1 Aug 2001, 07:43 UTC
Position Manager for 8/1/01
- From
- Ryan Slinger ryan.slinger@enron.com
- Date
- Wed, 1 Aug 2001 00:43:14 -0700 (PDT)
It appears that there is a 10mw transmission schedule missing on peak from Pac System border to Mid C. This has us out 320 mw at Mid C for 8/1/01. thanks- ryan