12 Apr 2001, 04:41 UTC
Start Date: 4/12/01; HourAhead hour: 5; <CODESITE>
- From
- Schedule Crawler pete.davis@enron.com
- To
- Pete Davis
- Cc
- Bert Meyers, bill.williams.iii@enron.com, Craig Dean, dporter3@enron.com, Eric Linder, Geir Solberg, jbryson@enron.com, Leaf Harasin, Monika Causholli, Mark Guzman, Pete Davis, Ryan Slinger
- Bcc
- Bert Meyers, bill.williams.iii@enron.com, Craig Dean, dporter3@enron.com, Eric Linder, Geir Solberg, jbryson@enron.com, Leaf Harasin, Monika Causholli, Mark Guzman, Pete Davis, Ryan Slinger
- Date
- Wed, 11 Apr 2001 21:41:00 -0700 (PDT)
Start Date: 4/12/01; HourAhead hour: 5; No ancillary schedules awarded.
Variances detected.
Variances detected in Energy Import/Export schedule.
Variances detected in Load schedule.
LOG MESSAGES:
PARSING FILE -->> O:\Portland\WestDesk\California Scheduling\ISO Final
Schedules\2001041205.txt
---- Energy Import/Export Schedule ----
$$$ Variance found in table tblINTCHG_IMPEXP.
Details: (Hour: 5 / Preferred: 47.00 / Final: 46.99)
TRANS_TYPE: FINAL
SC_ID: ECTstSW
MKT_TYPE: 2
TRANS_DATE: 4/12/01
TIE_POINT: MEAD_2_WALC
INTERCHG_ID: EPMI_CISO_8000
ENGY_TYPE: WHEEL
$$$ Variance found in table tblINTCHG_IMPEXP.
Details: (Hour: 5 / Preferred: 12.00 / Final: 11.98)
TRANS_TYPE: FINAL
SC_ID: ECTRT
MKT_TYPE: 2
TRANS_DATE: 4/12/01
TIE_POINT: PVERDE_5_DEVERS
INTERCHG_ID: EPMI_CISO_DODGERS
ENGY_TYPE: WHEEL
---- Load Schedule ----
$$$ Variance found in table tblLoads.
Details: (Hour: 5 / Preferred: 42.68 / Final: 42.65)
TRANS_TYPE: FINAL
LOAD_ID: PGE3
MKT_TYPE: 2
TRANS_DATE: 4/12/01
SC_ID: EPMI