Enron email

Algorithmic Indexing

24 Jul 2001, 19:16 UTC

FW: Outages on ANR and El Paso

From
Lynn Blair lynn.blair@enron.com
To
Terry Kowalke, John Buchanan
Date
Tue, 24 Jul 2001 12:16:57 -0700 (PDT)
	FYI.  Thanks. lYnn
Quoted or forwarded from earlier messages
-----Original Message-----
From: 	Brennan, Lorna  
Sent:	Tuesday, July 24, 2001 9:17 AM
To:	Anderson, Ken; Aschwege, Doug; Beck, Judy; Choquette, Gary; Descoteaux, Carolyn; Johnson, Robert L.; Reinecke, Bryan; Sans Souci, Becki; Westfall, Roger; Dushinske, John; Fowler, Bill; Miller, Kent; Neubauer, Dave; Neville, Sue; Williams, Jo; Barry, Mike; Berg, Vicki; Bolks, Sean; Bollinger, Joni; Bowers, Janet; Branney, Theresa; Buehler, Craig; Burleson, Bob; Cabrera, Reyna; Ferrell, Lee; Halpin, Tom; Herber, Stephen; Janousek, Martha; Johanson, Tim; Joyce, Jane; Lagerstrom, Karen; Lantefield, Laura; Mason, Robert; McCarran, Penny; Mercaldo, Vernon; Nielsen, Jeff; Oldenhuis, Frank; Pavlou, Larry; Penkava, Loren; Pritchard, John; Roobaert, Preston; Sebesta, Chris; Semin, Frank; Stage, Michael G.; Stevens, Bob; Swett, Larry; Thomas, Steve; Threet, Kay; Valley, Lisa; Weller, Steve; Wilkinson, Chuck; McGowan, Mike W.; Blair, Lynn; Dietz, Rick; January, Steven; Nacey, Sheila; Scott, Donna; Corman, Shelley; Harris, Steven; Donoho, Lindy; Goradia, Pallavi; Lindberg, Lorraine; Lohman, TK; Lokay, Michelle; Moore, Jan; Watson, Kimberly
Subject:	Outages on ANR and El Paso

Note:  This may open up opportunity at Greensburg as some ANR injection volumes may have to flow from west to east.
ANR said Monday a previously delayed Southeast Mainline maintenance project between Main Line Valves 9 and 11 is now scheduled for today through Thursday. It will add another 75 MMcf/d of capacity constraint to an ongoing reduction of 100 MMcf/d that will run through the end of August due to compressor maintenance on the Southeast Mainline. 

Note:  This is a large one-day outage.  Have we heard anything about how El Paso is mitigating the effects with their customers?
El Paso will shut down the Window Rock Station on July 27 for Department of Transportation tests and station wiring changes. The work will coincide with modifications to Lines 1205 and 1218 in the San Juan Basin. North Mainline capacity will be reduced by 380 MMcf/d, and no deliveries can be made from El Paso to the ITWWINRK interconnect.