5 Jul 2001, 16:46 UTC
Weekend Outage Report for 7-6-01 through 7-9-01
- From
- Enron Announcements enron.announcements@enron.com
- Date
- Thu, 5 Jul 2001 09:46:00 -0700 (PDT)
------------------------------------------------------------------------------
------------------------
W E E K E N D S Y S T E M S A V A I L A B I L I T Y
F O R
July 6, 2001 5:00pm through July 9, 2001 12:00am
------------------------------------------------------------------------------
------------------------
ECS to ECN Network Interconnection July 14, 2001
This is a notification that the Enron Corp. I/T Networks team will be
connecting the new building network infrastructure located in Enron Center
South (ECS) to the existing Enron Center North (ECN) backbone network. While
this activity is not expected to produce a disruption to network services,
this notice is designed to alert the organization to our activities. No
network hardware or systems are anticipated to be shutdown. The actual
physical interconnection of the networks will be performed in the EB 34th
floor Data Center.
Interconnection activities are scheduled to occur the evening of July 14,
2001 starting from 7:00 p.m.(CT) and completing around 11:00 p.m. (CT).
Application testing activities will begin at 11:00 p.m. (CT) once all network
testing has completed.
If you have any further questions, please contact Pete Castrejana at
713-410-0642 for more information.
SCHEDULED SYSTEM OUTAGES:
ARDMORE DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages.
AZURIX: No Scheduled Outages.
EB34 DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages.
EDI SERVER: No Scheduled Outages.
ENRON CENTER SOUTH DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages
ENRON NORTH AMERICAN LANS:
Impact: CORP
Time: Fri 7/6/2001 at 7:00:00 PM CT thru Fri 7/6/2001 at 9:00:00 PM CT
Fri 7/6/2001 at 5:00:00 PM PT thru Fri 7/6/2001 at 7:00:00 PM PT
Sat 7/7/2001 at 1:00:00 AM London thru Sat 7/7/2001 at 3:00:00 AM London
Outage: Put NACAL-CLUSTER1 into production
Environments Impacted: Corp Calgary
Purpose: Current server (ECTCAL-FS1) running out of disk space
Backout: Turn on ECTCAL-FS01
Contact(s): Greg Hibbert
Impact: CORP
Time: Fri 7/6/2001 at 5:00:00 PM CT thru Fri 7/6/2001 at 9:00:00 PM CT
Fri 7/6/2001 at 3:00:00 PM PT thru Fri 7/6/2001 at 7:00:00 PM PT
Fri 7/6/2001 at 11:00:00 PM London thru Sat 7/7/2001 at 3:00:00 AM London
Outage: Calgary Network Upgrade
Environments Impacted: Corp Calgary
Purpose: Processors in existing Cisico 3810 routers are maxed out causing
sessions to freeze on Terminal Server and updates from CQG.
Backout: Put old Cisco 3810 back into production.
Contact(s): Brad K Martin (403) 974-6922 (403)212-9280
Todd Bowen (403) 974-6951
Greg Hibbert (403) 974-6785
FIELD SERVICES: No Scheduled Outages.
INTERNET:
Impact: CORP
Time: Fri 7/6/2001 at 5:15:00 PM CT thru Fri 7/6/2001 at 5:45:00 PM CT
Fri 7/6/2001 at 3:15:00 PM PT thru Fri 7/6/2001 at 3:45:00 PM PT
Fri 7/6/2001 at 11:15:00 PM London thru Fri 7/6/2001 at 11:45:00 PM London
Outage: Install Bypass Firewalls for EOL
Environments Impacted: Corp
Purpose: Firewalls needed to ease the load on the Local Directors
Backout: Remove Bypass Firewalls
Contact(s): James Hill 713-345-2551
Impact: CORP
Time: Fri 7/6/2001 at 6:00:00 PM CT thru Fri 7/6/2001 at 11:00:00 PM CT
Fri 7/6/2001 at 4:00:00 PM PT thru Fri 7/6/2001 at 9:00:00 PM PT
Sat 7/7/2001 at 12:00:00 AM London thru Sat 7/7/2001 at 5:00:00 AM London
Outage: EOL Terminal Server Relocation Phase II
Environments Impacted: EOL
Purpose: Servers are blowing hot air and causing thermal problems on other
units. Server need to be relocated to a environment with redundant network
capabilities. Space is needed for UNIX/Network equipment.
Backout: Leave servers online where they are at
Contact(s): Todd Thelen 713-853-9320
Andrew Hawthorn 713-853-6069 877-345-0586
Guy Schlein 713-853-6865
Kevin Hopper 713-853-7989
MESSAGING: No Scheduled Outages.
MARKET DATA: No Scheduled Outages.
NT: No Scheduled Outages.
OS/2: No Scheduled Outages.
OTHER SYSTEMS:
Impact: CORP
Time: Sat 7/7/2001 at 2:00:00 AM CT thru Sun 7/8/2001 at 6:00:00 PM CT
Sat 7/7/2001 at 12:00:00 AM PT thru Sun 7/8/2001 at 4:00:00 PM PT
Sat 7/7/2001 at 8:00:00 AM London thru Mon 7/9/2001 at 12:00:00 AM London
Outage: Upgrade RMSPROD
Environments Impacted: ENA
Purpose: Take advantage of new features for better performance and to
accommodate larger data volume and usage.
Backout: The only way to back out is a complete refresh from backup. This
process will take 6.5 - 7.5 Hours to complete if required
Contact(s): Emmett Cleveland 713-853-3873
SITARA: No Scheduled Outages.
SUN/OSS SYSTEM: No Scheduled Outages.
TELEPHONY: No Scheduled Outages
TERMINAL SERVER: No Scheduled Outages.
UNIFY: No Scheduled Outages.
------------------------------------------------------------------------------
-------------------------------------------------------
FOR ASSISTANCE
(713) 853-1411 Enron Resolution Center
Specific Help:
Information Risk Management (713) 853-5536
SAP/ISC
(713) 345-4727
Unify On-Call (713) 284-3757 [Pager]
Sitara On-Call (713) 288-0101 [Pager]
RUS/GOPS/GeoTools/APRS (713) 639-9726 [Pager]
OSS/UA4/TARP (713) 285-3165 [Pager]
CPR (713) 284-4175 [Pager]
EDI Support (713) 327-3893 [Pager]
EES Help Desk (713)853-9797 OR (888)853-9797