deals. Please see me with questions if you do not understand why the report variance exists. Thanks, Bill