23 Aug 2001, 22:14 UTC
Weekend Outage Report for 8-24-01 through 8-27-01
- From
- Enron Change Management Announcement@ENRON 40enron@enron.com
- Date
- Thu, 23 Aug 2001 15:14:22 -0700 (PDT)
------------------------------------------------------------------------------------------------------ W E E K E N D S Y S T E M S A V A I L A B I L I T Y F O R August 24, 2001 5:00pm through August 27, 2001 12:00am ------------------------------------------------------------------------------------------------------ SCHEDULED SYSTEM OUTAGES: ARDMORE DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages. AZURIX: No Scheduled Outages. EB34 DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages. EDI SERVER: No Scheduled Outages. ENRON CENTER SOUTH DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages ENRON NORTH AMERICAN LANS: Impact: CORP Time: Sun 8/26/2001 at 12:00:00 AM CT thru Sun 8/26/2001 at 1:00:00 AM CT Sat 8/25/2001 at 10:00:00 PM PT thru Sat 8/25/2001 at 11:00:00 PM PT Sun 8/26/2001 at 6:00:00 AM London thru Sun 8/26/2001 at 7:00:00 AM London Outage: Increase bandwidth on the network core Environments Impacted: All Purpose: When users are moved to the new building the traffic on the core will increase significantly. Backout: revert back to the one link Contact(s): Christopher M Ducker 713-345-8241 FIELD SERVICES: No Scheduled Outages. INTERNET: No Scheduled Outages. MESSAGING: Impact: NAHOU-MSMIG01P through 08P. Time: Sat 8/25/2001 at 9:00:00 PM CT thru Sat 8/25/2001 at 11:00:00 PM CT Sat 8/25/2001 at 7:00:00 PM PT thru Sat 8/25/2001 at 9:00:00 PM PT Sun 8/26/2001 at 3:00:00 AM London thru Sun 8/26/2001 at 5:00:00 AM London Outage: Install CIM agents on Mail Migration Servers. Environments Impacted: Users attempting to access mail migration servers. Purpose: Agents needed for system monitoring. Backout: Remove CIM agents. Contact(s): David Devoll 713-345-8970 MARKET DATA: No Scheduled Outages. NT: No Scheduled Outages. OS/2: No Scheduled Outages. OTHER SYSTEMS: Impact: CORP Time: Fri 8/24/2001 at 4:00:00 PM CT thru Fri 8/24/2001 at 8:00:00 PM CT Fri 8/24/2001 at 2:00:00 PM PT thru Fri 8/24/2001 at 6:00:00 PM PT Fri 8/24/2001 at 10:00:00 PM London thru Sat 8/25/2001 at 2:00:00 AM London Outage: Enable BGP on London Routers/ IP Address Changes Environments Impacted: All Purpose: Change needed to provide full redundancy & optimized routing for the EOL London environment. Backout: Reboot the equipment (no config will be saved until each piece of equipment is operational.) Contact(s): James Hill 713-345-2551 Impact: CORP Time: Sat 8/25/2001 at 7:00:00 PM CT thru Sat 8/25/2001 at 10:00:00 PM CT Sat 8/25/2001 at 5:00:00 PM PT thru Sat 8/25/2001 at 8:00:00 PM PT Sun 8/26/2001 at 1:00:00 AM London thru Sun 8/26/2001 at 4:00:00 AM London Outage: Sombra CPU upgrade for server gutenberg. Environments Impacted: Livelink Purpose: Upgrade to cpus that protect against ecache parity error which cause system crashes. Backout: Role back to the old system configuration. Contact(s): Malcolm Wells 713-345-3716 Impact: EBS Time: Sat 8/25/2001 at 1:00:00 PM CT thru Sat 8/25/2001 at 7:00:00 PM CT Sat 8/25/2001 at 11:00:00 AM PT thru Sat 8/25/2001 at 5:00:00 PM PT Sat 8/25/2001 at 7:00:00 PM London thru Sun 8/26/2001 at 1:00:00 AM London Outage: EBS Lotus Notes Mail and Apps server moves to Corp Environments