16 Mar 2001, 11:38 UTC
=?ANSI_X3.4-1968?Q?Washington=01,s_Energy_Supply_Order_No._01-02?=
- From
- Mary Schoen mary.schoen@enron.com
- To
-
Tim Belden, Christopher F Calger, Elliot Mainzer, Alan Comnes, Paul Kaufman, Lysa Akin, Susan J Mara, Jeff Dasovich, Sandra McCubbin, Joseph Alamo, Hedy Govenar, Mary Schoen
and 6 more
Richard Shapiro, John Neslage, James D Steffes, Harry Kingerski, Stacey Bolton, Neil Bresnan - Date
- Fri, 16 Mar 2001 03:38:00 -0800 (PST)
This order may be an opportunity to get additional back-up generation quickly installed at customer's facilities in WA State. It is only applicable for onsight energy use - not selling to the grid. On January 29, 2001 Governor Gary Locke signed Energy Supply Order No. 01-02, suspending regulations pertaining to construction and portable source requirements of the Washington Administrative Code (WAC 173-400-110) and local air pollution control authority regulations adopted under RCW 70.94.152 for 30 days. The 30 days suspension was granted to allow temporary electric generators that may be a major source of air pollution to be installed or constructed by utilities and other users of electricity without receiving a construction approval from the state. The order allows non-utilities to generate the electricity to offset their existing demand. However, non-utilities cannot sell the generated electricity. The purpose of the Order was to get sources generating electricity on line immediately. The order has now been extended to March 27, 2001 and is known as &Energy Supply Order No. 01-04.8 It is likely the extension will continue. The basic differences between this Energy Order and a regular plan approval process is 1. Facility is allowed to operate a generator immediately without prior construction approval. However, the facility has to meet the same requirements as they would if they were applying for a regular construction approval and operating permit. 2. No control device is required on the source. Under the Order, Washington Department of Ecology will allow a source to operate without control on a temporary basis. They are thinking of defining &temporary8 as less than six months. After that the source must install a control device. It is unclear if a construction plan approval will be required to install the control device at that time. 3. The facility must obtain offsets or have a plan indicating how they are going to get offsets in the Energy Alert notification to the Department. There must be enough emission offsets to cover the operating time it would normally take to receive a plan approval from the Department. The normal time frame to receive a plan approval from the Department is approximately one month. The only advantage with the Order is that a source can operate immediately and without control device on a temporary basis as long as they follow all the requirements listed. Mary Schoen Environmental Strategies Enron Corp 713-345-7422