Impacted: EBS Purpose: EBS server migrations to Corp Backout: return equipment to original configuration Contact(s): Mark Jordan 713-562-4247 Martin Leo 503-886-0171 Jeff Hughes 713-416-7827 Keith Meurer 713-853-1743 Impact: CORP Time: Sat 8/25/2001 at 2:00:00 PM CT thru Sat 8/25/2001 at 10:00:00 PM CT Sat 8/25/2001 at 12:00:00 PM PT thru Sat 8/25/2001 at 8:00:00 PM PT Sat 8/25/2001 at 8:00:00 PM London thru Sun 8/26/2001 at 4:00:00 AM London Outage: Sombra CPU upgrade for E10K deathstar (chewbacca and skywalker). Environments Impacted: ERMS/Tagg Purpose: Upgrade to cpus that protect against ecache parity error which cause system crashes. Backout: Restore servers to their original configuration. Contact(s): Malcolm Wells 713-345-3716 Impact: EBS Time: Sat 8/25/2001 at 8:00:00 AM CT thru Sat 8/25/2001 at 12:30:00 PM CT Sat 8/25/2001 at 6:00:00 AM PT thru Sat 8/25/2001 at 10:30:00 AM PT Sat 8/25/2001 at 2:00:00 PM London thru Sat 8/25/2001 at 6:30:00 PM London Outage: EBS Database Migration Environments Impacted: EBS Purpose: EBS/ENW Intergration Backout: Switch database alias back to stjohns.enron.net Contact(s): Scott Williamson 713-853-6792 Jim Robertson 713-345-6905 713-854-7910 Impact: E-COMMERCE Time: Fri 8/24/2001 at 5:00:00 PM CT thru Fri 8/24/2001 at 7:00:00 PM CT Fri 8/24/2001 at 3:00:00 PM PT thru Fri 8/24/2001 at 5:00:00 PM PT Fri 8/24/2001 at 11:00:00 PM London thru Sat 8/25/2001 at 1:00:00 AM London Outage: E-Commerce Operations Server Impulse Environments Impacted: The PRODUCTION ENVIRONMENTS which will be affected are DealBench, ClickPaper, and Commodity Logic. The databases which will be affected are: clcllprd, dbnprod, clcgstp, pprprod, dbnllprd, clcprod, prtbprod. Purpose: The E-Commerce Operations Unix team has scheduled for impulse (production database server) to be down for approximately 2 hours during the maintenance window starting at 5:00pm. The maintenance to be performed is hardware replacement to fix the problem that occurred on 08/21. Any scheduled maintenance to applications will need to be performed AFTER this maintenance has been performed. Contact(s): Francis Gonzales 713-345-4738 Mai Nguyenon 713-345-4022 Impact: CPR Production Time: Sat 8/25/2001 at 6:00:00 PM CT thru Sun 8/26/2001 at 3:00:00 AM CT Sat 8/25/2001 at 4:00:00 PM PT thru Sun 8/26/2001 at 1:00:00 AM PT Sun 8/26/2001 at 12:00:00 AM London thru Sun 8/26/2001 at 9:00:00 AM London Outage: CPR Production Environments Impacted: CPR Users Purpose: CPR Database must be down for SkyWalker Hardware maintenance Backout: Contact(s): CPR Support 713-284-4175 SITARA: No Scheduled Outages. SUN/OSS SYSTEM: No Scheduled Outages. TELEPHONY: No Scheduled Outages TERMINAL SERVER: No Scheduled Outages. UNIFY: No Scheduled Outages. ------------------------------------------------------------------------------------------------------------------------------------- FOR ASSISTANCE (713) 853-1411 Enron Resolution Center Specific Help: Information Risk Management (713) 853-5536 SAP/ISC (713) 345-4727 Unify On-Call (713) 284-3757 [Pager] Sitara On-Call (713) 288-0101 [Pager] RUS/GOPS/GeoTools/APRS (713) 639-9726 [Pager] OSS/UA4/TARP (713) 285-3165 [Pager] CPR (713) 284-4175 [Pager] EDI Support (713) 327-3893 [Pager] EES Help Desk (713)853-9797 OR (888)853-9797 TDS -Trader Decision Support On-Call (713) 327-6032 [Pager]